SHEPHERD HILLS SUBD. PHASE 4, Rapid City, SD: NPDES SDR10P57X discharge permit, effluent exceedances, inspections, penalties
SHEPHERD HILLS SUBD. PHASE 4, Rapid City, South Dakota: General permit coverage SDR10P57X, held by Dream Construction, Inc.; Construction stormwater; Effective; issued June 18, 2024, term to October 31, 2028, by SDDANR.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 592 were issued before SDR10P57X. Dream Construction, Inc. holds 5 permits in South Dakota.
Other permits held by Dream Construction, Inc.
- SHEPHERD HILLS SOUTH PH 2 - STREET & UTILITIES, Rapid City: SDR10K908
- SHEPHERD HILLS SOUTH PHASE 6 - UTILITIES, Rapid City: SDR10P5C9, issued 2024-09-24
- BHIC - CAPACITOR BLVE PHASE 1, Rapid City: SDR10P5KW, issued 2025-05-22
- HOMESTEAD STREET EXTENSION, Rapid City: SDR10P5SD, issued 2025-12-31
Coverages issued nearest SDR10P57X
- 2024-06-06: REMEMBERING THE CHILDREN MEMORIAL, Rapid City: SDR10P574, held by Remembering the Children Memorial
- 2024-06-13: BIA ROUTE 88 STRUCTURE REPLACEMENT BRIDGE A154, Loneman: SDR10I039, held by Oglala Sioux Tribe Department of Transportation
- 2024-06-17: AGENCY VILLAGE WATER MAIN LOOPING, Agency Village: SDR10I03A, held by Flatland Excavating
- 2024-06-18: 4TH STREET IMPROVEMENTS, Garretson: SDR10P56E, held by City of Garretson
- 2024-06-18: CALVIN INDUSTRIAL PARK SECOND ADDITION - PHASE 1, Watertown: SDR10P57S, held by Watertown Development Company
- 2024-06-18: MID-DAKOTA BACKWASH RECOVERY, Pierre: SDR10P587, held by Mid Dakota Rural Water System
- 2024-06-20: FOSS FLATS SENIOR APARTMENTS - PHASE 1, Sioux Falls: SDR10P56R, held by Developers & Associates, Inc.
- 2024-06-20: WEB WATER MORATORIUM AREA IMPROVEMENTS PROJECT: CONTRACT 2020-3A SCHEDULES 1 & 2, Mobridge: SDR10P58A, held by Carstensen Contracting, Inc
- 2024-06-20: B-21 STORAGE PHASE 2, Box Elder: SDR10P58H, held by B-21, LLC
- 2024-06-20: HOMESTEAD VISTA SUBDIVISION NEEL STREET EXTENSION PHASE TWO, Rapid City: SDR10P58J, held by Professional Excavating, INC
SHEPHERD HILLS SUBD. PHASE 4 among its neighbors
27 discharge permits are in the 101201110306-Boxelder Creek subwatershed (HUC 101201110306); SDR10P57X is one.
Other permits in the 101201110306-Boxelder Creek subwatershed (HUC 101201110306)
- 10 BEDROCK APARTMENTS, Box Elder: SDR10K732, minor, term to 2023-03-31
- 3525 DYESS AVE GRADING PROJECT, Rapid City: SDR10P5F5, minor, term to 2028-10-31
- ACE STEEL - BORROW SITE GRADING, Rapid City: SDR10J422, minor, term to 2023-03-31
- ALL CITY SUITES AND STORAGE - BOX ELDER, Box Elder: SDR10P52I, minor, term to 2028-10-31
- ASHLAND SUBSTATION, Rapid City: SDR10K861, minor, term to 2023-03-31
- B-21 STORAGE, Box Elder: SDR10K367, minor, term to 2023-03-31
- B-21 STORAGE PHASE 2, Box Elder: SDR10P58H, minor, term to 2028-10-31
- CRANE SHOP, Rapid City: SDR10P5LJ, minor, term to 2028-10-31
- EXCEPTIONAL HEALTHCARE - RAPID CITY, SD 57701, Rapid City: SDR10P5CY, minor, term to 2028-10-31
- FLYING J, Rapid City: SDR10K507, minor, term to 2023-03-31
What stands out
- Its term runs 4 years and 135 days, June 18, 2024 to October 31, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 2,151 discharge permits on the register in South Dakota; 1,370 of them (64%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SHEPHERD HILLS SUBD. PHASE 4 |
|---|---|
| Permittee | Dream Construction, Inc. |
| NPDES ID | SDR10P57X |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | June 18, 2024 |
| Expires | October 31, 2028 |
| Agency | SDDANR |
| Address | Rapid City, SD 57701 |
| Subwatershed | 101201110306-Boxelder Creek (HUC 101201110306) |
NPDES SDR10P57X: effluent limits and exceedances
SHEPHERD HILLS SUBD. PHASE 4 (NPDES SDR10P57X): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10P57X: no pollutant row on file.
NPDES SDR10P57X: inspections, violations and enforcement
NPDES SDR10P57X (SHEPHERD HILLS SUBD. PHASE 4): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10P57X
NPDES SDR10P57X: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10P57X
NPDES SDR10P57X: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.