Clean Water Act discharge permit · NPDES SCR10ZBLG
WOODCREEK PHASE B5 PHASE 2, Elgin, SC: NPDES SCR10ZBLG discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
WOODCREEK PHASE B5 PHASE 2, held by Harold Pickrel, holds NPDES permit SCR10ZBLG. EPA’s file records it issued October 18, 2022 and expiring October 17, 2027. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for WOODCREEK PHASE B5 PHASE 2: its NPDES ID, its permit type and status, its dates, its address in Elgin, South Carolina. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES SCR10ZBLG.
What stands out
- Its term runs 4 years and 364 days, October 18, 2022 to October 17, 2027.
- No dated event in the 365 days to September 15, 2026.
- It is one of 13,763 discharge permits on the register in South Carolina; 11,300 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | WOODCREEK PHASE B5 PHASE 2 |
|---|---|
| Permittee as filed | Harold Pickrel |
| NPDES ID | SCR10ZBLG |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | October 18, 2022 |
| Expiration date | October 17, 2027 |
| Issuing agency | State |
| Address | Elgin, SC 29045 |
| Subwatershed | Upper Spears Creek (HUC 030501040401) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES SCR10ZBLG.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES SCR10ZBLG.
Inspections
EPA’s inspection file holds no inspection for NPDES SCR10ZBLG.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES SCR10ZBLG.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, SCR10ZBLG.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID SCR10ZBLG there.
WOODCREEK PHASE B5 PHASE 2, Elgin, South Carolina: Coverage under a general permit SCR10ZBLG, held by Harold Pickrel; Construction stormwater; Effective; issued October 18, 2022, term to October 17, 2027, by State.
South Carolina holds 11,300 Construction stormwater coverages of this permit type in EPA’s file; 2,599 were issued before SCR10ZBLG. Harold Pickrel holds 10 permits in South Carolina.
Other permits held by Harold Pickrel
- NEWLAND ROAD EXTENSION, Near Elgin: SCR10ZC7J, issued 2023-02-03
- VICTORYWOODS VILLAGE PHASE 3, Near Elgin: SCR10ZCMX, issued 2023-03-31
- THE FALLS TOWNHOMES, N/A: SCR10ZCPF, issued 2023-04-06
- FINLAY FARMS PHASE 4, Lexington County: SCR10ZDDB, issued 2023-07-28
- ASTORIA, Elgin: SCR10ZEPE, issued 2024-02-22
- VICTORYWOODS VILLAGE PHASE 2, Elgin: SCR10ZESN, issued 2024-03-06
- CALLICO FARMS PHASE I, Lexington County: SCR10ZH4J, issued 2025-03-11
- CALLICO FARMS PHASE 1 OFFSITE WATER AND SEWER, Lexington: SCR10ZHFB, issued 2025-04-18
- CALLICO FARMS PHASE 1 OFFSITE WATER AND SEWER, Lexington: SCR10ZK3C, issued 2026-01-08
Coverages issued nearest SCR10ZBLG
- 2022-10-18: ATLAS ACRES, Pelzer: SCR10ZBLB, held by Yury Shtern, N/A
- 2022-10-18: CAROLINA GROVES PHASE 1RB, Moncks Corner: SCR10ZBLC, held by Kurt Sandness, Forestar Real Estate Group Inc.
- 2022-10-18: CAROLINA GROVES PHASE 2, Moncks Corner: SCR10ZBLD, held by Kurt Sandness, Forestar Real Estate Group Inc.
- 2022-10-18: PINEHAVEN POINTE 2, Laurens: SCR10ZBLE, held by Kavita Borsum, Brooks Court Partners LLC
- 2022-10-18: CAROLINA GROVES AMENITY CENTER, Moncks Corner: SCR10ZBLF, held by Kurt Sandness, Forestar Real Estate Group Inc.
- 2022-10-19: JORDANVILLE ROAD WATER MAIN, Conway: SCR10ZBL8, held by Ashley Proctor, Bucksport Water System
- 2022-10-19: CHERRY RD AT OLD STONE CHURCH RD INT. IMPROVEMENT, Clemson: SCR10ZBLL, held by Anthony Putnam, Clemson University
- 2022-10-19: PLEMMONS ROAD COMMERCIAL DEVELOPMENT, Duncan: SCR10ZBLM, held by Ryan Krall, SC Duncan Plemmons, LLC
- 2022-10-19: HIGHWAY 101 STARBUCKS, Greer: SCR10ZBLN, held by David Burriss, Highway 101 Starbucks QOZB, LLC
- 2022-10-19: COTTONWOOD RIDGE, Piedmont: SCR10ZBLR, held by Joseph Waldron`, Mark III Properties, LLC
WOODCREEK PHASE B5 PHASE 2 among its neighbors
44 discharge permits are in the Upper Spears Creek subwatershed (HUC 030501040401); SCR10ZBLG is one. Its county: 791, 6 major; SCR10ZBLG is minor permit.
Other permits in the Upper Spears Creek subwatershed (HUC 030501040401)
- 2699 FORT JACKSON RD TRACT, Elgin: SCR10ZL36, minor, term to 2031-05-28
- CAPITAL CONCRETE CO - BRAZELL PLANT, Elgin: SCR006636, minor, term to 2027-06-30
- CLEMSON ROAD HP GROWTH FEEDER (PHASE 1), Richland: SCR10ZBGU, minor, term to 2027-10-03
- DEER PARK TOWNHOMES DEVELOPMENT, Columbia: SCR10ZG99, minor, term to 2029-10-17
- ELGIN COMMUNITY CENTER, Elgin: SCR10ZE9A, minor, term to 2028-12-14
- ELGIN SELF STORAGE PHASE 1, Columbia: SCR10ZF2X, minor, term to 2029-04-18
- ELLINGTON SUBDIVISION - PHASE II, Elgin: SCR10ZAGW, minor, term to 2027-05-17
- ELLINGTON SUBDIVISION, PHASE 4, Elgin: SCR10ZGJQ, minor, term to 2029-12-01
- FIFTH-THIRD BANK - SPEARS CREEK, Eglin: SCR10ZJSB, minor, term to 2030-11-16
- FIREHOUSE SUBS SPEARS CREEK, Elgin: SCR10ZF7N, minor, term to 2029-05-08
Nearby on the register
- Discharge permits in Elgin
- Every permit record in Elgin, A to Z
- Discharge permits in South Carolina
- Every permit record in South Carolina, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
The WOODCREEK PHASE B5 PHASE 2 permit is one of 686 storm water construction permits in Richland County, this one included, and only 0.1% of those permits have a violation on file. It also sits within the Upper Spears Creek subwatershed, which holds 44 NPDES permits, this one included. The permit shows 0 pollutants under a numeric limit and 0 pollutants with an effluent exceedance.