Velarion Records
Free: one email when NPDES SC0002925 changes. Unsubscribe any time.

NPDES SC0002925 · Clean Water Act

DUKE ENERGY PROGRESS LLC/H.B. ROBINSON NUCLEAR PLANT, Hartsville, SC: NPDES SC0002925 discharge permit, effluent exceedances, inspections, penalties

DUKE ENERGY PROGRESS LLC/H.B. ROBINSON NUCLEAR PLANT, Hartsville, South Carolina: Individual permit SC0002925, held by (Unknown Permittee); Administratively continued; issued March 8, 2007, term to April 30, 2011, by State.

2 of the 23 pollutants listed for NPDES SC0002925 have no violation or effluent exceedance.

  • Oil and grease, hexane extr method: 10 limits, 19 violations of any kind, 5 effluent exceedances, latest September 30, 2023, largest 120% over the limit.
  • Solids, total suspended: 13 limits, 19 violations of any kind, 2 effluent exceedances, latest March 31, 2024, largest 213% over the limit.
  • Iron, total [as Fe]: 7 limits, 11 violations of any kind, 2 effluent exceedances, latest December 31, 2013, largest 117% over the limit.
  • Temperature, water deg. fahrenheit: 7 limits, 4 violations of any kind, 1 effluent exceedance, latest October 31, 2012, largest 22% over the limit.
  • Flow, in conduit or thru treatment plant: 18 limits, 20 violations of any kind.
  • pH: 17 limits, 18 violations of any kind.
  • Copper, total [as Cu]: 5 limits, 7 violations of any kind.
  • Cadmium, total [as Cd]: 4 limits, 4 violations of any kind.
  • BOD, 5-day, 20 deg. C: 2 limits, 2 violations of any kind.
  • Arsenic, total [as As]: 2 limits, 2 violations of any kind.
  • Chromium, total [as Cr]: 2 limits, 2 violations of any kind.
  • Lead, total [as Pb]: 2 limits, 2 violations of any kind.
  • Nickel, total [as Ni]: 2 limits, 2 violations of any kind.
  • Zinc, total [as Zn]: 2 limits, 2 violations of any kind.
  • Selenium, total [as Se]: 2 limits, 2 violations of any kind.
  • Mercury, total [as Hg]: 2 limits, 2 violations of any kind.
  • Coliform, fecal general: 2 limits, 2 violations of any kind.
  • %Effect Static Renewal 7 Day Chronic Ceriodaphnia dubia: 2 limits, 2 violations of any kind.
  • %Mortality 7Day Chronic Ceriodaphnia dubia: 2 limits, 2 violations of any kind.
  • %Repro Reduc Static Renewal7D Chronic Ceriodaphnia dubia: 2 limits, 2 violations of any kind.
  • Chlorine, total residual: 1 limit, 1 violation of any kind.
  • LC50 Static 48Hr Acute Ceriodaphnia dubia: 1 limit.
  • IC25 Static Renewal 7 Day Chronic Ceriodaphnia dubia: 1 limit.

Other permits held by (Unknown Permittee)

DUKE ENERGY PROGRESS LLC/H.B. ROBINSON NUCLEAR PLANT among its neighbors

5 discharge permits are in the Lake Robinson-Black Creek subwatershed (HUC 030402010606); SC0002925 is one. Its county: 132, 3 major; SC0002925 is major permit.

Other permits in the Lake Robinson-Black Creek subwatershed (HUC 030402010606)

What stands out

  • Its term runs 4 years and 53 days, March 8, 2007 to April 30, 2011; the term ended 5,617 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
  • No dated event in the 365 days to September 15, 2026.
  • 4 of its 23 pollutants on file have an effluent exceedance (17%); 23 are under a numeric limit; the largest exceedance is Solids, total suspended at 213% over its limit.
  • It is one of 13,763 discharge permits on the register in South Carolina; the file names no program for it, and it is a major discharger.

Identity

FacilityDUKE ENERGY PROGRESS LLC/H.B. ROBINSON NUCLEAR PLANT
Permittee(Unknown Permittee)
NPDES IDSC0002925
StatusAdministratively continued
TypeIndividual permit
ClassMajor
Facility typeNon-POTW
IssuedMarch 8, 2007
ExpiresApril 30, 2011
AgencyState
AddressHartsville, SC 29550
SubwatershedLake Robinson-Black Creek (HUC 030402010606)
Other EPA IDs (FRS)RCRA handler SCD048374920; ICIS-AIR source SC00008200002

NPDES SC0002925: effluent limits and exceedances

DUKE ENERGY PROGRESS LLC/H.B. ROBINSON NUCLEAR PLANT (NPDES SC0002925): 23 pollutants on file, 23 limited; 21 with a violation of any kind, 4 with an exceedance.

How exceedances are counted.

PollutantLimitsViolationsExceedancesLatestLargest, as filed
Oil and grease, hexane extr method10195September 30, 2023120% over the limit
Solids, total suspended13192March 31, 2024213% over the limit
Iron, total [as Fe]7112December 31, 2013117% over the limit
Temperature, water deg. fahrenheit741October 31, 201222% over the limit
Flow, in conduit or thru treatment plant18200
pH17180
Copper, total [as Cu]570
Cadmium, total [as Cd]440
BOD, 5-day, 20 deg. C220
Arsenic, total [as As]220
Chromium, total [as Cr]220
Lead, total [as Pb]220
Nickel, total [as Ni]220
Zinc, total [as Zn]220
Selenium, total [as Se]220
Mercury, total [as Hg]220
Coliform, fecal general220
%Effect Static Renewal 7 Day Chronic Ceriodaphnia dubia220
%Mortality 7Day Chronic Ceriodaphnia dubia220
%Repro Reduc Static Renewal7D Chronic Ceriodaphnia dubia220
Chlorine, total residual110
LC50 Static 48Hr Acute Ceriodaphnia dubia100
IC25 Static Renewal 7 Day Chronic Ceriodaphnia dubia100

NPDES SC0002925: inspections, violations and enforcement

NPDES SC0002925 (DUKE ENERGY PROGRESS LLC/H.B. ROBINSON NUCLEAR PLANT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES SC0002925

NPDES SC0002925: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES SC0002925

NPDES SC0002925: 23 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.