NPDES SCR10ZDG9 · Clean Water Act
HIDDEN LAKE DRIVE PHASE 1, Chesnee, SC: NPDES SCR10ZDG9 discharge permit, effluent exceedances, inspections, penalties
HIDDEN LAKE DRIVE PHASE 1, Chesnee, South Carolina: General permit coverage SCR10ZDG9, held by Pau Cholak; Construction stormwater; Effective; issued August 10, 2023, term to August 9, 2028, by State.
South Carolina holds 11,300 Construction stormwater coverages of this permit type in EPA’s file; 4,325 were issued before SCR10ZDG9.
Coverages issued nearest SCR10ZDG9
- 2023-08-10: SESSION ROAD LOTS, Elgin: SCR10ZDG2, held by John Morton
- 2023-08-10: GUERRA TRACT-FLEETWOOD ROAD TRACT 4, N/A: SCR10ZDG3, held by Travis Boyd
- 2023-08-10: LAKE CREST LOT #85, 5711 GRIFFIN POINT, N/A: SCR10ZDG4, held by Brian Gala
- 2023-08-10: PLANT M - PHOENIX GREENWOOD INDUSTRIAL INVESTORS, Greenwood: SCR10ZDG6, held by Joseph Llaurado
- 2023-08-10: CLIFFS AT KEOWEE SPRINGS RACKET SPORTS AMENITY PLAN PHASE 1, N/A: SCR10ZDG8, held by Sam Duckett
- 2023-08-10: NORTHSIDE TOWNHOMES PHASE 2, Spartanburg: SCR10ZDGA, held by John Montgomery
- 2023-08-10: WINDSOR SECTION IV, N/A: SCR10ZDGB, held by Jason Whinghter
- 2023-08-10: THE GROVE AT BEES CREEK, Ridgeland: SCR10ZDGC, held by Lane Farar
- 2023-08-11: USCB RECREATION CENTER EXPANSION, Bluffton: SCR10ZDF1, held by Tony Malagrino
- 2023-08-11: KINGSTON OAKS AMENITY, Conway: SCR10ZDGD, held by David Ellis
HIDDEN LAKE DRIVE PHASE 1 among its neighbors
23 discharge permits are in the Upper Pacolet River subwatershed (HUC 030501051502); SCR10ZDG9 is one. Its county: 1,160, 8 major; SCR10ZDG9 is minor permit.
Other permits in the Upper Pacolet River subwatershed (HUC 030501051502)
- ALDRICH POINT, Chesnee: SCR10Z99V, minor, term to 2026-11-03
- BELUE ESTATES, Boiling Springs: SCR10ZJ3F, minor, term to 2030-08-04
- BISHOP'S AUTO PARTS, Chesnee: SCR006773, minor, term to 2027-06-30
- BURNETT PINES SUBDIVISION, Inman: SCR10ZL1V, minor, term to 2031-05-21
- CARLISE-FOSTER GROVE ELEMENTARY SCHOOL ADDITION, Chesnee: SCR10ZCNT, minor, term to 2028-04-03
- DOVE HOLLOW, Chesnee: SCR10ZERS, minor, term to 2029-03-03
- EASLER FARM, N/A: SCR10ZGF4, minor, term to 2029-11-12
- EASLER FARM, N/A: SCR10ZH8P, minor, term to 2030-03-25
- FOSTER GOVE SUBDIVISION, Chesnee: SCR10ZGZU, minor, term to 2030-02-20
- HIDDEN LAKE PHASE 2, Chesnee: SCR10ZG35, minor, term to 2029-09-29
What stands out
- Its term runs 4 years and 365 days, August 10, 2023 to August 9, 2028.
- No dated event in the 365 days to October 14, 2026.
- It is one of 13,763 discharge permits on the register in South Carolina; 11,300 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | HIDDEN LAKE DRIVE PHASE 1 |
|---|---|
| Permittee | Pau Cholak |
| NPDES ID | SCR10ZDG9 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 10, 2023 |
| Expires | August 9, 2028 |
| Agency | State |
| Address | Chesnee, SC 29323 |
| Subwatershed | Upper Pacolet River (HUC 030501051502) |
NPDES SCR10ZDG9: effluent limits and exceedances
HIDDEN LAKE DRIVE PHASE 1 (NPDES SCR10ZDG9): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SCR10ZDG9: no pollutant row on file.
NPDES SCR10ZDG9: inspections, violations and enforcement
NPDES SCR10ZDG9 (HIDDEN LAKE DRIVE PHASE 1): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SCR10ZDG9
NPDES SCR10ZDG9: one email when its EPA record changes — $99/month.
Permits near NPDES SCR10ZDG9
NPDES SCR10ZDG9: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.