Velarion Records
Free: one email when NPDES SCR10ZJAD changes. Unsubscribe any time.

NPDES SCR10ZJAD · Clean Water Act

ST PAUL ROAD PAVING PROJECT, Snelling, SC: NPDES SCR10ZJAD discharge permit, effluent exceedances, inspections, penalties

ST PAUL ROAD PAVING PROJECT, Snelling, South Carolina: General permit coverage SCR10ZJAD, held by Curtis Hogg; Construction stormwater; Effective; issued September 9, 2025, term to September 8, 2030, by State.

  • September 9, 2026: Evaluation (S).
  • August 31, 2026: Failure to comply with recordkeeping requirements - construction stormwater [40 CFR 122.41(j)] (ST6).
  • August 28, 2026: Failure to properly conduct construction stormwater inspections (ST6).
  • August 28, 2026: Failure to comply with recordkeeping requirements - construction stormwater [40 CFR 122.41(j)] (ST6).
  • August 28, 2026: Evaluation (S).
  • August 6, 2026: Failure to properly conduct construction stormwater inspections (ST6).
  • August 4, 2026: Failure to develop, maintain, or get approval of an adequate SWPPP (construction stormwater) (ST6).
  • August 4, 2026: Other noncompliance related to construction stormwater discharges (ST6).
  • August 4, 2026: Failure to properly operate or maintain construction stormwater controls (ST6).
  • August 4, 2026: Failure to properly conduct construction stormwater inspections (ST6).
  • August 4, 2026: Failure to comply with recordkeeping requirements - construction stormwater [40 CFR 122.41(j)] (ST6).
  • August 4, 2026: Evaluation (S).
  • July 28, 2026: Notice of Noncompliance Issued (State).
  • July 24, 2026: Failure to develop, maintain, or get approval of an adequate SWPPP (construction stormwater) (ST6).
  • July 24, 2026: Failure to properly conduct construction stormwater inspections (ST6).
  • July 24, 2026: Failure to comply with recordkeeping requirements - construction stormwater [40 CFR 122.41(j)] (ST6).
  • July 24, 2026: Other noncompliance related to construction stormwater discharges (ST6).
  • July 24, 2026: Failure to properly operate or maintain construction stormwater controls (ST6).
  • July 24, 2026: Evaluation (S).

South Carolina holds 11,300 Construction stormwater coverages of this permit type in EPA’s file; 8,909 were issued before SCR10ZJAD. Curtis Hogg holds 2 permits in South Carolina.

Other permits held by Curtis Hogg

Coverages issued nearest SCR10ZJAD

ST PAUL ROAD PAVING PROJECT among its neighbors

70 discharge permits are in the Mackay River-Frontal Atlantic Ocean subwatershed (HUC 030702030203); SCR10ZJAD is one. Its county: 32, 0 major; SCR10ZJAD is minor permit.

Other permits in the Mackay River-Frontal Atlantic Ocean subwatershed (HUC 030702030203)

What stands out

  • Its term runs 4 years and 364 days, September 9, 2025 to September 8, 2030.
  • Its newest dated event on file is an inspection on September 9, 2026, 6 days before EPA's file was loaded.
  • In the 365 days to September 15, 2026, it was dated 14 single-event violations, 4 inspections, 1 informal enforcement action.
  • EPA's file dates 19 events for it, all in 2026.
  • It is one of 13,763 discharge permits on the register in South Carolina; 11,300 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilityST PAUL ROAD PAVING PROJECT
PermitteeCurtis Hogg
NPDES IDSCR10ZJAD
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedSeptember 9, 2025
ExpiresSeptember 8, 2030
AgencyState
AddressSnelling, SC 29812
SubwatershedMackay River-Frontal Atlantic Ocean (HUC 030702030203)

NPDES SCR10ZJAD: effluent limits and exceedances

ST PAUL ROAD PAVING PROJECT (NPDES SCR10ZJAD): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES SCR10ZJAD: no pollutant row on file.

NPDES SCR10ZJAD: inspections, violations and enforcement

NPDES SCR10ZJAD: 14 single-event violations

DateWhat EPA recordedAgency
August 31, 2026Failure to comply with recordkeeping requirements - construction stormwater [40 CFR 122.41(j)]ST6
August 28, 2026Failure to properly conduct construction stormwater inspectionsST6
August 28, 2026Failure to comply with recordkeeping requirements - construction stormwater [40 CFR 122.41(j)]ST6
August 6, 2026Failure to properly conduct construction stormwater inspectionsST6
August 4, 2026Failure to develop, maintain, or get approval of an adequate SWPPP (construction stormwater)ST6
August 4, 2026Other noncompliance related to construction stormwater dischargesST6
August 4, 2026Failure to properly operate or maintain construction stormwater controlsST6
August 4, 2026Failure to properly conduct construction stormwater inspectionsST6
August 4, 2026Failure to comply with recordkeeping requirements - construction stormwater [40 CFR 122.41(j)]ST6
July 24, 2026Failure to develop, maintain, or get approval of an adequate SWPPP (construction stormwater)ST6
July 24, 2026Failure to properly conduct construction stormwater inspectionsST6
July 24, 2026Failure to comply with recordkeeping requirements - construction stormwater [40 CFR 122.41(j)]ST6
July 24, 2026Other noncompliance related to construction stormwater dischargesST6
July 24, 2026Failure to properly operate or maintain construction stormwater controlsST6

NPDES SCR10ZJAD: 4 inspections

DateWhat EPA recordedAgency
September 9, 2026EvaluationS
August 28, 2026EvaluationS
August 4, 2026EvaluationS
July 24, 2026EvaluationS

NPDES SCR10ZJAD: 1 informal enforcement action

DateWhat EPA recordedAgency
July 28, 2026Notice of Noncompliance IssuedState

NPDES SCR10ZJAD (ST PAUL ROAD PAVING PROJECT): no formal enforcement action on file.

Watch NPDES SCR10ZJAD

NPDES SCR10ZJAD: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES SCR10ZJAD

NPDES SCR10ZJAD: 0 pollutant rows, 19 dated events; ICIS-NPDES download, loaded September 15, 2026.