NPDES TXR05GX49 · Clean Water Act
ALTAIR TX BARTON TRIANGLE, Altair, TX: NPDES TXR05GX49 discharge permit, effluent exceedances, inspections, penalties
ALTAIR TX BARTON TRIANGLE, Altair, Texas: General permit coverage TXR05GX49, held by ANTHONY PRIHODA; Industrial stormwater; Administratively continued; issued December 23, 2025, term to August 13, 2026.
Texas holds 8,480 Industrial stormwater coverages of this permit type in EPA’s file; 7,467 were issued before TXR05GX49.
Coverages issued nearest TXR05GX49
- 2025-12-19: NUMO MANUFACTURING, Kaufman: TXRNECP44
- 2025-12-22: EAST TEXAS PRECAST, Hempstead: TXR05GX46, held by 4-S MANUFACTURING TEXAS LIMITED LIABILITY COMPANY
- 2025-12-22: A-GAS US, Rhome: TXR05GX47, held by A-Gas US Inc.
- 2025-12-22: AMAZONCOM SERVICES LLC - WTX8, Wichita Falls: TXR05GX48, held by Amazon.Com Services LLC
- 2025-12-22: SOUTH TEXAS INTERNATIONAL AIRPORT AT EDINBURG, Edinburg: TXRNECP45, held by City of Edinburg
- 2025-12-24: ROSEVINE QUARRY, San Augustine: TXR05GX50, held by Texas Materials Group, Inc.
- 2025-12-30: 48FORTY SOLUTIONS, Houston: TXR05GX51, held by 48Forty Solutions, LLC
- 2025-12-30: MACKS AUTOMOTIVE, Kirvin: TXRNECP46, held by Macks Automotive
- 2025-12-31: JARCO SANDS, San Antonio: TXR05GX52, held by Jarco Sands, LLC
- 2025-12-31: PATRON MANUFACTURING, Garland: TXR05GX53, held by Anh Nga Nguyen, Patron Manufacturing
ALTAIR TX BARTON TRIANGLE among its neighbors
1 discharge permits are in the Lower Skull Creek subwatershed (HUC 120903020105); TXR05GX49 is one. Its county: 48, 0 major; TXR05GX49 is minor permit.
What stands out
- Its term runs 233 days, December 23, 2025 to August 13, 2026; the term ended 33 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 8,480 of them (21%) are in its program, Industrial stormwater, and it is a minor discharger.
Identity
| Facility | ALTAIR TX BARTON TRIANGLE |
|---|---|
| Permittee | ANTHONY PRIHODA |
| NPDES ID | TXR05GX49 |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Industrial stormwater |
| Issued | December 23, 2025 |
| Expires | August 13, 2026 |
| Address | Altair, TX 77412 |
| Subwatershed | Lower Skull Creek (HUC 120903020105) |
NPDES TXR05GX49: effluent limits and exceedances
ALTAIR TX BARTON TRIANGLE (NPDES TXR05GX49): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR05GX49: no pollutant row on file.
NPDES TXR05GX49: inspections, violations and enforcement
NPDES TXR05GX49 (ALTAIR TX BARTON TRIANGLE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR05GX49
NPDES TXR05GX49: one email when its EPA record changes — $99/month.
Permits near NPDES TXR05GX49
NPDES TXR05GX49: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.