SAM SEYMOUR FAYETTE POWER PROJECT, La Grange, TX: NPDES TX0073121 discharge permit, effluent exceedances, inspections, penalties

SAM SEYMOUR FAYETTE POWER PROJECT, La Grange, Texas: Individual permit TX0073121, held by LOWER COLORADO RIVER AUTHORITY; Administratively continued; issued November 20, 2020, term to November 20, 2025; discharges to CEDAR CREEK RESERVOIR, lk fayette;cedar ck.

10 of the 32 pollutants listed for NPDES TX0073121 have no violation or effluent exceedance.

  • Solids, total suspended: 8 limits, 19 violations of any kind, 9 effluent exceedances, latest June 30, 2021, largest 802% over the limit.
  • Chlorine, total residual: 3 limits, 27 violations of any kind, 3 effluent exceedances, latest October 31, 2017, largest 45% over the limit.
  • pH: 10 limits, 12 violations of any kind, 2 effluent exceedances, latest October 31, 2019.
  • Selenium, total [as Se]: 6 limits, 3 violations of any kind, 2 effluent exceedances, latest April 30, 2016, largest 111% over the limit.
  • Flow, in conduit or thru treatment plant: 12 limits, 28 violations of any kind.
  • Temperature, water deg. fahrenheit: 3 limits, 6 violations of any kind.
  • BOD, 5-day, 20 deg. C: 0 limits, 6 violations of any kind.
  • Oil & Grease: 8 limits, 4 violations of any kind.
  • Chloride [as Cl]: 2 limits, 2 violations of any kind.
  • Sulfate, total [as SO4]: 2 limits, 2 violations of any kind.
  • Solids, total dissolved: 2 limits, 2 violations of any kind.
  • Low Flow Pass/Fail Survival Test Static Renewal 7 Day Chronic Ceriodaphnia dubia: 0 limits, 2 violations of any kind.
  • Low Flow Pass/Fail Survival Test Static Renewal 7 Day Chronic Pimephales promelas: 0 limits, 2 violations of any kind.
  • NOEC Sub-Lethal Static Renewal 7 Day Chronic Pimephales promelas: 0 limits, 2 violations of any kind.
  • Pass/Fail Sub-Lethal Static Renewal 7 Day Chronic Ceriodaphnia dubia: 0 limits, 2 violations of any kind.
  • Pass/Fail Sub-Lethal Static Renewal 7 Day Chronic Pinephales promelas: 0 limits, 2 violations of any kind.
  • LOEC Lethal Survival Static Renewal 7 Day Chronic Ceriodaphnia dubia: 0 limits, 2 violations of any kind.
  • LOEC Lethal Survival Static Renewal 7 Day Chronic Pimephales promelas: 0 limits, 2 violations of any kind.
  • LOEC Sub-Lethal Reproduction Static Renewal 7 Day Chronic Ceriodaphnia dubia: 0 limits, 2 violations of any kind.
  • LOEC Sub-Lethal Reproduction Static Renewal 7 Day Chronic Pimephales promelas: 0 limits, 2 violations of any kind.
  • LC50 Pass/Fail Static 24Hr Acute D. Pulex: 1 limit, 1 violation of any kind.
  • LC50 Pass/Fail Static 24Hr Acute Pimephales promelas: 1 limit, 1 violation of any kind.
  • Whole effluent toxicity - retest #1: 3 limits.
  • Whole effluent toxicity - retest #2: 3 limits.
  • IC25 Low Flow Pass/Fail Lethal Static Renewal 7 Day Chronic Ceriodaphnia dubia: 2 limits.
  • IC25 Low Flow Pass/Fail Lethal Static Renewal 7 Day Chronic Pimephales promelas: 2 limits.
  • IC25 Low Flow Pass/Fail Sub-Lethal Static Renewal 7 Day Chronic Ceriodaphnia dubia: 2 limits.
  • IC25 Low Flow Pass/Fail Sub-Lethal Static Renewal 7 Day Chronic Pimephales promelas: 2 limits.
  • IC25 Lethal Static Renewal 7 Day Chronic Ceriodaphnia dubia: 2 limits.
  • IC25 Lethal Static Renewal 7 Day Chronic Pimephales promelas: 2 limits.
  • IC25 Sub-Lethal Static Renewal 7 Day Chronic Ceriodaphnia dubia: 2 limits.
  • IC25 Sub-Lethal Static Renewal 7 Day Chronic Pimephales promelas: 2 limits.
  • April 15, 2026: Focused (S).
  • November 9, 2021: Permit Violations - Violation Specified in Comment (ST6).

Other permits held by LOWER COLORADO RIVER AUTHORITY

SAM SEYMOUR FAYETTE POWER PROJECT among its neighbors

5 discharge permits are in the Baylor Creek-Colorado River subwatershed (HUC 120903010706); TX0073121 is one. Its county: 50, 1 major; TX0073121 is major permit.

