NPDES SDR10K413 · Clean Water Act
KAKS LAKESIDE SECOND ADDITION, Watertown, SD: NPDES SDR10K413 discharge permit, effluent exceedances, inspections, penalties
KAKS LAKESIDE SECOND ADDITION, Watertown, South Dakota: General permit coverage SDR10K413, held by Kaks Lakeside Second Addition; Construction stormwater; Administratively continued; issued December 21, 2020, term to March 31, 2023, by State; discharges to natural drainage to Lake Pelican; Industrial Building Construction.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 166 were issued before SDR10K413. Kaks Lakeside Second Addition holds 2 permits in South Dakota.
Other permits held by Kaks Lakeside Second Addition
- KAKS LAKESIDE SECOND ADDITION, Watertown: SDR10K491, issued 2021-10-07
Coverages issued nearest SDR10K413
- 2020-11-30: HANSONS POND, Piedmont: SDR10P077, held by Chad Hanson
- 2020-12-03: BYRE APARTMENTS, Sioux Falls: SDR10K078, held by Byre Apartments
- 2020-12-09: NORTHERN LIGHTS KENAI DR, Box Elder: SDR10K100, held by Northern Lights Kenai Dr
- 2020-12-09: FREEDOM LANDING PHASE 4, Box Elder: SDR10K101, held by Freedom Landing Phase 4
- 2020-12-18: MARSHALL COUNTY HEALTHCARE CENTER, Britton: SDR10K113, held by Marshall County Healthcare Center
- 2021-01-06: LEE PARK POND MAINTENANCE, Aberdeen: SDR10K119, held by Lee Park Pond Maintenance
- 2021-01-07: CLAREMONT WASTEWATER SYSTEM IMPROVEMENTS, Claremont: SDR10K524, held by Claremont Wastewater System Improvements
- 2021-01-11: CROCKERS COLLISION CENTER, Watertown: SDR10K525, held by Crockers Collision Center
- 2021-01-19: ELKHORN RIDGE PHASE 6, Spearfish: SDR10K298, held by Elkhorn Ridge Phase 4
- 2021-02-03: 2415 COMMERCE RD, Rapid City: SDR10K129, held by 2415 Commerce Rd
KAKS LAKESIDE SECOND ADDITION among its neighbors
6 discharge permits are in the Pelican Lake subwatershed (HUC 101702010902); SDR10K413 is one.
Other permits in the Pelican Lake subwatershed (HUC 101702010902)
- EASTSIDE INVESTMENTS DETENTION POND, Watertown: SDR10P232, minor, term to 2023-03-31
- KAKS LAKESIDE SECOND ADDITION, Watertown: SDR10K491, minor, term to 2023-03-31
- PCN 06K5, Watertown: SDR10P311
- PRAIRIE HAVEN 1ST ADDITION, Watertown: SDR10K678, minor, term to 2023-03-31
- TRUCKING FREIGHT COMPANY, Watertown: SDR10P268, minor, term to 2023-03-31
What stands out
- Its term runs 2 years and 100 days, December 21, 2020 to March 31, 2023; the term ended 1,293 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 2,151 discharge permits on the register in South Dakota; 1,370 of them (64%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | KAKS LAKESIDE SECOND ADDITION |
|---|---|
| Permittee | Kaks Lakeside Second Addition |
| NPDES ID | SDR10K413 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | December 21, 2020 |
| Expires | March 31, 2023 |
| Agency | State |
| Address | Watertown, SD 57201 |
| Receiving water | natural drainage to Lake Pelican |
| Subwatershed | Pelican Lake (HUC 101702010902) |
| NAICS | 236210 – Industrial Building Construction |
| SIC | 1629 – Heavy Construction |
NPDES SDR10K413: effluent limits and exceedances
KAKS LAKESIDE SECOND ADDITION (NPDES SDR10K413): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10K413: no pollutant row on file.
NPDES SDR10K413: inspections, violations and enforcement
NPDES SDR10K413 (KAKS LAKESIDE SECOND ADDITION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10K413
NPDES SDR10K413: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10K413
NPDES SDR10K413: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.