NPDES TXR05GO60 · Clean Water Act
TESLA, Austin, TX: NPDES TXR05GO60 discharge permit, effluent exceedances, inspections, penalties
TESLA, Austin, Texas: General permit coverage TXR05GO60, held by Tesla, Inc.; Industrial stormwater; Administratively continued; issued November 12, 2024, term to August 13, 2026; Motor Vehicle Body Manufacturing.
Texas holds 8,480 Industrial stormwater coverages of this permit type in EPA’s file; 6,212 were issued before TXR05GO60. Tesla, Inc. holds 6 permits in Texas.
Other permits held by Tesla, Inc.
- BT SMITH BESS FACILITY, Royse City: TXR05GM83, issued 2024-08-21
- TESLA - HOUSTON - 111 EMPIRE BLVD, Brookshire: TXR05HA75, issued 2026-06-18
- TESLA, Austin: TXR1527SS, issued 2024-11-12
- TESLA, Robstown: TXR1556SY, issued 2024-12-09
- TESLA, Kyle: TXRNECK42, issued 2024-11-12
Coverages issued nearest TXR05GO60
- 2024-11-08: HUSA ACCURATE MACHINE WORKS, Houston: TXRNECK38, held by HUSA Accurate Machine Works, Inc.
- 2024-11-11: SHAN NAMKEEN, Garland: TXRNECK39, held by Shan Namkeen, Inc.
- 2024-11-11: PEPSI R&D SUPPORT BUILDING EXPANSION, Plano: TXRNECK40, held by Evans General Contractors, LLC
- 2024-11-11: NITRETEX II, Houston: TXRNECK41, held by Nitretex, LLC
- 2024-11-12: REED PIT, Bronte: TXR05GO59, held by Colorado River Aggregates, LLC
- 2024-11-12: HILAND DAIRY FOODS, Tyler: TXR05GO61, held by Hiland Dairy Foods Company, LLC
- 2024-11-12: TESLA, Kyle: TXRNECK42, held by Tesla, Inc.
- 2024-11-13: GROCERY SUPPLY, San Antonio: TXRNECK43, held by MDV SPARTANNASH, LLC
- 2024-11-13: ALPA PRECISION L, Houston: TXRNECK44, held by ALPA PRECISION, LLP
- 2024-11-14: CORVAC COMPOSITES, San Marcos: TXR05GO63, held by Corvac Composites LLC
TESLA among its neighbors
123 discharge permits are in the Carson Creek-Colorado River subwatershed (HUC 120902050409); TXR05GO60 is one. Its county: 1,099, 15 major; TXR05GO60 is minor permit.
Other permits in the Carson Creek-Colorado River subwatershed (HUC 120902050409)
- 183 RV PARK, Austin: TXR1501NW, minor, term to 2028-03-04
- 5900 BEN WHITE, Austin: TXR1531KZ, minor, term to 2023-03-05
- ABIA - WEST PARKING GARAGE, Austin: TXR1524TX, minor, term to 2028-03-04
- AEDP AIRFIELD INFRASTRUCTURE - MIDFIELD TAXIWAYS, Austin: TXR1534XK, minor, term to 2028-03-04
- AEDP AIRFIELD INFRASTRUCTURE - MIDFIELD TAXIWAYS, Austin: TXR1538SQ, minor, term to 2028-03-04
- AEDP BUILDING DEMOLITION, Austin: TXR1571NK, minor, term to 2028-03-04
- AFCO GSE TRITURATOR - WASHBAY, Austin: TXR1584WM, minor, term to 2028-03-04
- ALASKA AIRLINES - AUSTIN, Austin: TXRNEBR96, minor, term to 2026-08-13
- ALL AMERICAN RECYCLING, Austin: TXR05FH68, minor, term to 2026-08-13
- ALLEGIANT AIR AT AUS, Austin: TXR05GF69, minor, term to 2026-08-13
What stands out
- Its term runs 1 year and 274 days, November 12, 2024 to August 13, 2026; the term ended 62 days before EPA's file was loaded on October 14, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to October 14, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 8,480 of them (21%) are in its program, Industrial stormwater, and it is a minor discharger.
Identity
| Facility | TESLA |
|---|---|
| Permittee | Tesla, Inc. |
| NPDES ID | TXR05GO60 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Industrial stormwater |
| Issued | November 12, 2024 |
| Expires | August 13, 2026 |
| Address | Austin, TX 78725 |
| Subwatershed | Carson Creek-Colorado River (HUC 120902050409) |
| NAICS | 336211 – Motor Vehicle Body Manufacturing |
| SIC | 3711 – Motor Vehicles And Car Bodies |
NPDES TXR05GO60: effluent limits and exceedances
TESLA (NPDES TXR05GO60): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR05GO60: no pollutant row on file.
NPDES TXR05GO60: inspections, violations and enforcement
NPDES TXR05GO60 (TESLA): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR05GO60
NPDES TXR05GO60: one email when its EPA record changes — $99/month.
Permits near NPDES TXR05GO60
NPDES TXR05GO60: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.