NPDES TXR1512VL · Clean Water Act
BASIN RANCH ENERGY CENTER, Barstow, TX: NPDES TXR1512VL discharge permit, effluent exceedances, inspections, penalties
BASIN RANCH ENERGY CENTER, Barstow, Texas: General permit coverage TXR1512VL, held by Gemma Power Systems, LLC; Construction stormwater; Effective; issued August 5, 2025, term to March 4, 2028; discharges to UPPER PECOS RIVER.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 15,012 were issued before TXR1512VL. Gemma Power Systems, LLC holds 4 permits in Texas.
Other permits held by Gemma Power Systems, LLC
- SANDOW LAKES ENERGY POWER PLANT I, Lexington: TXR1514UW, issued 2025-06-09
- VISTRA PERMIAN UNIT 11 & UNIT 12, Monahans: TXR1515WB, issued 2025-10-06
- CEDAR BAYOU 5 ELECTRIC GENERATING STATION, Baytown: TXR1529TQ, issued 2025-02-14
Coverages issued nearest TXR1512VL
- 2025-08-04: TRINITY RANCH - US HWY 290 AT SWENSON BLVD TURN LANE, Elgin: TXR1596VK, held by DNT Construction, LLC
- 2025-08-04: PORSCHE PLANO, Plano: TXR1597VK, held by Auto Company Vii, Inc.
- 2025-08-04: PROMINENCE, San Antonio: TXR1598VK, held by Highland Homes-San Antonio, LLC
- 2025-08-04: TEXAS REHABILITATION HOSPITAL PLANO RENOVATION, Plano: TXR1599VK, held by HOAR Construction, LLC
- 2025-08-05: NORTHLAKE - PHASE 7, San Antonio: TXR1511VL, held by Lennar Homes of Texas Land and Construction, Ltd.
- 2025-08-05: GROSENBACHER ROAD DUPLEX, San Antonio: TXR1513VL, held by Invest 5S
- 2025-08-05: SOLA VISTA - HB, Spicewood: TXR1514VL, held by Continental Homes Of Texas, L.P.
- 2025-08-05: MAVERICK RANCH ESTATES, Van Alstyne Etj: TXR1515VL, held by Dreamline Cold Springs LLC
- 2025-08-05: BRIGGS RANCH EAST PHASE 1 UNIT 1, San Antonio: TXR1516VL, held by Weekley Homes, LLC
- 2025-08-05: VILLAGE SOUTH SUBDIVISION PHASE 2, Laredo: TXR1517VL, held by Gallegos Paving LLC
BASIN RANCH ENERGY CENTER among its neighbors
2 discharge permits are in the Barstow Canal-Pecos River subwatershed (HUC 130700010705); TXR1512VL is one. Its county: 19, 0 major; TXR1512VL is minor permit.
Other permits in the Barstow Canal-Pecos River subwatershed (HUC 130700010705)
- RIVERTON - SAND LAKE 138 KV LINE, Pecos: TXR1568WD, minor, term to 2028-03-04
What stands out
- Its term runs 2 years and 212 days, August 5, 2025 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | BASIN RANCH ENERGY CENTER |
|---|---|
| Permittee | Gemma Power Systems, LLC |
| NPDES ID | TXR1512VL |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 5, 2025 |
| Expires | March 4, 2028 |
| Address | Barstow, TX 79719 |
| Receiving water | UPPER PECOS RIVER |
| Subwatershed | Barstow Canal-Pecos River (HUC 130700010705) |
NPDES TXR1512VL: effluent limits and exceedances
BASIN RANCH ENERGY CENTER (NPDES TXR1512VL): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1512VL: no pollutant row on file.
NPDES TXR1512VL: inspections, violations and enforcement
NPDES TXR1512VL (BASIN RANCH ENERGY CENTER): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1512VL
NPDES TXR1512VL: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1512VL
NPDES TXR1512VL: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.