NPDES SCR10ZLAX · Clean Water Act
REDWOOD- LIVE CELL STORAGE, Ridgeville, SC: NPDES SCR10ZLAX discharge permit, effluent exceedances, inspections, penalties
REDWOOD- LIVE CELL STORAGE, Ridgeville, South Carolina: General permit coverage SCR10ZLAX, held by Jessica Garrison; Construction stormwater; Effective; issued July 6, 2026, term to July 5, 2031, by State.
South Carolina holds 11,300 Construction stormwater coverages of this permit type in EPA’s file; 10,884 were issued before SCR10ZLAX.
Coverages issued nearest SCR10ZLAX
- 2026-07-03: KARIS COLD STORAGE, Rock Hill: SCR10ZLB0, held by Ken Verne
- 2026-07-03: HIGHWAY 274 - LAKE WYLIE MOBILE HOME WATERLINE EXTENSION, Clover: SCR10ZLB1, held by Chris Barry
- 2026-07-03: PINEY BLUFF, Greenville: SCR10ZLB2, held by Joe Smith
- 2026-07-03: 1047 COUNTS FERRY RD, Lexington: SCR10ZLB3, held by Patrick Hanko
- 2026-07-03: KING ASPHALT LIBERTY, Liberty: SCR10ZLB4, held by COREY SPAIN
- 2026-07-06: 949 EAST ESTATES, Charleston: SCR10ZLB5, held by Eric Frost
- 2026-07-06: PAVING OF BRIARCLIFF DRIVE, Cheraw: SCR10ZLB6, held by Michelle Stanley
- 2026-07-06: PAVING OF COTTONWOOD LANE & COTTON PATCH LANE, Pageland: SCR10ZLB8, held by Michelle Stanley
- 2026-07-06: TOWNS AT HAVEN VIEW, Murrells Inleet: SCR10ZLB9, held by Joe Walter
- 2026-07-06: EQUIPMENT & MATERIAL STORAGE - 3115 BLUFF RD, Columbia: SCR10ZLBA, held by Robert Hammersla
REDWOOD- LIVE CELL STORAGE among its neighbors
41 discharge permits are in the Timothy Creek subwatershed (HUC 030502050310); SCR10ZLAX is one. Its county: 914, 9 major; SCR10ZLAX is minor permit.
Other permits in the Timothy Creek subwatershed (HUC 030502050310)
- AUTONOMOUS DRIVE 115-12KV SUBSTATION, Na: SCR10ZCAN, minor, term to 2028-02-16
- AUTONOMOUS DRIVE UNDERGROUND ELECTRIC, Ridgeville: SCR10ZC5N, minor, term to 2028-02-01
- BEC MILL BRANCH SUBSTATION, Na: SCR10ZBV8, minor, term to 2027-11-16
- BERKELEY BAY, Ridgeville: SCR10ZDDJ, minor, term to 2028-07-27
- CAMP HALL AVIAN COMMONS BUILDING SITE PHASE 1, Ridgeville: SCR10ZJBS, minor, term to 2030-09-16
- CAMP HALL BOULEVARD PHASE 2, Na: SCR10ZE2T, minor, term to 2028-11-13
- CAMP HALL CAMPUS 1 PARCEL 4, Na: SCR10ZAUT, minor, term to 2027-07-06
- CAMP HALL CAMPUS 1 PARCEL 6 & 7, Na: SCR10ZDVG, minor, term to 2028-10-09
- CAMP HALL CAMPUS 4 EARLY SITE PACKAGE, Na: SCR10ZA04, minor, term to 2027-03-07
- CAMP HALL CAMPUS 4A, Na: SCR10Z91M, minor, term to 2026-09-29
What stands out
- Its term runs 4 years and 364 days, July 6, 2026 to July 5, 2031.
- No dated event in the 365 days to September 15, 2026.
- It is one of 13,763 discharge permits on the register in South Carolina; 11,300 of them (82%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | REDWOOD- LIVE CELL STORAGE |
|---|---|
| Permittee | Jessica Garrison |
| NPDES ID | SCR10ZLAX |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 6, 2026 |
| Expires | July 5, 2031 |
| Agency | State |
| Address | Ridgeville, SC 29472 |
| Subwatershed | Timothy Creek (HUC 030502050310) |
NPDES SCR10ZLAX: effluent limits and exceedances
REDWOOD- LIVE CELL STORAGE (NPDES SCR10ZLAX): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SCR10ZLAX: no pollutant row on file.
NPDES SCR10ZLAX: inspections, violations and enforcement
NPDES SCR10ZLAX (REDWOOD- LIVE CELL STORAGE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SCR10ZLAX
NPDES SCR10ZLAX: one email when its EPA record changes — $99/month.
Permits near NPDES SCR10ZLAX
NPDES SCR10ZLAX: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.