CEDAR CREEK PHASE 4, N/A, SC: NPDES SCR10ZDZY discharge permit, effluent exceedances, inspections, penalties

CEDAR CREEK PHASE 4, N/A, South Carolina: General permit coverage SCR10ZDZY, held by Gary Finklea; Construction stormwater; Effective; issued October 31, 2023, term to October 30, 2028, by State.

  • July 17, 2026: Failure to comply with recordkeeping requirements - construction stormwater [40 CFR 122.41(j)] (ST6).
  • July 17, 2026: Failure to develop, maintain, or get approval of an adequate SWPPP (construction stormwater) (ST6).
  • July 17, 2026: Failure to properly operate or maintain construction stormwater controls (ST6).
  • July 17, 2026: Failure to properly install, initiate, or fully implement construction stormwater controls (ST6).
  • July 17, 2026: Failure to comply with construction stormwater requirement - numeric or narrative effluent violation (ST6).
  • July 17, 2026: Failure to properly conduct construction stormwater inspections (ST6).
  • July 17, 2026: Notice of Noncompliance Issued (State).
  • July 16, 2026: Evaluation (S).

South Carolina holds 11,300 Construction stormwater coverages of this permit type in EPA’s file; 4,808 were issued before SCR10ZDZY. Gary Finklea holds 6 permits in South Carolina.

Other permits held by Gary Finklea

Coverages issued nearest SCR10ZDZY

CEDAR CREEK PHASE 4 among its neighbors

23 discharge permits are in the Polk Swamp Canal subwatershed (HUC 030402010903); SCR10ZDZY is one. Its county: 270, 4 major; SCR10ZDZY is minor permit.

Other permits in the Polk Swamp Canal subwatershed (HUC 030402010903)

What stands out

  • Its term runs 4 years and 365 days, October 31, 2023 to October 30, 2028.
  • Its newest dated event on file is single-event violation and informal enforcement action on July 17, 2026, 60 days before EPA's file was loaded.
  • In the 365 days to September 15, 2026, it was dated 6 single-event violations, 1 inspection, 1 informal enforcement action.
  • EPA's file dates 8 events for it, all in 2026.
  • It is one of 13,763 discharge permits on the register in South Carolina; 11,300 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityCEDAR CREEK PHASE 4
PermitteeGary Finklea
NPDES IDSCR10ZDZY
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedOctober 31, 2023
ExpiresOctober 30, 2028
AgencyState
AddressN/A, SC 29506
SubwatershedPolk Swamp Canal (HUC 030402010903)

NPDES SCR10ZDZY: effluent limits and exceedances

CEDAR CREEK PHASE 4 (NPDES SCR10ZDZY): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES SCR10ZDZY: no pollutant row on file.

NPDES SCR10ZDZY: inspections, violations and enforcement

NPDES SCR10ZDZY: 6 single-event violations

DateWhat EPA recordedAgency
July 17, 2026Failure to comply with recordkeeping requirements - construction stormwater [40 CFR 122.41(j)]ST6
July 17, 2026Failure to develop, maintain, or get approval of an adequate SWPPP (construction stormwater)ST6
July 17, 2026Failure to properly operate or maintain construction stormwater controlsST6
July 17, 2026Failure to properly install, initiate, or fully implement construction stormwater controlsST6
July 17, 2026Failure to comply with construction stormwater requirement - numeric or narrative effluent violationST6
July 17, 2026Failure to properly conduct construction stormwater inspectionsST6

NPDES SCR10ZDZY: 1 inspection

DateWhat EPA recordedAgency
July 16, 2026EvaluationS

NPDES SCR10ZDZY: 1 informal enforcement action

DateWhat EPA recordedAgency
July 17, 2026Notice of Noncompliance IssuedState

NPDES SCR10ZDZY (CEDAR CREEK PHASE 4): no formal enforcement action on file.

Watch NPDES SCR10ZDZY

NPDES SCR10ZDZY: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES SCR10ZDZY

NPDES SCR10ZDZY: 0 pollutant rows, 8 dated events; ICIS-NPDES download, loaded September 15, 2026.