NPDES TNR137755 · Clean Water Act
EASTBRIDGE LOOP PHASE 2B GAS PROJECT, Mascot, TN: NPDES TNR137755 discharge permit, effluent exceedances, inspections, penalties
EASTBRIDGE LOOP PHASE 2B GAS PROJECT, Mascot, Tennessee: General permit coverage TNR137755, held by Knoxville Utilities Board (KUB); Construction stormwater; Effective; issued November 18, 2024, term to September 30, 2026, by TDEC - DWR; discharges to Holston.
Tennessee holds 9,340 Construction stormwater coverages of this permit type in EPA’s file; 6,090 were issued before TNR137755. Knoxville Utilities Board (KUB) holds 6 permits in Tennessee.
Other permits held by Knoxville Utilities Board (KUB)
- KNOXVILLE UTILITIES BOARD (KUB) - LOVES CREEK WASTEWATER TREATMENT PLANT (STP), Knoxville: TN0021822, issued 2019-10-01
- KUB - FOURTH CREEK STP, Knoxville: TN0023574, issued 2018-03-02
- KNOXVILLE UTILITIES BOARD - EAST BRIDGE STP, Knoxville: TN0061743, issued 2019-11-29
- DRINKING WATER/SEWER LINEAR PROJECTS FOR THE KNOXVILLE UTILITIES BOARD (KUB), Knoxville: TNR134183, issued 2012-07-03
- EASTBRIDGE LOOP PHASE 2A GAS PROJECT, Mascot: TNR137760, issued 2024-11-18
Coverages issued nearest TNR137755
- 2024-11-15: FALL CREEK ESTATES - PHASE 1, Smithville: TNR172632, held by Hollingshead Land
- 2024-11-15: EATONS CREEK COTTAGES, Joelton: TNR247889, held by Joelton TC Ventures LLC
- 2024-11-15: BURLEY STABILIZATION CORPORATION, Springfield: TNR247893, held by Burley Stabilization Corporation
- 2024-11-18: INDUSTRIAL SPECULATIVE BUILDING, Dyersburg: TNR122964, held by Industrial Development Board of Dyer County
- 2024-11-18: EQUISTAR CHEMICALS, LP, Jackson: TNR122965, held by Equistar Chemicals, LP
- 2024-11-18: EASTBRIDGE LOOP PHASE 2A GAS PROJECT, Mascot: TNR137760, held by Knoxville Utilities Board (KUB)
- 2024-11-18: HOMEWOOD SUITES, Memphis: TNR155673, held by Shelby Cordova Hospitality, LLC
- 2024-11-18: HOLIDAY INN AND SUITES, Memphis: TNR155674, held by Market Farms Hospitality, LLC
- 2024-11-18: ELK WAREHOUSE, Memphis: TNR155686, held by Riyadh Elkhayyat
- 2024-11-18: FIRE STATION #2, Cookeville: TNR172655, held by City of Cookeville - Mary Beth Elrod
EASTBRIDGE LOOP PHASE 2B GAS PROJECT among its neighbors
31 discharge permits are in the Holston River-Clift Creek subwatershed (HUC 060101040307); TNR137755 is one. Its county: 625, 10 major; TNR137755 is minor permit.
Other permits in the Holston River-Clift Creek subwatershed (HUC 060101040307)
- 7200 WASHINGTON PIKE, Knoxville: TNR138132, minor, term to 2026-09-30
- 7514 MILLERTOWN SUBDIVISION, Knoxville: TNR138078, minor, term to 2026-09-30
- APAC - ATLANTIC HARRISON DIVISION/MASCOT ASPHALT, Mascot: TNR053465, minor, term to 2020-04-14
- ASHEVILLE HIGHWAY SUBDIVISION, Knoxville: TNR136471, minor, term to 2026-09-30
- BROOKS MEADOWS, Knoxville: TNR136387, minor, term to 2026-09-30
- CARTER RIDGE SUBDIVISION PHASE 6, Knoxville: TNR137683, minor, term to 2026-09-30
- CREEKVIEW TRAIL CONDOMINIUMS, Knoxville: TNR138140, minor, term to 2026-09-30
- DARLING INGREDIENTS INC. (FKA VALLEY PROTEIN FKA CBP RESOURCES INC), Strawberry Plains: TN0005371, minor, term to 2024-11-30
- DARLING INGREDIENTS INC. (FKA VALLEY PROTEIN FKA CBP RESOURCES INC), Strawberry Plains: TNR053278, minor, term to 2030-06-30
- ELITE CONSTRUCTION ON MILLERTOWN PIKE, Knoxville: TNR135728, minor, term to 2021-09-30
What stands out
- Its term runs 1 year and 316 days, November 18, 2024 to September 30, 2026.
- No dated event in the 365 days to September 15, 2026.
- It is one of 12,924 discharge permits on the register in Tennessee; 9,348 of them (72%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | EASTBRIDGE LOOP PHASE 2B GAS PROJECT |
|---|---|
| Permittee | Knoxville Utilities Board (KUB) |
| NPDES ID | TNR137755 |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 18, 2024 |
| Expires | September 30, 2026 |
| Agency | TDEC - DWR |
| Address | Mascot, TN 37806 |
| Receiving water | Holston |
| Subwatershed | Holston River-Clift Creek (HUC 060101040307) |
NPDES TNR137755: effluent limits and exceedances
EASTBRIDGE LOOP PHASE 2B GAS PROJECT (NPDES TNR137755): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TNR137755: no pollutant row on file.
NPDES TNR137755: inspections, violations and enforcement
NPDES TNR137755 (EASTBRIDGE LOOP PHASE 2B GAS PROJECT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TNR137755
NPDES TNR137755: one email when its EPA record changes — $99/month.
Permits near NPDES TNR137755
NPDES TNR137755: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.