Velarion Records
Free: one email when NPDES SDR10I02S changes. Unsubscribe any time.

NPDES SDR10I02S · Clean Water Act

OLD HOLLOW WOOD BRIDGE REPLACEMENT, Rosebud, SD: NPDES SDR10I02S discharge permit, effluent exceedances, inspections, penalties

OLD HOLLOW WOOD BRIDGE REPLACEMENT, Rosebud, South Dakota: General permit coverage SDR10I02S, held by Rosebud Concrete Inc; Construction stormwater; Not needed.

South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file. Rosebud Concrete Inc holds 2 permits in South Dakota.

Other permits held by Rosebud Concrete Inc

OLD HOLLOW WOOD BRIDGE REPLACEMENT among its neighbors

4 discharge permits are in the Rosebud Creek subwatershed (HUC 101402030405); SDR10I02S is one.

Other permits in the Rosebud Creek subwatershed (HUC 101402030405)

What stands out

  • No dated event in the 365 days to September 15, 2026.
  • It is one of 2,151 discharge permits on the register in South Dakota; 1,370 of them (64%) are in its program, Construction stormwater.

Identity

FacilityOLD HOLLOW WOOD BRIDGE REPLACEMENT
PermitteeRosebud Concrete Inc
NPDES IDSDR10I02S
StatusNot needed
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
AddressRosebud, SD 57570
SubwatershedRosebud Creek (HUC 101402030405)

NPDES SDR10I02S: effluent limits and exceedances

OLD HOLLOW WOOD BRIDGE REPLACEMENT (NPDES SDR10I02S): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES SDR10I02S: no pollutant row on file.

NPDES SDR10I02S: inspections, violations and enforcement

NPDES SDR10I02S (OLD HOLLOW WOOD BRIDGE REPLACEMENT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES SDR10I02S

NPDES SDR10I02S: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES SDR10I02S

NPDES SDR10I02S: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.