RIDGEVILLE INDUSTRIAL CAMPUS ACCESS ROAD PHASE 2, held by Walter Lagarenne Jr., South Carolina Ports Authority, holds NPDES permit SCR10Z9QW. EPA’s file records it issued June 23, 2022 and expiring January 26, 2027. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for RIDGEVILLE INDUSTRIAL CAMPUS ACCESS ROAD PHASE 2: its NPDES ID, its permit type and status, its dates, its address in Na, South Carolina. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES SCR10Z9QW.
What stands out
- Its term runs 4 years and 217 days, June 23, 2022 to January 26, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 13,763 discharge permits on the register in South Carolina; 11,300 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | RIDGEVILLE INDUSTRIAL CAMPUS ACCESS ROAD PHASE 2 |
|---|---|
| Permittee as filed | Walter Lagarenne Jr., South Carolina Ports Authority |
| NPDES ID | SCR10Z9QW |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | June 23, 2022 |
| Expiration date | January 26, 2027 |
| Issuing agency | State |
| Address | Na, SC |
| Subwatershed | Timothy Creek (HUC 030502050310) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES SCR10Z9QW.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES SCR10Z9QW.
Inspections
EPA’s inspection file holds no inspection for NPDES SCR10Z9QW.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES SCR10Z9QW.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, SCR10Z9QW.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID SCR10Z9QW there.
RIDGEVILLE INDUSTRIAL CAMPUS ACCESS ROAD PHASE 2, Na, South Carolina: Coverage under a general permit SCR10Z9QW, held by Walter Lagarenne Jr., South Carolina Ports Authority; Construction stormwater; Effective; issued June 23, 2022, term to January 26, 2027, by State.
South Carolina holds 11,300 Construction stormwater coverages of this permit type in EPA’s file; 1,805 were issued before SCR10Z9QW.
Coverages issued nearest SCR10Z9QW
- 2022-06-22: GEOCYCLE, Na: SCR10ZAR9, held by Mike Norkum, Geocycle LLC
- 2022-06-22: CHECKERS ASHLEY PHOSPHATE, N Charleston: SCR10ZARA, held by Val Nasano, Carolina Retail Centers
- 2022-06-22: PORT CITY CENTRE BUILDING 1, Summerville: SCR10ZARC, held by Dave Williams, Landmark Industrial LLC
- 2022-06-22: KINGS GRANT MITIGATION SITE, N Charleston: SCR10ZARD, held by Mark Messersmith, South Carolina Ports Authority
- 2022-06-22: 1410 17TH AVE, Conway: SCR10ZARE, held by Joey Ganassa, America First Management
- 2022-06-23: OCEANVIEW DRAINAGE IMPROVEMENTS, James Island: SCR10ZARF, held by Niki Grimball, Town of James Island
- 2022-06-23: CIP #SS7258; GRAVITY SS FROM GREENLAWN DR TO BURNSIDE #1 PS - PHASE 2, Columbia: SCR10ZARG, held by John Riggs, City Of Columbia
- 2022-06-23: JUSHI SILO FOUNDATION, Columbia: SCR10ZARH, held by Zhen Guo Yang, China Jushi USA Corporation
- 2022-06-23: CAROLINA GYPSUM SITE IMPROVEMENTS, N/A: SCR10ZARJ, held by Will Few, Carolina Gypsum
- 2022-06-23: HOLY TRINITY CLASSICAL CHRISTIAN SCHOOL SITE EXPANSION, Beaufort: SCR10ZARK, held by Joseph Lawrence, Holy Trinity Classical Christian School Inc.
RIDGEVILLE INDUSTRIAL CAMPUS ACCESS ROAD PHASE 2 among its neighbors
41 discharge permits are in the Timothy Creek subwatershed (HUC 030502050310); SCR10Z9QW is one. Its county: 455, 3 major; SCR10Z9QW is minor permit.
Other permits in the Timothy Creek subwatershed (HUC 030502050310)
- AUTONOMOUS DRIVE 115-12KV SUBSTATION, Na: SCR10ZCAN, minor, term to 2028-02-16
- AUTONOMOUS DRIVE UNDERGROUND ELECTRIC, Ridgeville: SCR10ZC5N, minor, term to 2028-02-01
- BEC MILL BRANCH SUBSTATION, Na: SCR10ZBV8, minor, term to 2027-11-16
- BERKELEY BAY, Ridgeville: SCR10ZDDJ, minor, term to 2028-07-27
- CAMP HALL AVIAN COMMONS BUILDING SITE PHASE 1, Ridgeville: SCR10ZJBS, minor, term to 2030-09-16
- CAMP HALL BOULEVARD PHASE 2, Na: SCR10ZE2T, minor, term to 2028-11-13
- CAMP HALL CAMPUS 1 PARCEL 4, Na: SCR10ZAUT, minor, term to 2027-07-06
- CAMP HALL CAMPUS 1 PARCEL 6 & 7, Na: SCR10ZDVG, minor, term to 2028-10-09
- CAMP HALL CAMPUS 4 EARLY SITE PACKAGE, Na: SCR10ZA04, minor, term to 2027-03-07
- CAMP HALL CAMPUS 4A, Na: SCR10Z91M, minor, term to 2026-09-29
Nearby on the register
- Discharge permits in Na
- Every permit record in Na, A to Z
- Discharge permits in South Carolina
- Every permit record in South Carolina, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
RIDGEVILLE INDUSTRIAL CAMPUS ACCESS ROAD PHASE 2 is one of 399 storm water construction permits on EPA's NPDES register in Dorchester County, South Carolina, including this one. It sits within the Timothy Creek subwatershed (HUC 030502050310), which holds 40 NPDES permits in total, this one included. Of the 399 Dorchester County storm water construction permits, 17.0% were issued earlier than this one, and 0.0% carry a violation on file.