NPDES SDR10P508 · Clean Water Act
PCN 086C & 086D, Redfield, SD: NPDES SDR10P508 discharge permit, effluent exceedances, inspections, penalties
PCN 086C & 086D, Redfield, South Dakota: General permit coverage SDR10P508, held by SD Department of Transportation; Construction stormwater; Effective; issued November 30, 2023, term to October 31, 2028, by SDDANR.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 496 were issued before SDR10P508. SD Department of Transportation holds 182 permits in South Dakota.
Other permits held by SD Department of Transportation
- NH-PS 0012(187)106, CORSON, PCN 04FL, Mcintosh: NDR10I030, issued 2021-11-22
- PCN 05TY - EPA, Mclaughlin: NDR10I05U, issued 2025-01-03
- P 1806(12)149, PCN 038Z, STANLEY COUNTY, Ft. Pierre: SDR10I01F, issued 2020-08-24
- ER 6385(07), MELLETTE COUNTY, PCN 07N2, White River: SDR10I01R, issued 2021-08-12
- P 1806(15)176, STANLEY COUNTY, PCN 045K, Ft. Pierre: SDR10I01S, issued 2021-09-27
- NH 0018(203)333, CHARLES MIX, PCN 04V9, Pickstown: SDR10I01T, issued 2021-11-12
- NH 0212(182)187; DEWEY & POTTER, PCN 05EN, La Plant: SDR10I01V, issued 2021-11-29
- PCN 05HV - EPA, Kadoka: SDR10I03F, issued 2024-10-15
- PCN 04FC - EPA, Pine Ridge: SDR10I03N, issued 2025-01-03
- PCN 06CM - EPA, Eagle Butte: SDR10I03P, issued 2025-02-13
Coverages issued nearest SDR10P508
- 2023-11-14: IRENE WATER STORAGE IMPROVEMENTS, Irene: SDR10P506, held by DGR Engineering
- 2023-11-16: 2019 STORM REPAIRS 24, Manderson: SDR10I02T, held by Oglala Sioux Tribe Department of Transportation
- 2023-11-16: 2019 STORM REPAIRS 27-1, Sharps Corner: SDR10I02U, held by Oglala Sioux Tribe Department of Transportation
- 2023-11-16: BIA ROUTE 90 STRUCTURE REPLACEMENT BRIDGE A155, Pine Ridge: SDR10I02V, held by Oglala Sioux Tribe Department of Transportation
- 2023-11-16: BIA ROUTE 49 - BRIDGE #A133 REPLACEMENT PROJECT, Wounded Knee: SDR10I02W, held by Oglala Sioux Tribe Department of Transportation
- 2023-12-01: LAKE MADISON CHANNEL GRADING, Madison: SDR10P50P, held by Lake Point Properties LLC
- 2023-12-04: BRANCH CREEK ADDITION, Brookings: SDR10P50R, held by Bowes Construction
- 2023-12-07: SOLID CONSTRUCTION, Box Elder: SDR10P50U, held by JMC Inc
- 2023-12-07: PROJECT NO 22-2694/CIP51220 143RD AVE & COUNTY RD TRUNK SEWER EXTENSION, Rapid City: SDR10P50W, held by City of Rapid City
- 2023-12-08: ANGOSTURA RESORT, Hot Springs: SDR10P50Y, held by Kaski Inc.
PCN 086C & 086D among its neighbors
1 discharge permits are in the Bald Mountain-Medicine Creek subwatershed (HUC 101600090608); SDR10P508 is one.
What stands out
- Its term runs 4 years and 336 days, November 30, 2023 to October 31, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 2,151 discharge permits on the register in South Dakota; 1,370 of them (64%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PCN 086C & 086D |
|---|---|
| Permittee | SD Department of Transportation |
| NPDES ID | SDR10P508 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 30, 2023 |
| Expires | October 31, 2028 |
| Agency | SDDANR |
| Address | Redfield, SD 57469 |
| Subwatershed | Bald Mountain-Medicine Creek (HUC 101600090608) |
NPDES SDR10P508: effluent limits and exceedances
PCN 086C & 086D (NPDES SDR10P508): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10P508: no pollutant row on file.
NPDES SDR10P508: inspections, violations and enforcement
NPDES SDR10P508 (PCN 086C & 086D): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10P508
NPDES SDR10P508: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10P508
NPDES SDR10P508: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.