NPDES TXR1510VR · Clean Water Act
PUEBLO DE PALMAS PHASE 28, Mercedes, TX: NPDES TXR1510VR discharge permit, effluent exceedances, inspections, penalties
PUEBLO DE PALMAS PHASE 28, Mercedes, Texas: General permit coverage TXR1510VR, held by Nordhausen Utility Construction, LLC; Construction stormwater; Effective; issued August 26, 2025, term to March 4, 2028; discharges to LOWER LAGUNA MADRE.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 15,421 were issued before TXR1510VR. Nordhausen Utility Construction, LLC holds 7 permits in Texas.
Other permits held by Nordhausen Utility Construction, LLC
- SANTA CRUZ RANCHES NO 5, Monte Alto: TXR1502YI, issued 2026-05-20
- PUEBLO DE PALMAS PHASE 30, Elsa: TXR1511VR, issued 2025-08-26
- CITRUS PARK SUBDIVISION, Weslaco: TXR1516YE, issued 2026-05-06
- SUNFIELD MEADOWS SUBDIVISION, Edcouch: TXR1533YQ, issued 2026-06-22
- VISTA PALOMA, Mcallen: TXR1560YU, issued 2026-07-09
- MARAVILLAS ESTATES PHASE 4, Mercedes: TXR1594RN, issued 2024-07-22
Coverages issued nearest TXR1510VR
- 2025-08-26: PINEY WOODS SOLAR, Huntsville: TXR1505VR, held by Build Renewables, LLC
- 2025-08-26: LAKEHAVEN PH 8, Farmersville: TXR1506VR, held by Meritage Homes of Texas, LLC
- 2025-08-26: MULTI-TENANT RETAIL FACILITY, San Antonio: TXR1507VR, held by Sa Construct, LLC
- 2025-08-26: WEBB CO FAIRGROUNDS PROJECT PH 2 PKG 1, Laredo: TXR1508VR, held by Jerry Resendez Enterprises, Inc.
- 2025-08-26: MOUNTAIN BLUE, Keller: TXR1509VR, held by Steel & Silver LLC
- 2025-08-26: PUEBLO DE PALMAS PHASE 30, Elsa: TXR1511VR, held by Nordhausen Utility Construction, LLC
- 2025-08-26: BAYPORT RAIL TERMINAL, Pasadena: TXR1579VQ, held by W.T. Byler Co., LLC
- 2025-08-26: CORBET WATER SUPPLY, Corsicana: TXR1580VQ, held by Circle H Contractors, L.P.
- 2025-08-26: FIREFLY POINTE, Hutto: TXR1581VQ, held by Groundworks Ess, LLC
- 2025-08-26: RIVER BRIDGE RANCH, San Marcos: TXR1582VQ, held by Groundworks Ess, LLC
PUEBLO DE PALMAS PHASE 28 among its neighbors
44 discharge permits are in the Laguna Atascosa subwatershed (HUC 121102080800); TXR1510VR is one. Its county: 439, 16 major; TXR1510VR is minor permit.
Other permits in the Laguna Atascosa subwatershed (HUC 121102080800)
- 57 CONCRETE BATCH PLANT, San Benito: TXR1584NE, minor, term to 2028-03-04
- A TREJO, Mercedes: TXR05FQ86, minor, term to 2026-08-13
- ARROYO AQUACULTURE WWTF, Cameron County: TX0103811, major, term to 2017-06-01
- CAMERON COUNTY AIRPORT, Los Fresnos: TXR05GM33, minor, term to 2026-08-13
- CAMINO DE VERDAD SUBDIVISION PH 2, Weslaco: TXR1501OU, minor, term to 2028-03-04
- CIELO GRANDE SUBDIVISION, San Benito: TXR1569SR, minor, term to 2028-03-04
- CIELO VISTA SUBDIVISION, San Benito: TXR1550SO, minor, term to 2028-03-04
- CIELO VISTA SUBDIVISION, Los Fresnos: TXR1580YO, minor, term to 2028-03-04
- CITRUS PARK SUBDIVISION, Weslaco: TXR1516YE, minor, term to 2028-03-04
- COLONIA SEBASTIAN - WEST, Sebastian: TXR1541PP, minor, term to 2028-03-04
What stands out
- Its term runs 2 years and 191 days, August 26, 2025 to March 4, 2028.
- No dated event in the 365 days to October 14, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | PUEBLO DE PALMAS PHASE 28 |
|---|---|
| Permittee | Nordhausen Utility Construction, LLC |
| NPDES ID | TXR1510VR |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 26, 2025 |
| Expires | March 4, 2028 |
| Address | Mercedes, TX 78570 |
| Receiving water | LOWER LAGUNA MADRE |
| Subwatershed | Laguna Atascosa (HUC 121102080800) |
| SIC | 1623 – Water, Sewer, And Utility Lines |
NPDES TXR1510VR: effluent limits and exceedances
PUEBLO DE PALMAS PHASE 28 (NPDES TXR1510VR): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1510VR: no pollutant row on file.
NPDES TXR1510VR: inspections, violations and enforcement
NPDES TXR1510VR (PUEBLO DE PALMAS PHASE 28): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1510VR
NPDES TXR1510VR: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1510VR
NPDES TXR1510VR: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded October 14, 2026.