Other permits in the Baylor Creek-Colorado River subwatershed (HUC 120903010706)

What stands out

  • Its term runs 5 years, November 20, 2020 to November 20, 2025; the term ended 328 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
  • Its newest dated event on file is an inspection on April 15, 2026, 182 days before EPA's file was loaded.
  • In the 365 days to October 14, 2026, it was dated 1 inspection.
  • EPA's file dates 2 events for it, from 2021 to 2026.
  • 4 of its 32 pollutants on file have an effluent exceedance (13%); 22 are under a numeric limit; the largest exceedance is Solids, total suspended at 802% over its limit.
  • It is one of 39,714 discharge permits on the register in Texas; the file names no program for it, and it is a major discharger.

Identity

FacilitySAM SEYMOUR FAYETTE POWER PROJECT
PermitteeLOWER COLORADO RIVER AUTHORITY
NPDES IDTX0073121
StatusAdministratively continued
TypeIndividual permit
ClassMajor
Facility typeNon-POTW
IssuedNovember 20, 2020
ExpiresNovember 20, 2025
AddressLa Grange, TX 78945
Receiving waterCEDAR CREEK RESERVOIR, lk fayette;cedar ck
SubwatershedBaylor Creek-Colorado River (HUC 120903010706)
SIC4911 – Electric Services
Other EPA IDs (FRS)RCRA handler TXD083566547; ICIS-AIR source TX0000004814900005

NPDES TX0073121: effluent limits and exceedances

SAM SEYMOUR FAYETTE POWER PROJECT (NPDES TX0073121): 32 pollutants on file, 22 limited; 22 with a violation of any kind, 4 with an exceedance.

How exceedances are counted.

PollutantLimitsViolationsExceedancesLatestLargest, as filed
Solids, total suspended8199June 30, 2021802% over the limit
Chlorine, total residual3273October 31, 201745% over the limit
pH10122October 31, 2019
Selenium, total [as Se]632April 30, 2016111% over the limit
Flow, in conduit or thru treatment plant12280
Temperature, water deg. fahrenheit360
BOD, 5-day, 20 deg. C060
Oil & Grease840
Chloride [as Cl]220
Sulfate, total [as SO4]220
Solids, total dissolved220
Low Flow Pass/Fail Survival Test Static Renewal 7 Day Chronic Ceriodaphnia dubia020
Low Flow Pass/Fail Survival Test Static Renewal 7 Day Chronic Pimephales promelas020
NOEC Sub-Lethal Static Renewal 7 Day Chronic Pimephales promelas020
Pass/Fail Sub-Lethal Static Renewal 7 Day Chronic Ceriodaphnia dubia020
Pass/Fail Sub-Lethal Static Renewal 7 Day Chronic Pinephales promelas020
LOEC Lethal Survival Static Renewal 7 Day Chronic Ceriodaphnia dubia020
LOEC Lethal Survival Static Renewal 7 Day Chronic Pimephales promelas020
LOEC Sub-Lethal Reproduction Static Renewal 7 Day Chronic Ceriodaphnia dubia020
LOEC Sub-Lethal Reproduction Static Renewal 7 Day Chronic Pimephales promelas020
LC50 Pass/Fail Static 24Hr Acute D. Pulex110
LC50 Pass/Fail Static 24Hr Acute Pimephales promelas110
Whole effluent toxicity - retest #1300
Whole effluent toxicity - retest #2300
IC25 Low Flow Pass/Fail Lethal Static Renewal 7 Day Chronic Ceriodaphnia dubia200
IC25 Low Flow Pass/Fail Lethal Static Renewal 7 Day Chronic Pimephales promelas200
IC25 Low Flow Pass/Fail Sub-Lethal Static Renewal 7 Day Chronic Ceriodaphnia dubia200
IC25 Low Flow Pass/Fail Sub-Lethal Static Renewal 7 Day Chronic Pimephales promelas200
IC25 Lethal Static Renewal 7 Day Chronic Ceriodaphnia dubia200
IC25 Lethal Static Renewal 7 Day Chronic Pimephales promelas200
IC25 Sub-Lethal Static Renewal 7 Day Chronic Ceriodaphnia dubia200
IC25 Sub-Lethal Static Renewal 7 Day Chronic Pimephales promelas200

NPDES TX0073121: inspections, violations and enforcement

NPDES TX0073121: 1 single-event violation

DateWhat EPA recordedAgency
November 9, 2021Permit Violations - Violation Specified in CommentST6

NPDES TX0073121: 1 inspection

DateWhat EPA recordedAgency
April 15, 2026FocusedS

NPDES TX0073121 (SAM SEYMOUR FAYETTE POWER PROJECT): no formal enforcement action and informal enforcement action on file.

Watch NPDES TX0073121

NPDES TX0073121: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES TX0073121

NPDES TX0073121: 32 pollutant rows, 2 dated events; ICIS-NPDES download, loaded October 14, 2026.