NPDES RIR101749 · Clean Water Act
PROPOSED STORAGE FACILITY, Coventry, RI: NPDES RIR101749 discharge permit, effluent exceedances, inspections, penalties
PROPOSED STORAGE FACILITY, Coventry, Rhode Island: General permit coverage RIR101749, held by PETER & GLORIA SILVERMAN; Construction stormwater; Administratively continued; issued August 7, 2018, term to September 25, 2020; discharges to MAPLE ROOT POND.
- June 18, 2019: WW Storm Water Construction - Failure to submit required report (non-DMR) (ST6).
- June 18, 2019: WW Storm Water Construction - Failure to properly operate and maintain BMPs (ST6).
- June 18, 2019: WW Storm Water Construction - Failure to properly install/implement BMPs (ST6).
Rhode Island holds 51 Construction stormwater coverages of this permit type in EPA’s file; 44 were issued before RIR101749.
Coverages issued nearest RIR101749
- 2018-01-17: WESTERLY CROSSING EXPANSION, Westerly: RIR101453, held by WESTERLY VENTURES, LLC
- 2018-01-19: SACHEM ACRES RESIDENTIAL SUB-DIVISION, North Kingstown: RIR101661, held by KINGSTOWN PROPERTIES, LLC
- 2018-06-05: GENERAL DYNAMICS BLDGS B2024&B2025, North Kingstown: RIR101754, held by GENERAL DYNAMICS ELECTRIC BOAT, INC
- 2018-06-19: PROPOSED STORAGE FACILITY & COMMERCIAL DEVELOPMENT, Warwick: RIR101718, held by MALIBU INVESTMENTS, LLC
- 2018-07-13: PARCEL 42 SITE & DRAINAGE IMPROVEMENTS, North Kingstown: RIR101666, held by QUONSET DEVELOPMENT CORPORATION
- 2018-09-14: GREEN FARM ESTATES, Coventry: RIR101740, held by NORTH ROAD LAND COMPANY, LLC
- 2018-11-21: CROMPTON MEADOWS, Coventry: RIR101779, held by CROMPTON MEADOWS, LLC
- 2019-08-30: PROPOSED REDEVELOPMENT, Middletown: RIR101913, held by GCRI MIDDLETOWN, LLC
- 2025-08-22: MISTER TREE, INC., Exeter: RIR102736, held by SCOTT LABOSSIERE
PROPOSED STORAGE FACILITY among its neighbors
2 discharge permits are in the Headwaters South Branch Pawtuxet River subwatershed (HUC 010900040602); RIR101749 is one.
Other permits in the Headwaters South Branch Pawtuxet River subwatershed (HUC 010900040602)
- GENTLEMAN FARMER RESTAURANT, Coventry: RIR100695, minor, term to 2008-09-09
What stands out
- Its term runs 2 years and 49 days, August 7, 2018 to September 25, 2020; the term ended 2,181 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is a single-event violation on June 18, 2019, 2,646 days before EPA's file was loaded.
- No dated event in the 365 days to September 15, 2026.
- EPA's file dates 3 events for it, all in 2019.
- It is one of 642 discharge permits on the register in Rhode Island; 51 of them (7.9%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PROPOSED STORAGE FACILITY |
|---|---|
| Permittee | PETER & GLORIA SILVERMAN |
| NPDES ID | RIR101749 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 7, 2018 |
| Expires | September 25, 2020 |
| Address | Coventry, RI 02816 |
| Receiving water | MAPLE ROOT POND |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Headwaters South Branch Pawtuxet River (HUC 010900040602) |
NPDES RIR101749: effluent limits and exceedances
PROPOSED STORAGE FACILITY (NPDES RIR101749): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES RIR101749: no pollutant row on file.
NPDES RIR101749: inspections, violations and enforcement
NPDES RIR101749: 3 single-event violations
| Date | What EPA recorded | Agency |
|---|---|---|
| June 18, 2019 | WW Storm Water Construction - Failure to submit required report (non-DMR) | ST6 |
| June 18, 2019 | WW Storm Water Construction - Failure to properly operate and maintain BMPs | ST6 |
| June 18, 2019 | WW Storm Water Construction - Failure to properly install/implement BMPs | ST6 |
NPDES RIR101749 (PROPOSED STORAGE FACILITY): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES RIR101749
NPDES RIR101749: one email when its EPA record changes — $99/month.
Permits near NPDES RIR101749
NPDES RIR101749: 0 pollutant rows, 3 dated events; ICIS-NPDES download, loaded September 15, 2026.