Clean Water Act discharge permit · NPDES SCR10ZHE2
THE TOWNS AT CAMBRIC VILLAGE, Greer, SC: NPDES SCR10ZHE2 discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
THE TOWNS AT CAMBRIC VILLAGE, held by Mark MacFarland, holds NPDES permit SCR10ZHE2. EPA’s file records it issued April 15, 2025 and expiring April 14, 2030. The status and dates are as EPA’s permit file stood when Velarion loaded it (September 15, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for THE TOWNS AT CAMBRIC VILLAGE: its NPDES ID, its permit type and status, its dates, its address in Greer, South Carolina. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES SCR10ZHE2.
What stands out
- Its term runs 4 years and 364 days, April 15, 2025 to April 14, 2030.
- No dated event in the 365 days to September 15, 2026.
- It is one of 13,763 discharge permits on the register in South Carolina; 11,300 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | THE TOWNS AT CAMBRIC VILLAGE |
|---|---|
| Permittee as filed | Mark MacFarland |
| NPDES ID | SCR10ZHE2 |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | April 15, 2025 |
| Expiration date | April 14, 2030 |
| Issuing agency | State |
| Address | Greer, SC 29650 |
| Subwatershed | Brushy Creek-Enoree River (HUC 030501080102) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES SCR10ZHE2.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES SCR10ZHE2.
Inspections
EPA’s inspection file holds no inspection for NPDES SCR10ZHE2.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES SCR10ZHE2.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, SCR10ZHE2.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID SCR10ZHE2 there.
THE TOWNS AT CAMBRIC VILLAGE, Greer, South Carolina: Coverage under a general permit SCR10ZHE2, held by Mark MacFarland; Construction stormwater; Effective; issued April 15, 2025, term to April 14, 2030, by State.
South Carolina holds 11,300 Construction stormwater coverages of this permit type in EPA’s file; 8,087 were issued before SCR10ZHE2. Mark MacFarland holds 10 permits in South Carolina.
Other permits held by Mark MacFarland
- HILLSIDE DRIVE TRACT PHASE 2, North Myrtle Beach: SCR10ZFD4, issued 2024-06-04
- HILL STREET PARK VILLAS, Na: SCR10ZFW3, issued 2024-08-21
- THE ENCLAVE AT CAMBRIC VILLAGE, Greer: SCR10ZGDN, issued 2024-11-06
- RIVERTON POINTE MIMOSA AVENUE EXTENSION, Hardeeville: SCR10ZGT4, issued 2025-01-17
- WESTPOINT GARDENS PHASE 1 LOTS 1-6, 39-48, & 59-62, Piedmont: SCR10ZGU5, issued 2025-01-27
- TOWNES AT PRINCE CREEK, Murrells Inlet: SCR10ZGZH, issued 2025-02-19
- SOUTH ISLAND MARKET RESIDENTIAL PHASE 3, Johns Island: SCR10ZHST, issued 2025-09-12
- RIVERTON POINTE HAMPTON POINTE PHASE 7B, Hardeeville: SCR10ZJ3J, issued 2025-08-05
- TUXBURY FARM SUBDIVISION, Charleston: SCR10ZLF4, issued 2026-07-23
Coverages issued nearest SCR10ZHE2
- 2025-04-14: COLIGNY POCKET PARK, Hilton Head Island: SCR10ZHDX, held by Richard Loudin
- 2025-04-14: GOAT ISLAND SEWER SYSTEM IMPROVEMENTS, Summerton: SCR10ZHDY, held by Mary Adger
- 2025-04-14: COASTAL CENTRE SHOPPING CENTER REDEVELOPMENT, Conway: SCR10ZHDZ, held by Sam Berry
- 2025-04-15: SCRUBBY'S CARWASH PARK VILLAGE, North Myrtle Beach: SCR10ZHE0, held by Todd Walker
- 2025-04-15: PUMP STATION 20 FORCE MAIN REDIVERSION, St. George: SCR10ZHE1, held by Larry Harper
- 2025-04-15: LAFRANCE ROAD SITE PREPARATION, Pendleton: SCR10ZHE3, held by Heather Bennett
- 2025-04-15: BROAD VISTA TOWNS, Columbia: SCR10ZHE4, held by John Stephenson
- 2025-04-15: JPM CHASE - LEXINGTON, Lexington: SCR10ZHE5, held by Mauricio Delgado
- 2025-04-15: LAMB FARM SUBDIVISION, Duncan: SCR10ZHE6, held by Reid Fisher
- 2025-04-15: THE RITEDOSE CORPORATION WALKING TRAIL, Columbia: SCR10ZHE7, held by Allan Speicher
THE TOWNS AT CAMBRIC VILLAGE among its neighbors
129 discharge permits are in the Brushy Creek-Enoree River subwatershed (HUC 030501080102); SCR10ZHE2 is one. Its county: 1,127, 7 major; SCR10ZHE2 is minor permit.
Other permits in the Brushy Creek-Enoree River subwatershed (HUC 030501080102)
- 184 COMMERCE CENTER WAREHOUSE, Greenville: SCR10ZKA4, minor, term to 2031-02-09
- 2701 E PHILLIPS ROAD, Greer: SCR10ZFVJ, minor, term to 2029-08-18
- AALBERTS/USHERS MACHINE AND TOOL CO., INC., Greenville: SCRNE1050, minor, term to 2029-07-17
- ACCURATE BRAZING CORP DBA AALBERTS SURFACE TECHNOLOGIES, Greenville: SCRNE1034, minor, term to 2029-02-06
- ALDER CREEK, N/A: SCR10ZCBX, minor, term to 2028-02-22
- ALLEGIANT AIR, Greer: SCR006518, minor, term to 2027-06-30
- APEX POWDER COATING, Greer: SCR10ZBR1, minor, term to 2027-11-01
- ARAN EXPANSION, Greer: SCR10ZDJ9, minor, term to 2028-08-21
- ARAN USA INC., Greer: SCRNE1143, minor, term to 2030-11-19
- ARNOLD HIGH TECH, Greer: SCR10ZHKS, minor, term to 2030-05-07
Nearby on the register
- Discharge permits in Greer
- Every permit record in Greer, A to Z
- Discharge permits in South Carolina
- Every permit record in South Carolina, A to Z
Figures from EPA’s ICIS-NPDES download, loaded September 15, 2026.
What this page shows
The Towns at Cambric Village is one of 930 storm water construction permits on EPA's NPDES register in Greenville County, and it sits among 129 NPDES permits in the Brushy Creek-Enoree River subwatershed. Of those 930 Greenville County storm water construction permits, 0.9% have a violation on file, and 69.2% of them were issued earlier than this one. The permit, filed under Mark MacFarland and effective through April 14, 2030, records zero pollutants under a numeric limit and zero pollutants with an effluent exceedance.