NPDES SCR10Z91R · Clean Water Act
XL STORAGE PHASE 2, Fair Play, SC: NPDES SCR10Z91R discharge permit, effluent exceedances, inspections, penalties
XL STORAGE PHASE 2, Fair Play, South Carolina: General permit coverage SCR10Z91R, held by TImothy Ramsey, N/A; Construction stormwater; Effective; issued September 30, 2021, term to September 29, 2026, by State.
South Carolina holds 11,300 Construction stormwater coverages of this permit type in EPA’s file; 206 were issued before SCR10Z91R.
Coverages issued nearest SCR10Z91R
- 2021-09-29: STARBUCKS AND POPEYES AT JOHN B WHITE BLVD, Spartanburg: SCR10Z91K, held by Greg Carter, CGW Holdings LLC
- 2021-09-30: WOODLAND SHORES SUBDIVISION, James Island: SCR10Z91L, held by Adam Baslow, Adam Baslow
- 2021-09-30: CAMP HALL CAMPUS 4A, Na: SCR10Z91M, held by John Gaskin, Camp Hall 4A Owner LLC Delaware LLC
- 2021-09-30: CITY OF MYRTLE BEACH GREY STREET IMPROVEMENT, Myrtle Beach: SCR10Z91N, held by Chris Miller, City of Myrtle Beach
- 2021-09-30: TUCKER TRACT, Na: SCR10Z91Q, held by Dion Matheney, MTS CHS LLC
- 2021-09-30: THE ELLE, Bluffton: SCR10Z91S, held by Mike Klein, The Elle Apartments LLC
- 2021-09-30: HARDEEVILLE PROFESSIONAL BUILDING, Hardeeville: SCR10Z91T, held by Sidney Smith, Dr. Sidney Smith
- 2021-09-30: THE HUB, Spartanburg: SCR10Z91U, held by Miachael Fletcher, Hub Development LLC
- 2021-09-30: FRENCH QUARTER CREEK PHASE 3 (3A, 3B, 3C & 3D), Na: SCR10Z91V, held by Dion Matheney, MTS CHS LLC
- 2021-09-30: WATERSIDE PHASE 1, North Myrtle Beach: SCR10Z91X, held by Jamie Moore, Meritage Homes of the Carolinas Inc.
XL STORAGE PHASE 2 among its neighbors
22 discharge permits are in the Lower Tugaloo River subwatershed (HUC 030601020507); SCR10Z91R is one. Its county: 219, 1 major; SCR10Z91R is minor permit.
Other permits in the Lower Tugaloo River subwatershed (HUC 030601020507)
- AMES CONSTRUCTION I-40 RCC PLANT, Clyde: NCG140557, minor, term to 2027-06-30
- CURRAHEE CLUB - CONSTRUCTION ENTRANCE, Unknown: GAR335181, minor, term to 2018-07-31
- CURRAHEE CLUB WASTEWATER TREATMENT PLANT, LAND APPLICATION SYSTEM & PUMPING STAT, Unknown: GAR335175, minor, term to 2018-07-31
- FAIRPLAY WELCOME CENTER AND BEAUTIFICATION, Fairplay: SCR10ZGQA, minor, term to 2030-01-12
- FRANKLIN SPEC IV, Lavonia: GAR141736, minor, term to 2018-07-31
- GOLDEN SHORES, Westminster: SCR10ZJ4C, minor, term to 2030-08-07
- HAERING, Lavonia: GAR369803, minor, term to 2018-07-31
- HAERING PRECISION USA LP, Lavonia: GAIS13866, minor, term to 2027-05-31
- HAMPTON INN MOTEL - LAVONIA GA, Lavonia: GAR138125, minor, term to 2018-07-31
- HIGHLAND RIDGE - PHASE 1 - LOT #6, Hartwell: GAR3968D8, minor, term to 2028-07-31
What stands out
- Its term runs 4 years and 364 days, September 30, 2021 to September 29, 2026; the term ended 15 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as effective.
- No dated event in the 365 days to October 14, 2026.
- It is one of 13,763 discharge permits on the register in South Carolina; 11,300 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | XL STORAGE PHASE 2 |
|---|---|
| Permittee | TImothy Ramsey, N/A |
| NPDES ID | SCR10Z91R |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 30, 2021 |
| Expires | September 29, 2026 |
| Agency | State |
| Address | Fair Play, SC 29643 |
| Subwatershed | Lower Tugaloo River (HUC 030601020507) |
NPDES SCR10Z91R: effluent limits and exceedances
XL STORAGE PHASE 2 (NPDES SCR10Z91R): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SCR10Z91R: no pollutant row on file.
NPDES SCR10Z91R: inspections, violations and enforcement
NPDES SCR10Z91R (XL STORAGE PHASE 2): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SCR10Z91R
NPDES SCR10Z91R: one email when its EPA record changes — $99/month.
Permits near NPDES SCR10Z91R
NPDES SCR10Z91R: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.