Clean Water Act discharge permit · NPDES SDR10P5M1
CAMPUS WIDE, SEWER & STORM SEWER INFRASTRUCTURE CAT 5.2, Sioux Falls, SD: NPDES SDR10P5M1 discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
CAMPUS WIDE, SEWER & STORM SEWER INFRASTRUCTURE CAT 5.2, held by SD Office of the State Engineer, holds NPDES permit SDR10P5M1. EPA’s file records it issued June 30, 2025 and expiring October 31, 2028. The status and dates are as EPA’s permit file stood when Velarion loaded it (October 14, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for CAMPUS WIDE, SEWER & STORM SEWER INFRASTRUCTURE CAT 5.2: its NPDES ID, its permit type and status, its dates, its address in Sioux Falls, South Dakota. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES SDR10P5M1.
What stands out
- Its term runs 3 years and 123 days, June 30, 2025 to October 31, 2028.
- No dated event in the 365 days to October 14, 2026.
- It is one of 2,151 discharge permits on the register in South Dakota; 1,370 of them (64%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | CAMPUS WIDE, SEWER & STORM SEWER INFRASTRUCTURE CAT 5.2 |
|---|---|
| Permittee as filed | SD Office of the State Engineer |
| NPDES ID | SDR10P5M1 |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | June 30, 2025 |
| Expiration date | October 31, 2028 |
| Issuing agency | SDDANR |
| Address | Sioux Falls, SD 57107 |
| Subwatershed | Outlet Skunk Creek (HUC 101702031105) |
Cited to the EPA ICIS-NPDES permit file (ECHO download).
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES SDR10P5M1.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES SDR10P5M1.
Inspections
EPA’s inspection file holds no inspection for NPDES SDR10P5M1.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES SDR10P5M1.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, SDR10P5M1.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID SDR10P5M1 there.
CAMPUS WIDE, SEWER & STORM SEWER INFRASTRUCTURE CAT 5.2, Sioux Falls, South Dakota: Coverage under a general permit SDR10P5M1, held by SD Office of the State Engineer; Construction stormwater; Effective; issued June 30, 2025, term to October 31, 2028, by SDDANR.
South Dakota holds 1,358 Construction stormwater coverages of this permit type in EPA’s file; 869 were issued before SDR10P5M1.
Coverages issued nearest SDR10P5M1
- 2025-06-24: CITY OF DESMET CALUMET AVE WATERMAIN, De Smet: SDR10P5MO, held by Halme Inc.
- 2025-06-30: LINKS ADDITION - MULTIFAMILY SITE, Yankton: SDR10P5DU, held by Sodak Properties Group LLC
- 2025-06-30: SDSU CAMPUS WIDE, REPLACEMENT/REHAB SAN SEWER SYSTEM CAT 5.5, Brookings: SDR10P5IX, held by South Dakota State University
- 2025-06-30: ALDI - BROOKINGS, Brookings: SDR10P5K1, held by ALDI
- 2025-06-30: B22003 - HILL CITY BROADBAND EAST ROUTE C FTTH UPGRADE 2025, Hill City: SDR10P5LH, held by North Central Service
- 2025-06-30: WALNUT STREET FROM 8TH ST. TO 15TH ST. - STREET & UTILITY RECONSTRUCTION, Yankton: SDR10P5M5, held by City of Yankton
- 2025-06-30: 12TH & LOCUST WATERMAIN AND STREET REPLACEMENT, Yankton: SDR10P5M6, held by City of Yankton
- 2025-06-30: KAREN DRIVE, BRADLEY STREET AND VALLEY ROAD WATERMAIN REPLACEMENT, Yankton: SDR10P5M7, held by City of Yankton
- 2025-06-30: SPRING CREEK / COW CREEK SANITARY DISTRICT WASTEWATER TREATMENT FACILITY, Pierre: SDR10P5MI, held by Flatland Excavating
- 2025-06-30: DEADWOOD RIDGE APARTMENTS - UTILITY IMPROVEMENTS PROJECT, Deadwood: SDR10P5MJ, held by Deadwood Ridge Apartments, LLC
CAMPUS WIDE, SEWER & STORM SEWER INFRASTRUCTURE CAT 5.2 among its neighbors
44 discharge permits are in the Outlet Skunk Creek subwatershed (HUC 101702031105); SDR10P5M1 is one.
Other permits in the Outlet Skunk Creek subwatershed (HUC 101702031105)
- 2025 MISCELLANEOUS DRAINAGE IMPROVEMENTS, Sioux Falls: SDR10P5MM, minor, term to 2028-10-31
- 41 ELLIS ADDITION, Sioux Falls: SDR10K407, minor, term to 2023-03-31
- 4200 N MARION ROAD APARTMENTS, Sioux Falls: SDR10K535, minor, term to 2023-03-31
- BASIN 15 EQ BASIN AND LIFT STATION, PHASE 2C EXTENSTION, Sioux Falls: SDR10P5EP, minor, term to 2028-10-31
- BASIN 15 SANITARY SEWER, PHASE 2A & PHASE 2B EXTENSION, Sioux Falls: SDR10P5B1, minor, term to 2028-10-31
- BETTERWAY INVESTMENTS - SIOUX FALLS DEVELOPMENT, Sioux Falls: SDR10P5T6, minor, term to 2028-10-31
- BIG LOST MEADERY/RANCH & ROOST, Sioux Falls: SDR10P550, minor, term to 2028-10-31
- BOYCE PARK ADDITION PHASES 4 & 5, Sioux Falls: SDR10P5BB, minor, term to 2028-10-31
- CARDINAL COVE ADDITION, Sioux Falls: SDR10I515, minor, term to 2023-03-31
- CASEY'S #4660 SIOUX FALLS - MARION RD AND VISION DR, Sioux Falls: SDR10P5PO, minor, term to 2028-10-31
Nearby on the register
- Discharge permits in Sioux Falls
- Every permit record in Sioux Falls, A to Z
- Discharge permits in South Dakota
- Every permit record in South Dakota, A to Z
Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.
What this page shows
CAMPUS WIDE, SEWER & STORM SEWER INFRASTRUCTURE CAT 5.2 is one of 267 storm water construction permits on EPA's NPDES register in Sioux Falls. Of all 253 storm water construction permits in Sioux Falls, including this one, 74.7% have an earlier issue date than this permit. The permit is one of 44 NPDES permits in the Outlet Skunk Creek subwatershed (HUC 101702031105).