NPDES SCR10ZFCC · Clean Water Act
PECAN GROVE SUBDIVISION PHASE 1 WOODCREEK LOTS 6, 14, 20-22 & 31, Columbia, SC: NPDES SCR10ZFCC discharge permit, effluent exceedances, inspections, penalties
PECAN GROVE SUBDIVISION PHASE 1 WOODCREEK LOTS 6, 14, 20-22 & 31, Columbia, South Carolina: General permit coverage SCR10ZFCC, held by Sid Dudley; Construction stormwater; Effective; issued May 31, 2024, term to May 30, 2029, by State.
South Carolina holds 11,300 Construction stormwater coverages of this permit type in EPA’s file; 6,067 were issued before SCR10ZFCC. Sid Dudley holds 2 permits in South Carolina.
Other permits held by Sid Dudley
- CARRIAGE ESTATES, PHASE II, Lexington: SCR10ZEE7, issued 2024-01-12
Coverages issued nearest SCR10ZFCC
- 2024-05-31: OLD CHAPIN RESERVE, Lexington: SCR10ZFC6, held by Todd Carnes
- 2024-05-31: HEARTLAND ACRES LOTS # 12 & A3, 217 & 227 HEARTLAND DRIVE, Elgin: SCR10ZFC7, held by Stacy James
- 2024-05-31: MAVIS TIRE #2211, N/A: SCR10ZFC8, held by Andrew Suggs
- 2024-05-31: CEDAR STREET MIXED USE COMPLEX, Summerville: SCR10ZFC9, held by Jeffrey Roberts
- 2024-05-31: HANDSMILL AT LAKE WYLIE VDLS (13 LOTS) LOTS 82 & 83, N/A: SCR10ZFCB, held by Dave Kost
- 2024-05-31: GRAND OAKS LOTS 124, 125, 150-168, 172-178 & 219-240, Columbia: SCR10ZFCD, held by Grady Jordan
- 2024-05-31: LEATHERSTONE SUBDIVISION PHASE 1 LOTS 1-11, 56-98, & 105-140, N/A: SCR10ZFCE, held by Grady Jordan
- 2024-05-31: MAVIS TIRES, Aiken: SCR10ZFCF, held by James Micik
- 2024-05-31: EXPRESS OIL (PENDLETON), Pendleton: SCR10ZFCG, held by Justin Duck
- 2024-05-31: SHEPHERDS TRACE SUBDIVISION LOT 67, Clover: SCR10ZFCH, held by Stephen Sczcecina
PECAN GROVE SUBDIVISION PHASE 1 WOODCREEK LOTS 6, 14, 20-22 & 31 among its neighbors
25 discharge permits are in the Cedar Creek-Big Cedar Creek subwatershed (HUC 030501060601); SCR10ZFCC is one. Its county: 791, 6 major; SCR10ZFCC is minor permit.
Other permits in the Cedar Creek-Big Cedar Creek subwatershed (HUC 030501060601)
- BLYTHEWOOD ROAD WIDENING, Blythewood: SCR10ZFHU, minor, term to 2029-06-24
- BONEY ROAD RESIDENTIAL SUBDIVISION AKA BARRINGTON GROVE, Blythewood: SCR10ZJ0J, minor, term to 2030-07-31
- COBBLESTONE PARK SINGLE FAMILY LOTS, Blythewood: SCR10ZJ1X, minor, term to 2030-07-27
- CONCRETE BATCH PLANT AT WALTER B BROWN IP, Ridgeway: SCR006677, minor, term to 2027-06-30
- CONCRETE BATCH PLANT AT WALTER B BROWN IP, Ridgeway: SCR10ZFGW, minor, term to 2029-06-19
- FAIRFIELD COMMERCE CENTER PARCEL 8, Ridgeway: SCR10ZB4F, minor, term to 2027-08-22
- FAIRFIELD COMMERCE CENTER- PARCEL 9 - SPEC BUILDING, Ridgeway: SCR10ZEAR, minor, term to 2028-12-20
- ISOLA USA CORP,, Ridgeway: SCR006692, minor, term to 2027-06-30
- MEGA METALS PRODUCTION FACILITY AND ADDITION, Rudgeway: SCR10ZHYN, minor, term to 2030-07-10
- METRO DWELLINGS OFFICE, Blythewood: SCR10ZC65, minor, term to 2028-01-26
Identity
| Facility | PECAN GROVE SUBDIVISION PHASE 1 WOODCREEK LOTS 6, 14, 20-22 & 31 |
|---|---|
| Permittee | Sid Dudley |
| NPDES ID | SCR10ZFCC |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | May 31, 2024 |
| Expires | May 30, 2029 |
| Agency | State |
| Address | Columbia, SC 29045 |
| Subwatershed | Cedar Creek-Big Cedar Creek (HUC 030501060601) |
NPDES SCR10ZFCC: effluent limits and exceedances
PECAN GROVE SUBDIVISION PHASE 1 WOODCREEK LOTS 6, 14, 20-22 & 31 (NPDES SCR10ZFCC): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SCR10ZFCC: no pollutant row on file.
NPDES SCR10ZFCC: inspections, violations and enforcement
NPDES SCR10ZFCC (PECAN GROVE SUBDIVISION PHASE 1 WOODCREEK LOTS 6, 14, 20-22 & 31): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SCR10ZFCC
NPDES SCR10ZFCC: one email when its EPA record changes — $99/month.
Permits near NPDES SCR10ZFCC
NPDES SCR10ZFCC: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.