Clean Water Act discharge permit · NPDES SCR10ZH3D
ISLAND GREEN PHASE 2, Na, SC: NPDES SCR10ZH3D discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
ISLAND GREEN PHASE 2, held by Devon Lloyd, holds NPDES permit SCR10ZH3D. EPA’s file records it issued March 6, 2025 and expiring March 5, 2030. The status and dates are as EPA’s permit file stood when Velarion loaded it (October 14, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for ISLAND GREEN PHASE 2: its NPDES ID, its permit type and status, its dates, its address in Na, South Carolina. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES SCR10ZH3D.
What stands out
- Its term runs 4 years and 364 days, March 6, 2025 to March 5, 2030.
- No dated event in the 365 days to October 14, 2026.
- It is one of 13,763 discharge permits on the register in South Carolina; 11,300 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | ISLAND GREEN PHASE 2 |
|---|---|
| Permittee as filed | Devon Lloyd |
| NPDES ID | SCR10ZH3D |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | March 6, 2025 |
| Expiration date | March 5, 2030 |
| Issuing agency | State |
| Address | Na, SC 29588 |
| Subwatershed | Waccamaw River-Atlantic Intracoastal Waterway (HUC 030402061002) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES SCR10ZH3D.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES SCR10ZH3D.
Inspections
EPA’s inspection file holds no inspection for NPDES SCR10ZH3D.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES SCR10ZH3D.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, SCR10ZH3D.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID SCR10ZH3D there.
ISLAND GREEN PHASE 2, Na, South Carolina: Coverage under a general permit SCR10ZH3D, held by Devon Lloyd; Construction stormwater; Effective; issued March 6, 2025, term to March 5, 2030, by State.
South Carolina holds 11,300 Construction stormwater coverages of this permit type in EPA’s file; 7,786 were issued before SCR10ZH3D. Devon Lloyd holds 16 permits in South Carolina.
Other permits held by Devon Lloyd
- HARPER MEADOWS PHASES 1/2, Na: SCR10ZCE6, issued 2023-03-07
- SPRING VIEW LANDING, Na: SCR10ZCJD, issued 2023-03-17
- MEADOW WALK PHASES 1 & 2, Na: SCR10ZCL4, issued 2023-03-23
- COASTAL WIND TOWNHOMES, Myrtle Beach: SCR10ZCTY, issued 2023-04-25
- SUTTON FARMS PHASES 4-6, N/A: SCR10ZDCJ, issued 2023-07-25
- PRESERVE AT CYPRESS COMMONS PHASES 1/2, Conway: SCR10ZDPQ, issued 2023-09-14
- SHAFTESBURY GLEN PHASE 9, Conway: SCR10ZEP5, issued 2024-02-22
- SHAFTESBURY GLEN PHASE 12, Conway: SCR10ZEPC, issued 2024-02-21
- THE FOREST AT BLACK BEAR PHASE 2, Loris: SCR10ZFBP, issued 2024-05-29
- THE FOREST AT BLACK BEAR PHASE 5, Loris: SCR10ZFDL, issued 2024-06-06
Coverages issued nearest SCR10ZH3D
- 2025-03-06: GREENVILLE HUMANE SOCIETY NEW CAMPUS, Greenville: SCR10ZH36, held by Rachel Delport
- 2025-03-06: THE WOODLEY DEVELOPMENT, Columbia: SCR10ZH37, held by Thomas Fallows
- 2025-03-06: CHEROKEE FARMS PHASE II, Beaufort: SCR10ZH38, held by Patrick Kelly
- 2025-03-06: WENDY'S MARKETPLACE AT THE MILL #14346, Myrtle Beach: SCR10ZH3A, held by Stephen Budd
- 2025-03-06: HEALTHCARE PARTNERS OF SC- CONWAY MOB, Conway: SCR10ZH3C, held by Santina Mayo
- 2025-03-06: HANAHAN WTP: PLATE SETTLER BASIN AND SETTLED WATER CONVEYANCE PHASE 2 GMP 1, Hanahan: SCR10ZH3F, held by Donald Benjamin Jr.
- 2025-03-06: LANDMARK VILLAGE MINOR SUBDIVISION, Myrtle Beach: SCR10ZH3G, held by Hunter Brown
- 2025-03-07: EGRET LANDING - PHASE 1, Hardeeville: SCR10ZH2M, held by Jason Byham
- 2025-03-07: PARKER'S #130, Garden City: SCR10ZH3H, held by Daniel Ben-Yisrael
- 2025-03-07: SHORT CUT ROAD WAY TRACT, Town Of Harleyville: SCR10ZH3J, held by Davis McNair
ISLAND GREEN PHASE 2 among its neighbors
24 discharge permits are in the Waccamaw River-Atlantic Intracoastal Waterway subwatershed (HUC 030402061002); SCR10ZH3D is one. Its county: 1,304, 6 major; SCR10ZH3D is minor permit.
Other permits in the Waccamaw River-Atlantic Intracoastal Waterway subwatershed (HUC 030402061002)
- BUCKSPORT MAINTENANCE BUILDING, Conway: SCR10ZH7T, minor, term to 2030-03-23
- BUCKSPORT MARINA PARKING, Conway: SCR10ZB9C, minor, term to 2027-09-06
- BULL CREEK SWTP EXPANSION, Na: SCR10ZDZD, minor, term to 2028-10-26
- BULL CREEK SWTP SITE DRAINAGE IMPROVEMENTS, Na: SCR10Z9XR, minor, term to 2027-02-24
- CONWAY PARALLEL TRANSMISSION MAIN, Bucksport: SCR10ZKTX, minor, term to 2031-04-20
- GCW&SD MURRELLS INLET WWTF, Murrells Inlet: SC0040959, major, term to 2026-11-30
- GSW&SA SCHWARTZ MYRTLE BEACH & BUCKSPORT REG WWTPS, Bucksport: SC0037753, major, term to 2022-05-31
- GSW&SA/SCHWARTZ, MYRTLE BEACH, Conway: SCL037753, minor, term to 2025-12-31
- HERON POINTE, Na: SCR10ZAJB, minor, term to 2027-05-22
- ISLAND GREEN PHASE 2, Na: SCR10ZDYZ, minor, term to 2028-10-26
Nearby on the register
- Discharge permits in Na
- Every permit record in Na, A to Z
- Discharge permits in South Carolina
- Every permit record in South Carolina, A to Z
Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.
What this page shows
ISLAND GREEN PHASE 2 is one of 1,201 storm water construction permits on EPA's NPDES register in Horry County, and it sits among 24 NPDES permits in the Waccamaw River-Atlantic Intracoastal Waterway subwatershed, this one included. Of those 1,201 Horry County storm water construction permits, 0.7% have a violation on file, and 73.3% of them carry an earlier issue date than this permit's March 6, 2025 issuance. This permit has no pollutants under a numeric limit and no pollutants with an effluent exceedance.