NPDES SDR10P302 · Clean Water Act
PCN 05ET, Yankton, SD: NPDES SDR10P302 discharge permit, effluent exceedances, inspections, penalties
PCN 05ET, Yankton, South Dakota: General permit coverage SDR10P302, held by P-PH 0052(08)332; Construction stormwater; Administratively continued; issued March 7, 2023, term to March 31, 2023, by State; discharges to Missouri River.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 464 were issued before SDR10P302.
Coverages issued nearest SDR10P302
- 2023-02-08: TEC EQUIPMENT - SIOUX FALLS SALES & SERVICE FACILI, Sioux Falls: SDR10P285, held by TEC Equipment - Sioux Falls Sales & Service Facility
- 2023-02-22: B-21: WASHRACK & MAINTENANCE HANGAR, Ellsworth Afb: SDR10P293, held by B-21: Washrack & Maintenance Hangar
- 2023-02-22: PCN 06N7, Crooks: SDR10P301, held by P TAPU(22)
- 2023-02-27: WRF AERATION BASIN, Rapid City: SDR10P289, held by WRF Aeration Basin
- 2023-03-01: IPSWICH CHANNEL CLEANING, Ipswich: SDR10P290, held by Ipswich Channel Cleaning
- 2023-03-07: PCN 06DL, Vermillion: SDR10P303, held by IM 0291(132)27
- 2023-03-07: PCN 06CF, Sioux Falls: SDR10P304, held by IM 2292{103)2 & IM 2292(109)2
- 2023-03-07: PCN 08LD, Summerset: SDR10P305, held by IM 0901(203)45
- 2023-03-14: B-21: ADAL FLIGHT SIMULATOR FACILITY, Ellsworth Afb: SDR10P294, held by B-21: ADAL Flight Simulator Facility
- 2023-03-16: PCN 06JF, Mitchell: SDR10P307, held by PH 0020(201)
PCN 05ET among its neighbors
10 discharge permits are in the Lake Yankton-Missouri River subwatershed (HUC 101701011204); SDR10P302 is one.
Other permits in the Lake Yankton-Missouri River subwatershed (HUC 101701011204)
- CRESTVIEW ESTATES HOUSING DEVELOPMENT, Yankton: SDR10B577, minor, term to 2023-03-31
- LEWIS & CLARK RV PARK, Yankton: SDR10K052, minor, term to 2023-03-31
- SACRED HEART MONASTERY, Yankton: SDR10P5MW, minor, term to 2028-10-31
- SD WATER PURIFICATION FACILITY EXPANSION, Yankton: SDR10H967, minor, term to 2023-03-31
- USACE GAVINS POINT DAM PROJECT, Crofton: SDGA20002, minor, term to 2025-09-30
- USFWS - GAVINS POINT NATIONAL FISH HATCHERY, Yankton: SD0026310, minor, term to 2017-03-31
- WESTSIDE PARK - POND IMPROVEMENTS, Yankton: SDR10K712, minor, term to 2023-03-31
- YANKTON, CITY OF, Yankton: SD0023396, major, term to 2020-09-30
- YANKTON, CITY OF WATER PURIFICATION FACILITY, Yankton: SD0028628, minor, term to 2024-09-30
Identity
| Facility | PCN 05ET |
|---|---|
| Permittee | P-PH 0052(08)332 |
| NPDES ID | SDR10P302 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 7, 2023 |
| Expires | March 31, 2023 |
| Agency | State |
| Address | Yankton, SD 57078 |
| Receiving water | Missouri River |
| Subwatershed | Lake Yankton-Missouri River (HUC 101701011204) |
| SIC | 1611 – Highway And Street Construction |
NPDES SDR10P302: effluent limits and exceedances
PCN 05ET (NPDES SDR10P302): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10P302: no pollutant row on file.
NPDES SDR10P302: inspections, violations and enforcement
NPDES SDR10P302 (PCN 05ET): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10P302
NPDES SDR10P302: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10P302
NPDES SDR10P302: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.