NPDES TXR1503YD · Clean Water Act
DFW SOIL SLOPES REMEDIATION PH 3 SLOPES 10 & 11, Euless, TX: NPDES TXR1503YD discharge permit, effluent exceedances, inspections, penalties
DFW SOIL SLOPES REMEDIATION PH 3 SLOPES 10 & 11, Euless, Texas: General permit coverage TXR1503YD, held by Urban Infraconstruction LLC; Construction stormwater; Effective; issued May 4, 2026, term to March 4, 2028; discharges to BIG BEAR CREEK.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 20,784 were issued before TXR1503YD. Urban Infraconstruction LLC holds 8 permits in Texas.
Other permits held by Urban Infraconstruction LLC
- LEBANON ROAD WIDENING - FM 423 TO TODD DRIVE, Frisco: TXR1529WF, issued 2025-10-22
- DFW-REHAB EXISTING MS10.0B, Dfw Airport: TXR1547YG, issued 2026-05-14
- DALLAS PARKWAY IMPROVEMENTS PHASE 4, Frisco: TXR1569PZ, issued 2024-02-21
- COCKRELL HILL RD, Dallas: TXR1575XZ, issued 2026-04-21
- B24-0402 - SOIL SLOPES REMEDIATION - PHASE 3, Dfw Airport: TXR1579VU, issued 2025-09-10
- TEEL PARKWAY NB BRIDGE AT PANTHER CREEK, Frisco: TXR1581WL, issued 2025-11-14
- TXDOT DAL 1015-01-024 FM 549, Rockwall: TXR1589YF, issued 2026-05-12
Coverages issued nearest TXR1503YD
- 2026-05-01: HAGGARD FARM TOWNHOMES, Plano: TXR1592YC, held by Sw Haggard Master Developer, LLC
- 2026-05-01: WICHITA SOLAR NORTH, Electra: TXR1593YC, held by M. A. Mortenson Company
- 2026-05-03: MLINGO DEVELOPMENT - TIMBER POINT, La Vernia: TXR1594YC, held by Mlingo Development LLC
- 2026-05-04: HORIZON RANCH-PHASE 1, Decatur: TXR1501YD, held by Kyle Erwin Construction, LLC
- 2026-05-04: CROSBY 6TH GRADE CAMPUS, Crosby: TXR1502YD, held by Gamma Construction Company
- 2026-05-04: CEDAR PORT USX1 PHASE 3 DRAINAGE PROJECT, Mont Belvieu: TXR1504YD, held by Trans-Global Solutions, Inc.
- 2026-05-04: QUAIL VALLEY MIDDLE SCHOOL, Missouri City: TXR1505YD, held by E Contractors Usa, LLC
- 2026-05-04: LA CIMA PHASE 6A, San Marcos: TXR1507YD, held by Newmark Homes Austin, LLC
- 2026-05-04: KINDER WEST UNIT 13 ENCLAVE, San Antonio: TXR1508YD, held by DNT Construction, LLC
- 2026-05-04: KINDER SUNDAY CREEK PHASE 2, San Antonio: TXR1509YD, held by DNT Construction, LLC
DFW SOIL SLOPES REMEDIATION PH 3 SLOPES 10 & 11 among its neighbors
101 discharge permits are in the Big Bear Creek subwatershed (HUC 120301020703); TXR1503YD is one. Its county: 1,661, 7 major; TXR1503YD is minor permit.
Other permits in the Big Bear Creek subwatershed (HUC 120301020703)
- 210 HARDY DRIVE, Colleyville: TXR1522YS, minor, term to 2028-03-04
- 2910 PARR LANE PHASE 1, Grapevine: TXR1559QC, minor, term to 2028-03-04
- 3036 PARR LANE AND 3107 WINTERGREEN TERRACE, Grapevine: TXR1549XK, minor, term to 2028-03-04
- 7-ELEVEN NEC I-35 AND TIMBERLAND BLVD, Fort Worth: TXR1552MH, minor, term to 2028-03-04
- 7224 OAK ALLEY DRIVE, Colleyville: TXR1537MM, minor, term to 2028-03-04
- AIR GENERAL INC- DFW, Dfw: TXRNECI09, minor, term to 2026-08-13
- ALTA VISTA MHP WWTP, Keller: TX0023591, minor, term to 2011-09-01
- AMERIFLIGHT, Dallas: TXR05EY39, minor, term to 2026-08-13
- BP AEROSPACE, Euless: TXRNECH64, minor, term to 2026-08-13
- BRUMLOW EAST, Southlake: TXR1584YV, minor, term to 2028-03-04
What stands out
- Its term runs 1 year and 305 days, May 4, 2026 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | DFW SOIL SLOPES REMEDIATION PH 3 SLOPES 10 & 11 |
|---|---|
| Permittee | Urban Infraconstruction LLC |
| NPDES ID | TXR1503YD |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | May 4, 2026 |
| Expires | March 4, 2028 |
| Address | Euless, TX 75261 |
| Receiving water | BIG BEAR CREEK |
| Subwatershed | Big Bear Creek (HUC 120301020703) |
NPDES TXR1503YD: effluent limits and exceedances
DFW SOIL SLOPES REMEDIATION PH 3 SLOPES 10 & 11 (NPDES TXR1503YD): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1503YD: no pollutant row on file.
NPDES TXR1503YD: inspections, violations and enforcement
NPDES TXR1503YD (DFW SOIL SLOPES REMEDIATION PH 3 SLOPES 10 & 11): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1503YD
NPDES TXR1503YD: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1503YD
NPDES TXR1503YD: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.