NPDES SDR10P255 · Clean Water Act
DIAMOND MOWERS - BUILDING EXPANSION, Sioux Falls, SD: NPDES SDR10P255 discharge permit, effluent exceedances, inspections, penalties
DIAMOND MOWERS - BUILDING EXPANSION, Sioux Falls, South Dakota: General permit coverage SDR10P255, held by Doyle Family Land Company LLC; Construction stormwater; Administratively continued; issued November 17, 2022, term to March 31, 2023, by State.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 449 were issued before SDR10P255.
Coverages issued nearest SDR10P255
- 2022-11-14: PCN 06R3, Scenic: SDR10P261, held by P 0044(217)88 / 044-391
- 2022-11-14: PCN 04XC, De Smet: SDR10P279, held by P-PH-B 0025(85)115 / P 0028(44)316
- 2022-11-14: PCN 084T, Amour: SDR10P280, held by BRF-B 6516(05)
- 2022-11-14: PCN 06K4, Freeman: SDR10P281, held by PH 0020(199)
- 2022-11-14: PCN 05F9, Dell Rapids: SDR10P283, held by IM-PH 0293(107)99 / PH 000S(396)
- 2022-11-21: TRUCKING FREIGHT COMPANY, Watertown: SDR10P268, held by SAIA Motor Freight Line LLC
- 2022-11-22: MEAD PROPERTY DEVELOPMENT, Yankton: SDR10P265, held by City of Yankton
- 2022-11-29: PCN 04XK, Sioux Falls: SDR10P297, held by IM 2292(98)9 / P 1200(04) / IM 2292(112)6
- 2022-12-02: JOHNSON BROTHERS BUILDING ADDITION, Sioux Falls: SDR10P257, held by Johnson Brothers of South Dakota Inc
- 2022-12-09: PROVALLONE STORAGE, Rapid City: SDR10P262, held by Provallone LLC
DIAMOND MOWERS - BUILDING EXPANSION among its neighbors
101 discharge permits are in the Falls of the Big Sioux River subwatershed (HUC 101702031203); SDR10P255 is one. Its county: 56, 2 major; SDR10P255 is minor permit.
Other permits in the Falls of the Big Sioux River subwatershed (HUC 101702031203)
- 20TH STREET RECONSTRUCTION, Sioux Falls: SDR10P5TH, minor, term to 2028-10-31
- 3500 S. CLIFF AVE GRADINGE, Sioux Falls: SDR10P5TF, minor, term to 2028-10-31
- 3604 W. HOVLAND DRIVE, Sioux Falls: SDR10P5V9, minor, term to 2028-10-31
- 3D SECURITY BUILDING, Sioux Falls: SDR10K154, minor, term to 2023-03-31
- 43 POINT CAPITAL, Sioux Falls: SDR10K885
- 85TH STREET REGIONAL POND - EAST, Sioux Falls: SDR10P5RS, minor, term to 2028-10-31
- 85TH STREET STRIP MALL, Sioux Falls: SDR10K059, minor, term to 2023-03-31
- ABANDONED CITY TRAINING CENTER DEMOLITION, Sioux Falls: SDR10P5RR, minor, term to 2028-10-31
- ARCHES AT UPTOWN LLC, Sioux Falls: SD0028541
- AUGUSTANA ICE HOCKEY ARENA, Sioux Falls: SDR10K551, minor, term to 2023-03-31
Identity
| Facility | DIAMOND MOWERS - BUILDING EXPANSION |
|---|---|
| Permittee | Doyle Family Land Company LLC |
| NPDES ID | SDR10P255 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 17, 2022 |
| Expires | March 31, 2023 |
| Agency | State |
| Address | Sioux Falls, SD 57104 |
| Subwatershed | Falls of the Big Sioux River (HUC 101702031203) |
| Other EPA IDs (FRS) | RCRA handler SDD147147300 |
NPDES SDR10P255: effluent limits and exceedances
DIAMOND MOWERS - BUILDING EXPANSION (NPDES SDR10P255): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10P255: no pollutant row on file.
NPDES SDR10P255: inspections, violations and enforcement
NPDES SDR10P255 (DIAMOND MOWERS - BUILDING EXPANSION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10P255
NPDES SDR10P255: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10P255
NPDES SDR10P255: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.