NPDES TX0133175 · Clean Water Act
ENTERPRISE EAST STORAGE SPLITTER III FACILITY, Mont Belvieu, TX: NPDES TX0133175 discharge permit, effluent exceedances, inspections, penalties
ENTERPRISE EAST STORAGE SPLITTER III FACILITY, Mont Belvieu, Texas: Individual permit TX0133175, held by ENTERPRISE PRODUCTS OPERATING LLC; Administratively continued; issued September 27, 2018, term to September 27, 2023; discharges to ROADSIDE DITCHES;LSMITH GULLY,CEDAR BAYOU TIDAL.
2 of the 8 pollutants listed for NPDES TX0133175 have no violation or effluent exceedance.
- Oxygen demand, chem. [high level] [COD]: 2 limits, 15 violations of any kind, 15 effluent exceedances, latest January 31, 2022, largest 119% over the limit.
- Chlorine, free available: 2 limits, 12 violations of any kind, 12 effluent exceedances, latest May 31, 2022, largest 340% over the limit.
- Copper, total [as Cu]: 4 limits, 11 violations of any kind, 11 effluent exceedances, latest August 31, 2022, largest 1,639% over the limit.
- pH: 2 limits, 6 violations of any kind, 6 effluent exceedances, latest November 30, 2021.
- Solids, total suspended: 2 limits, 2 violations of any kind, 2 effluent exceedances, latest February 28, 2019, largest 25% over the limit.
- Oil & Grease: 2 limits, 2 violations of any kind, 2 effluent exceedances, latest July 31, 2015, largest 445% over the limit.
- Flow, in conduit or thru treatment plant: 2 limits.
- BOD, 5-day, 20 deg. C: 1 limit.
Other permits held by ENTERPRISE PRODUCTS OPERATING LLC
- MORGAN'S POINT COMPLEX, Morgans Point: TX0106721, issued 2019-03-19
- ENTERPRISE PASADENA PLANT, Pasadena: TX0131768, issued 2018-05-14
- HOUSTON SHIP CHANNEL MARINE LOADING FACILITY, Houston: TX0133353, issued 2017-11-28
- YOAKUM CRYOGENIC PLANT, Yoakum: TX0134077, issued 2019-07-02
- BULLDOG GAS PLANT, Carthage: TX0134080, issued 2019-09-11
- MONT BELVIEU HATCHERVILLE COMPLEX, Baytown: TX0134465, issued 2016-12-13
- HOUSTON SHIP CHANNEL EXPANSION FACILITY, Houston: TX0135551, issued 2015-02-17
- MONT BELVIEU HATCHERVILLE COMPLEX, Baytown: TX0139076, issued 2019-09-23
- MONT BELVIEW HATCHERVILLE COMPLEX, Baytown: TX0141020, issued 2021-09-15
- BEAUMONT MARINE EAST TERMINAL, Vidor Division: TX0144827, issued 2024-08-09
ENTERPRISE EAST STORAGE SPLITTER III FACILITY among its neighbors
67 discharge permits are in the Ellis Branch-Cedar Bayou subwatershed (HUC 120402030105); TX0133175 is one. Its county: 197, 10 major; TX0133175 is minor permit.
Other permits in the Ellis Branch-Cedar Bayou subwatershed (HUC 120402030105)
- ARCANUM BAYTOWN SITE, Baytown: TX0003832, minor, term to 2023-10-04
- ARCANUM BAYTOWN SITE, Baytown: TXR05GX94, minor, term to 2026-08-13
- ARCANUM BAYTOWN SITE, Baytown: TXR05HB19, minor, term to 2026-08-13
- ARCANUM BAYTOWN SITE, Baytown: TXR05HC83, minor, term to 2031-08-13
- ARCANUM PROJECT ROBIN, Baytown: TXR1547NZ, minor, term to 2028-03-04
- BAY CREEK, Baytown: TXR1524YP, minor, term to 2028-03-04
- BAY CREEK, Baytown: TXR1586RH, minor, term to 2028-03-04
- BAY CREEK SEC ONE - DETENTION CLEARING GRUBBING GRADING, Baytown: TXR1548MV, minor, term to 2028-03-04
- BAY CREEK SECTION 1, Baytown: TXR1550OL, minor, term to 2028-03-04
- BAYTOWN COMMERCE CENTER - BUILDING 1, Baytown: TXR1557JI, minor, term to 2023-03-04
What stands out
- Its term runs 5 years, September 27, 2018 to September 27, 2023; the term ended 1,113 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- 6 of its 8 pollutants on file have an effluent exceedance (75%); 8 are under a numeric limit; the largest exceedance is Copper, total [as Cu] at 1,639% over its limit.
- It is one of 39,714 discharge permits on the register in Texas; the file names no program for it, and it is a minor discharger.
Identity
| Facility | ENTERPRISE EAST STORAGE SPLITTER III FACILITY |
|---|---|
| Permittee | ENTERPRISE PRODUCTS OPERATING LLC |
| NPDES ID | TX0133175 |
| Status | Administratively continued |
| Type | Individual permit |
| Class | Minor |
| Facility type | Non-POTW |
| Issued | September 27, 2018 |
| Expires | September 27, 2023 |
| Address | Mont Belvieu, TX 77520 |
| Receiving water | ROADSIDE DITCHES;LSMITH GULLY,CEDAR BAYOU TIDAL |
| Subwatershed | Ellis Branch-Cedar Bayou (HUC 120402030105) |
| SIC | 4925 – Gas Production And/Or Distribution |
| Other EPA IDs (FRS) | RCRA handler TXD987981560; ICIS-AIR source TX0000004807100017 |
NPDES TX0133175: effluent limits and exceedances
ENTERPRISE EAST STORAGE SPLITTER III FACILITY (NPDES TX0133175): 8 pollutants on file, 8 limited; 6 with a violation of any kind, 6 with an exceedance.
| Pollutant | Limits | Violations | Exceedances | Latest | Largest, as filed |
|---|---|---|---|---|---|
| Oxygen demand, chem. [high level] [COD] | 2 | 15 | 15 | January 31, 2022 | 119% over the limit |
| Chlorine, free available | 2 | 12 | 12 | May 31, 2022 | 340% over the limit |
| Copper, total [as Cu] | 4 | 11 | 11 | August 31, 2022 | 1,639% over the limit |
| pH | 2 | 6 | 6 | November 30, 2021 | |
| Solids, total suspended | 2 | 2 | 2 | February 28, 2019 | 25% over the limit |
| Oil & Grease | 2 | 2 | 2 | July 31, 2015 | 445% over the limit |
| Flow, in conduit or thru treatment plant | 2 | 0 | 0 | ||
| BOD, 5-day, 20 deg. C | 1 | 0 | 0 |
NPDES TX0133175: inspections, violations and enforcement
NPDES TX0133175 (ENTERPRISE EAST STORAGE SPLITTER III FACILITY): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TX0133175
NPDES TX0133175: one email when its EPA record changes — $99/month.
Permits near NPDES TX0133175
NPDES TX0133175: 8 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.