NPDES SCR10ZH8H · Clean Water Act
PULTE MIDPOINT PHASE 2A & 3A, Bluffton, SC: NPDES SCR10ZH8H discharge permit, effluent exceedances, inspections, penalties
PULTE MIDPOINT PHASE 2A & 3A, Bluffton, South Carolina: General permit coverage SCR10ZH8H, held by Samuel Bellock; Construction stormwater; Effective; issued March 25, 2025, term to March 24, 2030, by State.
South Carolina holds 11,300 Construction stormwater coverages of this permit type in EPA’s file; 7,918 were issued before SCR10ZH8H. Samuel Bellock holds 8 permits in South Carolina.
Other permits held by Samuel Bellock
- PULTE MIDPOINT PHASE 4, Bluffton: SCR10ZH8G, issued 2025-04-07
- PULTE MIDPOINT AMENITY, Bluffton: SCR10ZHEU, issued 2025-04-16
- SUN CITY EAST ARGENT PHASE 11, Hardeeville: SCR10ZHFW, issued 2025-04-25
- SUN CITY EAST ARGENT PHASE 6, Hardeeville: SCR10ZHJ0, issued 2025-05-01
- PULTE MIDPOINT PHASE 3B, Bluffton: SCR10ZJN7, issued 2025-10-29
- SUN CITY EAST ARGENT - PHASE 12, Hardeeville: SCR10ZK56, issued 2026-01-15
- THE FARMS AT LONGLEAF EARLY SITE PACKAGE, Hollywood: SCR10ZLBM, issued 2026-07-07
Coverages issued nearest SCR10ZH8H
- 2025-03-25: DAYFIELD PARK STAGE 2, Summervillle: SCR10ZH86, held by E. Mitchell Norville
- 2025-03-25: LOWER GREAT FALLS ACCESS AREA, Great Falls: SCR10ZH87, held by Brian Couture
- 2025-03-25: HANANIA AUTO, Little River: SCR10ZH88, held by Jack Hanania
- 2025-03-25: CATAWBA NUCLEAR STATION - SETTLING POND STOCKPILE AREA, York: SCR10ZH89, held by Nicole Flippin
- 2025-03-25: THE HIVE- MASS GRADING PHASE 2, North Augusta: SCR10ZH8A, held by John Engler
- 2025-03-25: ESSENECA HILLS SUBDIVISION, N/A: SCR10ZH8J, held by Danny Holtzman, N/A
- 2025-03-25: TACO BELL HWY 707, Na: SCR10ZH8K, held by Matt Soddy
- 2025-03-25: NEXANS HIGH VOLTAGE USA INC. FUTURE EXPANSIONS, Goose Creek: SCR10ZH8L, held by Brian Boan
- 2025-03-25: YORK ROAD FIRE STATION, Cherokee: SCR10ZH8M, held by Preston Hampton
- 2025-03-26: IRBY GLEN, Spartanburg: SCR10ZH8B, held by Michael Roth
PULTE MIDPOINT PHASE 2A & 3A among its neighbors
40 discharge permits are in the Lower New River-Atlantic Intracoastal Waterway subwatershed (HUC 030601100202); SCR10ZH8H is one. Its county: 456, 3 major; SCR10ZH8H is minor permit.
Other permits in the Lower New River-Atlantic Intracoastal Waterway subwatershed (HUC 030601100202)
- ALSTON PARK - PHASE III, Bluffton: SCR10ZL0D, minor, term to 2031-05-17
- CITADEL PALMETTO BLUFF PHASE 2, Na: SCR10ZE2V, minor, term to 2028-11-14
- CITADEL PALMETTO BLUFF PHASE 3, Na: SCR10ZEX9, minor, term to 2029-03-25
- CVS PHARMACY #2745, Bluffton: SCR10ZHBB, minor, term to 2030-04-03
- ELDRED, Bluffton: SCR10ZJD5, minor, term to 2030-09-22
- EMBASSY SUITES HOTEL AND GARAGE, Savannah: GAR121271, minor, term to 2018-07-31
- ENTRANCE ROADWAY FOR THE SHERWOOD TRACT, Hardeeville: SCR10ZGP4, minor, term to 2029-12-19
- FIFTH THIRD BANK MAY RIVER, Bluffton: SCR10ZHP2, minor, term to 2030-05-21
- HERITAGE AT NEW RIVERSIDE PHASE 8 & 9, Bluffton: SCR10ZBHJ, minor, term to 2027-10-05
- LOWCOUNTRY PAVER STORAGE YARD, Hardeeville: SCR10ZKES, minor, term to 2031-02-23
What stands out
- Its term runs 4 years and 364 days, March 25, 2025 to March 24, 2030.
- No dated event in the 365 days to October 14, 2026.
- It is one of 13,763 discharge permits on the register in South Carolina; 11,300 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PULTE MIDPOINT PHASE 2A & 3A |
|---|---|
| Permittee | Samuel Bellock |
| NPDES ID | SCR10ZH8H |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 25, 2025 |
| Expires | March 24, 2030 |
| Agency | State |
| Address | Bluffton, SC 29910 |
| Subwatershed | Lower New River-Atlantic Intracoastal Waterway (HUC 030601100202) |
NPDES SCR10ZH8H: effluent limits and exceedances
PULTE MIDPOINT PHASE 2A & 3A (NPDES SCR10ZH8H): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SCR10ZH8H: no pollutant row on file.
NPDES SCR10ZH8H: inspections, violations and enforcement
NPDES SCR10ZH8H (PULTE MIDPOINT PHASE 2A & 3A): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SCR10ZH8H
NPDES SCR10ZH8H: one email when its EPA record changes — $99/month.
Permits near NPDES SCR10ZH8H
NPDES SCR10ZH8H: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.