NPDES TXR1502MY · Clean Water Act
TX DOT PROJECT 0002-04-034, Ft Stockton, TX: NPDES TXR1502MY discharge permit, effluent exceedances, inspections, penalties
TX DOT PROJECT 0002-04-034, Ft Stockton, Texas: General permit coverage TXR1502MY, held by Lesna Construction, Inc.; Construction stormwater; Effective; issued May 25, 2023, term to March 4, 2028; discharges to NEAR BY ARROYOS AND CREEKS RIO GRANDE RIVER.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 2,068 were issued before TXR1502MY. Lesna Construction, Inc. holds 5 permits in Texas.
Other permits held by Lesna Construction, Inc.
- CR 872 ASCENSION STREET, El Paso: TXR1520OQ, issued 2023-10-10
- TX DOT PROJECT 2451-02-014, Pecos: TXR1530QA, issued 2024-02-23
- EPW PLANNED WATERLINE PH XII A, El Paso: TXR1570MN, issued 2023-04-20
- LUCKETT WASTEWATER REPLACEMENT, El Paso: TXRCW0116, issued 2023-06-06
Coverages issued nearest TXR1502MY
- 2023-05-24: MCCRARY TRACT UNIT D UNIT B SOUTH OF MCCRARY TR, San Antonio: TXR1558MX, held by SACC, Inc.
- 2023-05-24: HOU CSJ 3538-01-036, Patton Village: TXR1563MX, held by James Construction Group, LLC
- 2023-05-24: WHISPER SOUTH CORE INFRASTRUCTURE AND COMMERCIAL, San Marcos: TXR1567MX, held by Dale Lowden Excavating, LLC
- 2023-05-24: TXDOT FTW CSJ 0258-02-059, Dublin: TXR1569MX, held by Big Creek Construction, Ltd.
- 2023-05-25: IDV WILMER PLEASANT RUN WAREHOUSE, Wilmer: TXR1501MY, held by Raymond Construction Co., Inc.
- 2023-05-25: CAMP BULLIS VEHICLE MAINTENANCE SHOP AND WASH FACILITY, San Antonio: TXR1503MY, held by Direct Steel LLC
- 2023-05-25: MOSTYN SPRINGS SECTION 3, Magnolia: TXR1505MY, held by DeCrosta Construction, LLC
- 2023-05-25: UNIVERSITY OF HOUSTON FUEL DEPOT, Houston: TXR1506MY, held by J.T. Vaughn Construction, LLC
- 2023-05-25: COMANCHE TRAIL, Austin: TXR1507MY, held by Ltb Design Build, LP
- 2023-05-25: FM 2493 CSJ 0191-03-083, Flint: TXR1508MY, held by Texas Department of Transportation
TX DOT PROJECT 0002-04-034 among its neighbors
1 discharge permits are in the Young Lateral-Rio Grande subwatershed (HUC 130401000507); TXR1502MY is one.
What stands out
- Its term runs 4 years and 284 days, May 25, 2023 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | TX DOT PROJECT 0002-04-034 |
|---|---|
| Permittee | Lesna Construction, Inc. |
| NPDES ID | TXR1502MY |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | May 25, 2023 |
| Expires | March 4, 2028 |
| Address | Ft Stockton, TX 79735 |
| Receiving water | NEAR BY ARROYOS AND CREEKS RIO GRANDE RIVER |
| Subwatershed | Young Lateral-Rio Grande (HUC 130401000507) |
NPDES TXR1502MY: effluent limits and exceedances
TX DOT PROJECT 0002-04-034 (NPDES TXR1502MY): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1502MY: no pollutant row on file.
NPDES TXR1502MY: inspections, violations and enforcement
NPDES TXR1502MY (TX DOT PROJECT 0002-04-034): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1502MY
NPDES TXR1502MY: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1502MY
NPDES TXR1502MY: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.