Velarion Records
Free: one email when NPDES PRR10BT32 changes. Unsubscribe any time.

NPDES PRR10BT32 · Clean Water Act

RIO PUERTO NUEVO FLOOD CONTROL PROJECT, BECHARA INDUSTRIAL PARK, San Juan, PR: NPDES PRR10BT32 discharge permit, effluent exceedances, inspections, penalties

RIO PUERTO NUEVO FLOOD CONTROL PROJECT, BECHARA INDUSTRIAL PARK, San Juan, Puerto Rico: General permit coverage PRR10BT32, held by Rio Puerto Nuevo Flood Control Project; Construction stormwater; Pending.

Puerto Rico holds 418 Construction stormwater coverages of this permit type in EPA’s file.

RIO PUERTO NUEVO FLOOD CONTROL PROJECT, BECHARA INDUSTRIAL PARK among its neighbors

Its county: 28, 5 major; PRR10BT32 is a permit EPA has not classed major or minor.

Other permits in the county

What stands out

  • No dated event in the 365 days to September 15, 2026.
  • It is one of 1,076 discharge permits on the register in Puerto Rico; 418 of them (39%) are in its program, Construction stormwater.

Identity

FacilityRIO PUERTO NUEVO FLOOD CONTROL PROJECT, BECHARA INDUSTRIAL PARK
PermitteeRio Puerto Nuevo Flood Control Project
NPDES IDPRR10BT32
StatusPending
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
AddressSan Juan, PR 00907

NPDES PRR10BT32: effluent limits and exceedances

RIO PUERTO NUEVO FLOOD CONTROL PROJECT, BECHARA INDUSTRIAL PARK (NPDES PRR10BT32): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES PRR10BT32: no pollutant row on file.

NPDES PRR10BT32: inspections, violations and enforcement

NPDES PRR10BT32 (RIO PUERTO NUEVO FLOOD CONTROL PROJECT, BECHARA INDUSTRIAL PARK): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES PRR10BT32

NPDES PRR10BT32: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES PRR10BT32

NPDES PRR10BT32: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.