NPDES PRR10008U · Clean Water Act
GSA - FEDERAL CENTER HURRICANE RECOVERY PROJECT - GUAYNABO, Guaynabo, PR: NPDES PRR10008U discharge permit, effluent exceedances, inspections, penalties
GSA - FEDERAL CENTER HURRICANE RECOVERY PROJECT - GUAYNABO, Guaynabo, Puerto Rico: General permit coverage PRR10008U, held by Integrated Construction Services, LLC; Construction stormwater; Administratively continued; issued October 24, 2019, term to February 15, 2022, by U.S. EPA.
Puerto Rico holds 418 Construction stormwater coverages of this permit type in EPA’s file; 14 were issued before PRR10008U. Integrated Construction Services, LLC holds 3 permits in Puerto Rico.
Other permits held by Integrated Construction Services, LLC
- GSA - FEDERAL CENTER HURRICANE RECOVERY PROJECT - GUAYNABO, Guaynabo: PRR1000ET, issued 2022-07-15
- CEMENTERIO EL BUEN PASTOR, Trujillo Alto: PRR1000JJ, issued 2024-06-03
Coverages issued nearest PRR10008U
- 2019-01-02: JOSE GAUTIER BENITEZ REVITALIZATION, Caguas: PRR10005V, held by F&R Construction Group, Inc
- 2019-01-03: DEVELOPMENT OF NINETEEN (19) RESIDENTIAL LOTS, Aguada: PRR10005Y, held by Hammer Contractors Advisor Corp.
- 2019-01-10: MIRADOR DEL SOL, Cabo Rojo: PRR10005T, held by Karimar Construction, Inc.
- 2019-03-21: RIVIERA MULTI-PHASE PLANNED COMMUNITY, Bayamon: PRR10006R, held by VRM 2018,LLC
- 2019-06-18: RIO DE LA PLATA FLOOD CONTROL-DORADO BRIDGE CHANNEL WIDENING & SCOUR PROTECTION, Dorado: PRR100086, held by JACKSONVILLE DISTRICT CORPS OF ENGINEERS
- 2020-02-28: WESTMEYER RESIDENCE, LOT 20 BAHIA BEACH, Rio Grande: PRR10009I, held by Riax interior general contractor Corp
- 2020-03-24: AGUADILLA PIER, Aguadilla: PRR10009O, held by RL Partners, LLC
- 2020-07-24: PONCE HEALTH AND SCIENCES UNIVERSITY - NEW ACADEMIC AND CLINIC BUILDINGS, Ponce: PRR1000A4, held by Venegas Construction Corporation
- 2020-07-28: RELOCATION OF THE BORINQUEN POTABLE WATER TRANSMISSION PIPELINE, Hato Rey: PRR1000A6, held by Costa Mar Group LLC
- 2020-08-18: ER-HWY-474 LANDSLIDE AND ROAD DAMAGE REPAIR, PR-143, KM 56.1, BARRANQUITAS PR, Barranquitas: PRR1000AC, held by CAC CRESPO BUILDERS, LLC
GSA - FEDERAL CENTER HURRICANE RECOVERY PROJECT - GUAYNABO among its neighbors
33 discharge permits are in the Cienaga de las Cucharillas Drainage Watershed subwatershed (HUC 210100050503); PRR10008U is one.
Other permits in the Cienaga de las Cucharillas Drainage Watershed subwatershed (HUC 210100050503)
- ABF FREIGHT SYSTEM, INC., Guaynabo: PRNOEJ00Q, minor, term to 2025-02-24
- ARMY RESERVE TRAINING CENTER (USARC) AT FORT BUCHANAN, Guaynabo: PRR1000LG, minor, term to 2027-02-16
- BACARDI CORP, Catano: PRR05BJ63
- BACARDI CORP, Catano: PRR12A289
- BACARDI CORPORATION, CatañO: PRR053117, minor, term to 2020-06-03
- BACARDI CORPORATION, San Juan: PRR053119, minor, term to 2020-06-03
- BAXTER HEALTHCARE SA - CATANO, Catano: PRNOEJ01Z, minor, term to 2027-11-11
- BEST PETROLEUM CORP., Guaynabo: PRNOE0002, minor, term to 2023-04-17
- CEMEX GUAYNABO I READY MIX SITE, Guaynabo: PRR05BO94
- ECOLAB MANUFACTURING, INC, Bayamon: PRNOE3265, minor, term to 2021-01-19
Identity
| Facility | GSA - FEDERAL CENTER HURRICANE RECOVERY PROJECT - GUAYNABO |
|---|---|
| Permittee | Integrated Construction Services, LLC |
| NPDES ID | PRR10008U |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | October 24, 2019 |
| Expires | February 15, 2022 |
| Agency | U.S. EPA |
| Address | Guaynabo, PR 00966 |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Cienaga de las Cucharillas Drainage Watershed (HUC 210100050503) |
NPDES PRR10008U: effluent limits and exceedances
GSA - FEDERAL CENTER HURRICANE RECOVERY PROJECT - GUAYNABO (NPDES PRR10008U): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES PRR10008U: no pollutant row on file.
NPDES PRR10008U: inspections, violations and enforcement
NPDES PRR10008U (GSA - FEDERAL CENTER HURRICANE RECOVERY PROJECT - GUAYNABO): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES PRR10008U
NPDES PRR10008U: one email when its EPA record changes — $99/month.
Permits near NPDES PRR10008U
NPDES PRR10008U: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.