NPDES SDR10P162 · Clean Water Act
PCN 04V9, Pickstown, SD: NPDES SDR10P162 discharge permit, effluent exceedances, inspections, penalties
PCN 04V9, Pickstown, South Dakota: General permit coverage SDR10P162, held by NH 0018(203)333; Construction stormwater; Administratively continued; issued November 17, 2021, term to March 31, 2023, by State; discharges to Missouri River; Industrial Building Construction.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 282 were issued before SDR10P162.
Coverages issued nearest SDR10P162
- 2021-11-04: LOT 1 JN JENSEN SUBDIVISION, Dell Rapids: SDR10K586, held by Lot 1 JN Jensen Subdivision
- 2021-11-12: NH 0018(203)333, CHARLES MIX, PCN 04V9, Pickstown: SDR10I01T, held by SD Department of Transportation
- 2021-11-12: GRASSY KNOLL AND COTTONWOOD GROVE FARMS, White River: SDR10I01U, held by Cottonwood Knoll, LLC
- 2021-11-12: SIOUX EMPIRE DEVELOPMENT PARK 8 PHASE 3, Sioux Falls: SDR10K501, held by Sioux Empire Development Park 8 Phase 3
- 2021-11-15: NINEMILE LAKE ADDITION, Tea: SDR10K448, held by Ninemile Lake Addition
- 2021-11-18: ENCORE PARK - PHASE 1, Brandon: SDR10K505, held by Encore Park - Phase 1
- 2021-11-19: SUMMERSET HEIGHTS APARTMENTS, Summerset: SDR10K613, held by Summerset Heights Apartments
- 2021-11-22: NH-PS 0012(187)106, CORSON, PCN 04FL, Mcintosh: NDR10I030, held by SD Department of Transportation
- 2021-11-22: PCN 020V, Brookings: SDR10P166, held by EM 0295(45)130
- 2021-11-22: PCN 07ME, Newell: SDR10P168, held by BR CSBP(01)
PCN 04V9 among its neighbors
3 discharge permits are in the White Swan Creek-Missouri River subwatershed (HUC 101401011806); SDR10P162 is one.
Other permits in the White Swan Creek-Missouri River subwatershed (HUC 101401011806)
- MARK NELSON BORROW SITE, Lake Andes: SDR10P5MV, minor, term to 2028-10-31
- NH 0018(203)333, CHARLES MIX, PCN 04V9, Pickstown: SDR10I01T, minor, term to 2022-02-15
Identity
| Facility | PCN 04V9 |
|---|---|
| Permittee | NH 0018(203)333 |
| NPDES ID | SDR10P162 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 17, 2021 |
| Expires | March 31, 2023 |
| Agency | State |
| Address | Pickstown, SD 57367 |
| Receiving water | Missouri River |
| Subwatershed | White Swan Creek-Missouri River (HUC 101401011806) |
| NAICS | 236210 – Industrial Building Construction |
| SIC | 1629 – Heavy Construction |
NPDES SDR10P162: effluent limits and exceedances
PCN 04V9 (NPDES SDR10P162): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10P162: no pollutant row on file.
NPDES SDR10P162: inspections, violations and enforcement
NPDES SDR10P162 (PCN 04V9): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10P162
NPDES SDR10P162: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10P162
NPDES SDR10P162: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.