NPDES TXR05GV05 · Clean Water Act
WLIKINSON GARY IRON & METAL, Laredo, TX: NPDES TXR05GV05 discharge permit, effluent exceedances, inspections, penalties
WLIKINSON GARY IRON & METAL, Laredo, Texas: General permit coverage TXR05GV05, held by Wilkinson Gary Iron & Metal; Industrial stormwater; Administratively continued; issued September 22, 2025, term to August 13, 2026.
Texas holds 8,480 Industrial stormwater coverages of this permit type in EPA’s file; 7,137 were issued before TXR05GV05.
Coverages issued nearest TXR05GV05
- 2025-09-19: US XPRESS, Dallas: TXR05GV01, held by U.S. XPRESS, INC.
- 2025-09-19: RENTERIAS CRUSHER, Balch Springs: TXR05GV02, held by Fernando Renteria Dba Renterias Crusher
- 2025-09-19: METROPLEX PRODUCTS, Ft Worth: TXRNECO15, held by Hydraulics, Inc.
- 2025-09-22: AST SPACEMOBILE SITE 2, Odessa: TXR05GV03, held by AST & Science, LLC
- 2025-09-22: BANDA PROPERTY, Bastrop: TXR05GV04, held by Rambo Materials, LLC
- 2025-09-22: MINUTEMAN PRESS, Fort Worth: TXRNECO16, held by 5 Then 2 Inc.
- 2025-09-22: MAN MAR TECHNICAL, Houston: TXRNECO17, held by Man Mar Technical, Inc.
- 2025-09-22: VOYAGER PRECISION MACHINING, Houston: TXRNECO18, held by Voyager Precision Machining LLC
- 2025-09-22: WINSYSTEMS, Grand Prairie: TXRNECO19, held by Winsystems, Inc.
- 2025-09-23: GLAZE ROAD PIT, Kountze: TXR05GV06, held by Stanley Dirt & Dozer, LLC
WLIKINSON GARY IRON & METAL among its neighbors
1 discharge permits are in the Middle Carrizitos Creek subwatershed (HUC 121101050402); TXR05GV05 is one. Its county: 238, 7 major; TXR05GV05 is minor permit.
What stands out
- Its term runs 325 days, September 22, 2025 to August 13, 2026; the term ended 33 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 8,480 of them (21%) are in its program, Industrial stormwater, and it is a minor discharger.
Identity
| Facility | WLIKINSON GARY IRON & METAL |
|---|---|
| Permittee | Wilkinson Gary Iron & Metal |
| NPDES ID | TXR05GV05 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Industrial stormwater |
| Issued | September 22, 2025 |
| Expires | August 13, 2026 |
| Address | Laredo, TX 78043 |
| Subwatershed | Middle Carrizitos Creek (HUC 121101050402) |
NPDES TXR05GV05: effluent limits and exceedances
WLIKINSON GARY IRON & METAL (NPDES TXR05GV05): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR05GV05: no pollutant row on file.
NPDES TXR05GV05: inspections, violations and enforcement
NPDES TXR05GV05 (WLIKINSON GARY IRON & METAL): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR05GV05
NPDES TXR05GV05: one email when its EPA record changes — $99/month.
Permits near NPDES TXR05GV05
NPDES TXR05GV05: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.