NPDES TXR1505RN · Clean Water Act
HUTOO SOUTH WWTP PHASE 1- 6MGD EXPANSION, Hutto, TX: NPDES TXR1505RN discharge permit, effluent exceedances, inspections, penalties
HUTOO SOUTH WWTP PHASE 1- 6MGD EXPANSION, Hutto, Texas: General permit coverage TXR1505RN, held by ARCHER WESTERN CONSTRUCTION, LLC; Construction stormwater; Effective; issued July 17, 2024, term to March 4, 2028; discharges to BRUSHY CREEK.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 8,206 were issued before TXR1505RN. ARCHER WESTERN CONSTRUCTION, LLC holds 26 permits in Texas.
Other permits held by ARCHER WESTERN CONSTRUCTION, LLC
- SAWS MEADOW SPRINGS PUMP STATION WELLS NO1 & NO2, Medina Valley: TXR1501XF, issued 2026-02-04
- LAKE RALPH HALL PUMP STATION, Ladonia: TXR1512NC, issued 2023-06-07
- MEGHAN PUMP STATION, San Antonio: TXR1521XW, issued 2026-04-07
- BARBOURS CUT TERMINAL ENTRY GATE, La Porte: TXR1530AO, issued 2019-11-01
- WEST LUBBOCK WATER SYSTEM EXPANSION, Lubbock: TXR1533UY, issued 2025-06-17
- SANTA CLARA CREEK WASTEWATER TREATMENT FACILITY, Seguin: TXR1542TH, issued 2025-01-15
- DOE BRANCH WATER RECLAMATION PLANT, Little Elm: TXR1543TM, issued 2025-02-03
- TURTLE CREEK NO 3, San Antonio: TXR1544IG, issued 2022-03-01
- CLEARWATER CREEK WWTP, Saint Hedwig: TXR1545XK, issued 2026-02-23
- PILOT POINT WWTP IMPROVEMENTS, Pilot Point: TXR1546XY, issued 2026-04-16
Coverages issued nearest TXR1505RN
- 2024-07-16: FM 1518 UTILITY RELOCATION, Schertz: TXR1557RM, held by Schertz 1518, Ltd.
- 2024-07-16: MARVIDA, Cypress: TXR1558RM, held by Hamilton Thomas Homes I, LP
- 2024-07-16: LEXINGTON VILLAGE SECTION 2, Missouri City: TXR1560RM, held by DeCrosta Construction, LLC
- 2024-07-17: CLEARSTONE PRESIDO, Fort Worth: TXR1501RN, held by Dps Developments, LLC
- 2024-07-17: STERLING LAKES N CANTERRA CREEK REC CENTER FACILITY, Iowa Colony: TXR1503RN, held by Millis Development And Construction, LLC
- 2024-07-17: ROLAND HOME, Mount Pleasant: TXR1509RN, held by Stansell Construction, LLC
- 2024-07-17: DEER CREEK RANCH, Collin County: TXR1513RN, held by Lackland Collin County Development, LLC
- 2024-07-17: TRACTOR SUPPLY CO - 114TH ST & UNIVERSITY AVE, Lubbock: TXR1561RM, held by 7B Building and Development LLC
- 2024-07-17: LEMON CREEK, Boerne: TXR1562RM, held by AHC Construction, LLC
- 2024-07-17: VIDA TOWNHOMES 10.69 ACRE TRACT, San Antonio: TXR1564RM, held by CPS Energy
HUTOO SOUTH WWTP PHASE 1- 6MGD EXPANSION among its neighbors
111 discharge permits are in the Cottonwood Creek-Brushy Creek subwatershed (HUC 120702050404); TXR1505RN is one. Its county: 965, 17 major; TXR1505RN is minor permit.
Other permits in the Cottonwood Creek-Brushy Creek subwatershed (HUC 120702050404)
- 0914-05-204 CR 118 BRIDGE REPLACEMENT & NEW ROAD, Hutto: TXR1545QK, minor, term to 2028-03-04
- 0914-05-204 CR 118 BRIDGE REPLACEMENT & NEW ROAD, Hutto: TXR1590PJ, minor, term to 2028-03-04
- ALPHA FUEL C-STORE, Hutto: TXR1568TV, minor, term to 2028-03-04
- ALTA ED SCHMIDT APARTMENTS, Hutto: TXR1548TS, minor, term to 2028-03-04
- AUSTIN WOOD RECYCLING INC - HUTTO, Hutto: TXR05FW17, minor, term to 2026-08-13
- AVERY CENTRE EAST - PH 1 SEC 4 & 5, Round Rock: TXR1504NR, minor, term to 2028-03-04
- BLUFFS AT BLACKHAWK LIFT STATION AND FORCE MAINS, Hutto: TXR1575ZB, minor, term to 2028-03-04
- BLUFFS AT BLACKHAWK PHASES 1 2 3 AND 4, Hutto: TXR1568ZA, minor, term to 2028-03-04
- BLUFFS AT BLACKHAWK PHASES 1 2 3 AND 4, Hutto: TXR1576ZB, minor, term to 2028-03-04
- BRUSHY CREEK INDUSTRIAL PARK LOT 4C, Hutto: TXR1584QX, minor, term to 2028-03-04
What stands out
- Its term runs 3 years and 231 days, July 17, 2024 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | HUTOO SOUTH WWTP PHASE 1- 6MGD EXPANSION |
|---|---|
| Permittee | ARCHER WESTERN CONSTRUCTION, LLC |
| NPDES ID | TXR1505RN |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 17, 2024 |
| Expires | March 4, 2028 |
| Address | Hutto, TX 78634 |
| Receiving water | BRUSHY CREEK |
| Subwatershed | Cottonwood Creek-Brushy Creek (HUC 120702050404) |
NPDES TXR1505RN: effluent limits and exceedances
HUTOO SOUTH WWTP PHASE 1- 6MGD EXPANSION (NPDES TXR1505RN): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1505RN: no pollutant row on file.
NPDES TXR1505RN: inspections, violations and enforcement
NPDES TXR1505RN (HUTOO SOUTH WWTP PHASE 1- 6MGD EXPANSION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1505RN
NPDES TXR1505RN: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1505RN
NPDES TXR1505RN: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.