NPDES SDR10P5G7 · Clean Water Act
ANGOSTURA DAM SPILLWAY CONCRETE REPAIRS, Hot Springs, SD: NPDES SDR10P5G7 discharge permit, effluent exceedances, inspections, penalties
ANGOSTURA DAM SPILLWAY CONCRETE REPAIRS, Hot Springs, South Dakota: General permit coverage SDR10P5G7, held by T1 Construction LLC; Construction stormwater; Effective; issued March 13, 2025, term to October 31, 2028, by SDDANR.
- September 3, 2026: Evaluation (S).
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 762 were issued before SDR10P5G7.
Coverages issued nearest SDR10P5G7
- 2025-03-12: PCN 01V7, Sioux Falls: SDR10P5I5, held by SD Department of Transportation
- 2025-03-12: PCN 05HN, Sioux Falls: SDR10P5I9, held by SD Department of Transportation
- 2025-03-12: PCN 04EW, Bradley: SDR10P5IA, held by SD Department of Transportation
- 2025-03-12: PCN 08MG, Wolsey: SDR10P5II, held by SD Department of Transportation
- 2025-03-13: EAST LOW ZONE WATER SYSTEM IMPROVEMENTS, Spearfish: SDR10P59T, held by RCS Construction
- 2025-03-13: CIRCLE K - RAPID CITY SD - HWY 16 & MOON MEADOWS DR, Rapid City: SDR10P5HM, held by Holiday Stationstores, LLC, a Minnesota Limited liability company
- 2025-03-14: ROSILEE LANE SANITARY SEWER IMPROVEMENTS/ WESTON HEIGHTS SUBDIVISION, Rapid City: SDR10P5HT, held by Hayworth Enterprises, LLC
- 2025-03-14: RCWD - REGIONAL WATERLINE PROJECT - STICKNEY TO MITCHELL, Stickney: SDR10P5HY, held by General Excavating
- 2025-03-14: BRANDON SITE DEVELOPMENT, Brandon: SDR10P5ID, held by Koehn Properties LLC
- 2025-03-14: YANKTON WASTEWATER TREATMENT PLANT IMPROVEMENTS, Yankton: SDR10P5IL, held by John T. Jones Construction
ANGOSTURA DAM SPILLWAY CONCRETE REPAIRS among its neighbors
2 discharge permits are in the Slate Spring Draw-Cheyenne River subwatershed (HUC 101201090301); SDR10P5G7 is one.
Other permits in the Slate Spring Draw-Cheyenne River subwatershed (HUC 101201090301)
- PCN 06DQ, Hot Springs: SDR10P429
What stands out
- Its term runs 3 years and 232 days, March 13, 2025 to October 31, 2028.
- Its newest dated event on file is an inspection on September 3, 2026, 41 days before EPA's file was loaded.
- In the 365 days to October 14, 2026, it was dated 1 inspection.
- EPA's file dates 1 event for it, all in 2026.
- It is one of 2,151 discharge permits on the register in South Dakota; 1,370 of them (64%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | ANGOSTURA DAM SPILLWAY CONCRETE REPAIRS |
|---|---|
| Permittee | T1 Construction LLC |
| NPDES ID | SDR10P5G7 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 13, 2025 |
| Expires | October 31, 2028 |
| Agency | SDDANR |
| Address | Hot Springs, SD 57747 |
| Subwatershed | Slate Spring Draw-Cheyenne River (HUC 101201090301) |
NPDES SDR10P5G7: effluent limits and exceedances
ANGOSTURA DAM SPILLWAY CONCRETE REPAIRS (NPDES SDR10P5G7): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES SDR10P5G7: no pollutant row on file.
NPDES SDR10P5G7: inspections, violations and enforcement
NPDES SDR10P5G7: 1 inspection
| Date | What EPA recorded | Agency |
|---|---|---|
| September 3, 2026 | Evaluation | S |
NPDES SDR10P5G7 (ANGOSTURA DAM SPILLWAY CONCRETE REPAIRS): no single-event violation, formal enforcement action and informal enforcement action on file.
Watch NPDES SDR10P5G7
NPDES SDR10P5G7: one email when its EPA record changes — $99/month.
Permits near NPDES SDR10P5G7
NPDES SDR10P5G7: 0 pollutant rows, 1 dated events; ICIS-NPDES download, loaded October 14, 2026.