NPDES TX0119580 · Clean Water Act
EAGLE PASS POWER STATION, Eagle Pass, TX: NPDES TX0119580 discharge permit, effluent exceedances, inspections, penalties
EAGLE PASS POWER STATION, Eagle Pass, Texas: Individual permit TX0119580, held by MAVERICK COUNTY WCID 1; Administratively continued; issued January 6, 2020, term to January 6, 2025; discharges to RIO GRANDE BELOW AMISTAD RESV.
- Flow [dry weather]: 2 limits, 27 violations of any kind, 1 effluent exceedance, latest June 30, 2012, largest 555% over the limit.
- pH: 2 limits, 54 violations of any kind.
- Flow, in conduit or thru treatment plant: 2 limits, 30 violations of any kind.
- Oil & Grease: 2 limits, 22 violations of any kind.
- September 17, 2024: Permit Violations - Violation Specified in Comment (ST6).
EAGLE PASS POWER STATION among its neighbors
5 discharge permits are in the Quemado Creek-Rio Grande subwatershed (HUC 130800010803); TX0119580 is one. Its county: 36, 3 major; TX0119580 is minor permit.
Other permits in the Quemado Creek-Rio Grande subwatershed (HUC 130800010803)
- MAVERICK COUNTY WATER CONTROL IRRIGATION DISTRICT, Quemado: TXR1503TU, minor, term to 2028-03-04
- QUEMADO LAYDOWN YARD, Quemado: TXR1505TU, minor, term to 2028-03-04
- SELECT QUALITY MATERIALS AND CONCRETE, Eagle Pass: TXR05GD96, minor, term to 2026-08-13
- WATERMELON FARM BATCH PLANT, Quemado: TXG113725, minor, term to 2026-11-06
What stands out
- Its term runs 5 years, January 6, 2020 to January 6, 2025; the term ended 646 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- Its newest dated event on file is a single-event violation on September 17, 2024, 757 days before EPA's file was loaded.
- No dated event in the 365 days to October 14, 2026.
- EPA's file dates 1 event for it, all in 2024.
- 1 of its 4 pollutants on file has an effluent exceedance (25%); 4 are under a numeric limit; the largest exceedance is Flow [dry weather] at 555% over its limit.
- It is one of 39,714 discharge permits on the register in Texas; the file names no program for it, and it is a minor discharger.
Identity
| Facility | EAGLE PASS POWER STATION |
|---|---|
| Permittee | MAVERICK COUNTY WCID 1 |
| NPDES ID | TX0119580 |
| Status | Administratively continued |
| Type | Individual permit |
| Class | Minor |
| Facility type | Non-POTW |
| Issued | January 6, 2020 |
| Expires | January 6, 2025 |
| Address | Eagle Pass, TX 78852 |
| Receiving water | RIO GRANDE BELOW AMISTAD RESV |
| Subwatershed | Quemado Creek-Rio Grande (HUC 130800010803) |
| SIC | 4911 – Electric Services |
NPDES TX0119580: effluent limits and exceedances
EAGLE PASS POWER STATION (NPDES TX0119580): 4 pollutants on file, 4 limited; 4 with a violation of any kind, 1 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| Flow [dry weather] | 2 | 27 | 1 | June 30, 2012 | 555% over the limit |
| pH | 2 | 54 | 0 | ||
| Flow, in conduit or thru treatment plant | 2 | 30 | 0 | ||
| Oil & Grease | 2 | 22 | 0 |
NPDES TX0119580: inspections, violations and enforcement
NPDES TX0119580: 1 single-event violation
| Date | What EPA recorded | Agency |
|---|---|---|
| September 17, 2024 | Permit Violations - Violation Specified in Comment | ST6 |
NPDES TX0119580 (EAGLE PASS POWER STATION): no inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TX0119580
NPDES TX0119580: one email when its EPA record changes — $99/month.
Permits near NPDES TX0119580
NPDES TX0119580: 4 pollutant rows, 1 dated events; ICIS-NPDES download, loaded October 14, 2026.