PECAN CREEK BRIDGE REPLACEMENT, Richmond, TX: NPDES TXR1509UT discharge permit, effluent exceedances, inspections, penalties
PECAN CREEK BRIDGE REPLACEMENT, Richmond, Texas: General permit coverage TXR1509UT, held by Mc2 Civil, LLC; Construction stormwater; Effective; issued May 28, 2025, term to March 4, 2028; discharges to UPPER OYSTER CREEK.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 13,624 were issued before TXR1509UT. Mc2 Civil, LLC holds 21 permits in Texas.
Other permits held by Mc2 Civil, LLC
- SHANNON PUMPING PLANT, Richmond: TXR1501XL, issued 2026-02-24
- ROLLOVER BAY PARK, Gilchrist: TXR1505WY, issued 2026-01-09
- HUFSMITH ROAD AT KUYKENDAHL INTERSECTION IMPRVTS, Houston: TXR1506WY, issued 2026-01-09
- WASHINGTON AVENUE ROADWAY IMPROVEMENTS-METRO, Houston: TXR1509UH, issued 2025-04-15
- GENERATION PARK SECTION 4, Houston: TXR1518ZA, issued 2026-07-31
- COH-NORTH CORRIDOR CONSOLIDATION PACKAGE 3, Houston: TXR1521XD, issued 2026-01-28
- NHCRWA PROJECT 35B, Houston: TXR1529VG, issued 2025-07-18
- SOUTH SHORE DRAINAGE PROJECT, Galveston: TXR1532UB, issued 2025-03-26
- HOU CSJ 0027-10-077, Houston: TXR1534TD, issued 2025-01-02
- NFBWA BELLAIRE PUMP STATION IMPROVEMENTS, Houston: TXR1534XS, issued 2026-03-23
Coverages issued nearest TXR1509UT
- 2025-05-27: THEODORA RESIDENCE, Willis: TXR1559US, held by Blackoak Homes LLC
- 2025-05-28: HICKORY RIDGE PHASE 2, San Antonio: TXR1501UT, held by M/I Homes Of San Antonio, LLC
- 2025-05-28: NTT TX-4 DATA CENTER, Garland: TXR1502UT, held by Structure Tone Southwest, LLC
- 2025-05-28: 50 AC HENDRICKS TRACT, Porter: TXR1504UT, held by Blazey Construction Services, LLC
- 2025-05-28: RAMBLE, Celina: TXR1507UT, held by S.Y.B. Construction Co., Inc.
- 2025-05-28: HUGHES LANDING, Dickinson: TXR1510UT, held by Scope28, LLC
- 2025-05-28: GRAND PRAIRIE SLX - COMMERCIAL, Grand Prairie: TXR1511UT, held by XS Construction, LLC
- 2025-05-28: BWSC RESERVOIR PROJECT - OYSTER CREEK IMPROVEMENTS, Brazoria County: TXR1512UT, held by Vernor Material & Equipment Co., Inc.
- 2025-05-28: BASTROP HIGH SCHOOL ADDITIONS & RENOVATION, Bastrop: TXR1513UT, held by American Constructors LLC
- 2025-05-28: DUININCK AMA004203047, Washburn: TXR1515UT, held by Duininck, Inc.
PECAN CREEK BRIDGE REPLACEMENT among its neighbors
194 discharge permits are in the Upper Oyster Creek subwatershed (HUC 120402050100); TXR1509UT is one. Its county: 1,100, 41 major; TXR1509UT is minor permit.
Other permits in the Upper Oyster Creek subwatershed (HUC 120402050100)
- ACCREDO PACKAGING, Sugar Land: TXRNEBU35, minor, term to 2026-08-13
- ALEXAN FULSHEAR, Fulshear: TXR1570WN, minor, term to 2028-03-04
- AMAZONCOM SERVICES HOU6, Richmond: TXR05FC07, minor, term to 2026-08-13
- ARBORETUM CRICKET COMPLEX, Sugar Land: TXR1561OU, minor, term to 2028-03-04
- BEECHNUT STREET PHASE 2, Richmond: TXR1571ZA, minor, term to 2028-03-04
- BELLFORT FARMS SECTION 2, Richmond: TXR1503MS, minor, term to 2028-03-04
- BELMONT ESTATES, Fulshear: TXR1520RU, minor, term to 2028-03-04
- BELMONT STATE, Fulshear: TXR1553YE, minor, term to 2028-03-04
- BLUE CREEK TRAILS DETENTION AND MASS GRADING, Richmond: TXR1563WI, minor, term to 2028-03-04
- BONTERA AT CROSS CREEK RANCH SECTION 10, Fulshear: TXR1507NW, minor, term to 2028-03-04
What stands out
- Its term runs 2 years and 281 days, May 28, 2025 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PECAN CREEK BRIDGE REPLACEMENT |
|---|---|
| Permittee | Mc2 Civil, LLC |
| NPDES ID | TXR1509UT |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | May 28, 2025 |
| Expires | March 4, 2028 |
| Address | Richmond, TX 77406 |
| Receiving water | UPPER OYSTER CREEK |
| Subwatershed | Upper Oyster Creek (HUC 120402050100) |
NPDES TXR1509UT: effluent limits and exceedances
PECAN CREEK BRIDGE REPLACEMENT (NPDES TXR1509UT): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1509UT: no pollutant row on file.
NPDES TXR1509UT: inspections, violations and enforcement
NPDES TXR1509UT (PECAN CREEK BRIDGE REPLACEMENT): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1509UT
NPDES TXR1509UT: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1509UT
NPDES TXR1509UT: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.