NPDES TXR1514LZ · Clean Water Act
WOODLAND OAKS PHASE III, Harlingen, TX: NPDES TXR1514LZ discharge permit, effluent exceedances, inspections, penalties
WOODLAND OAKS PHASE III, Harlingen, Texas: General permit coverage TXR1514LZ, held by La Feria Excavation, Inc.; Construction stormwater; Administratively continued; issued March 1, 2023, term to March 5, 2023; discharges to LAGUNA MADRE.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 877 were issued before TXR1514LZ. La Feria Excavation, Inc. holds 9 permits in Texas.
Other permits held by La Feria Excavation, Inc.
- BAHIA POINT PHASE IV, Laguna Heights: TXR1519UZ, issued 2025-06-20
- STANFORD CROSSING, Los Fresnos: TXR1535ZF, issued 2026-08-21
- RABB RANCH PHASE I, La Feria: TXR1542TV, issued 2025-03-04
- FALCONS LANDING, Los Fresnos: TXR1558WS, issued 2025-12-12
- RESACA DEL MONTE PHASE 3 & 4, San Benito: TXR1582NA, issued 2023-06-05
- RABB RANCH PHASE II, La Feria: TXR1586YP, issued 2026-06-19
- HCISD SAC CAMPUS, Harlingen: TXR1592ND, issued 2023-06-12
- BAHIA POINT PHASE III, Laguna Heights: TXR1594QO, issued 2024-04-17
Coverages issued nearest TXR1514LZ
- 2023-03-01: 10264 BLACKENHURST, Frisco: TXR1509LZ, held by Powell and Moon Investments LLC
- 2023-03-01: KALIDAD II SUBDIVISION, Penitas: TXR1510LZ, held by 2Gs, LLC Dba Earthworks Enterprise
- 2023-03-01: GRANITE CONSTRUCTION, Rosharon: TXR1511LZ, held by Granite Construction Company
- 2023-03-01: SPACIOUS BAY, Port Isabel: TXR1512LZ, held by Rhyner Construction Services, Inc.
- 2023-03-01: THE VALLEY AT GREAT HILLS, Copperas Cove: TXR1513LZ, held by Dale Cannon
- 2023-03-01: QUIKTRIP STORE 7943, Beaumont: TXR1515LZ, held by Cissell Mueller Construction, Inc.
- 2023-03-01: THE ENCLAVE AT LAKE BELTON, Belton: TXR1516LZ, held by K & R Flanigan Construction, LLC
- 2023-03-01: PHASE 1 DETENTION FOR ROYAL PINES, Porter: TXR1517LZ, held by Lonnie Lischka Company, L.P.
- 2023-03-01: J FRANK DOBIE HIGH SCHOOL FOOTBALL FIELD SYNTHETIC TURF, Houston: TXR1518LZ, held by Hellas Construction, Inc.
- 2023-03-01: ELYSON EXCHANGE RETAIL CENTER, Cypress: TXR1520LZ, held by Lagrone Services, Ltd.
WOODLAND OAKS PHASE III among its neighbors
81 discharge permits are in the Line V Canal-Arroyo Colorado subwatershed (HUC 121102080700); TXR1514LZ is one.
Other permits in the Line V Canal-Arroyo Colorado subwatershed (HUC 121102080700)
- ALAMO CONCRETE PRODUCTS HARLINGEN PIPE PLANT 2600, Harlingen: TXR05FN09, minor, term to 2026-08-13
- ALAMO CONCRETE PRODUCTS PLANT 86, Harlingen: TXG110938, minor, term to 2021-11-07
- ALTAS PALMAS PHASE I, Harlingen: TXR1569WN, minor, term to 2028-03-04
- ARMED FORCES RESERVE TRAINING CENTER, Harlingen: TXRNEBT65, minor, term to 2026-08-13
- ARROYO BESS, Harlingen: TXR1547SH, minor, term to 2028-03-04
- BRAZIL ESTATES, Harlingen: TXR1501SK, minor, term to 2028-03-04
- CAMERON COUNTY DRAINAGE DISTRICT 5 MS4, Harlingen: TXR040243, minor, term to 2024-01-23
- CAMPEROS NO 1, San Benito: TXR1534RC, minor, term to 2028-03-04
- CARRIAGE HILLS SUBDIVISION, Abilene: TXR1545NK, minor, term to 2028-03-04
- CHICK-FIL-A - SAN BENITO TX 5787, San Benito: TXR1530TY, minor, term to 2028-03-04
What stands out
- Its term runs 4 days, March 1, 2023 to March 5, 2023; the term ended 1,290 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | WOODLAND OAKS PHASE III |
|---|---|
| Permittee | La Feria Excavation, Inc. |
| NPDES ID | TXR1514LZ |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 1, 2023 |
| Expires | March 5, 2023 |
| Address | Harlingen, TX 78552 |
| Receiving water | LAGUNA MADRE |
| Subwatershed | Line V Canal-Arroyo Colorado (HUC 121102080700) |
NPDES TXR1514LZ: effluent limits and exceedances
WOODLAND OAKS PHASE III (NPDES TXR1514LZ): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1514LZ: no pollutant row on file.
NPDES TXR1514LZ: inspections, violations and enforcement
NPDES TXR1514LZ (WOODLAND OAKS PHASE III): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1514LZ
NPDES TXR1514LZ: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1514LZ
NPDES TXR1514LZ: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.