NPDES TXR15157X · Clean Water Act
DEL BELLO LAKES PHASE, Manvel, TX: NPDES TXR15157X discharge permit, effluent exceedances, inspections, penalties
DEL BELLO LAKES PHASE, Manvel, Texas: General permit coverage TXR15157X, held by Sonora SWQM Co.; Construction stormwater; Administratively continued; issued May 1, 2019, term to March 4, 2023; discharges to MUSTANG BAYOU.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 261 were issued before TXR15157X. Sonora SWQM Co. holds 19 permits in Texas.
Other permits held by Sonora SWQM Co.
- BRIDGELAND PHASE 6B, Cypress: TXR1504RS, issued 2024-08-06
- TAMARRON PHASE IX PHASE 1, Fulshear: TXR1507OJ, issued 2023-09-14
- SAMARA PHASE 4 DETENTION, League City: TXR1509WF, issued 2025-10-22
- GEORGETOWN DETENTION BASIN PHASE 1, Alvin: TXR1514OJ, issued 2023-09-14
- BRIDGELAND PHASE 8 DETENTION AND SPOIL DISPOSAL, Cypress: TXR1518MR, issued 2023-05-02
- UPPER LANGHAM CREEK PHASE 3, Cypress: TXR1526YR, issued 2026-06-25
- FULSHEAR RANCH, Richmond: TXR1528VY, issued 2025-09-24
- BRIDGELAND PHASE 9, Cypress: TXR1531NT, issued 2023-07-26
- EDGEWOOD VILLAGE EAST SUBDIVISION DETENTION PH4, Sheldon: TXR1535SY, issued 2024-12-06
- PHASE II DETENTION TO SERVE PECAN RANCH, Village Of Bonney: TXR1536YR, issued 2026-06-25
Coverages issued nearest TXR15157X
- 2019-05-01: HOU CSJ 0177-14-010, Kingwood: TXR15151X, held by ISI Contracting, Inc.
- 2019-05-01: ANDRETTI INDOOR KARTING AND GAMES, Katy: TXR15152X, held by Slack & Co. Contracting, Inc.
- 2019-05-01: NAVARRO OAKS UNITS 1 AND 2, Seguin: TXR15153X, held by Continental Homes Of Texas, L.P.
- 2019-05-01: VISTA RIDGE, Live Oak: TXR15154X, held by Ashton San Antonio Residential, L.L.C.
- 2019-05-01: ASCENSION SETON HEALTH CENTER - ELGIN, Elgin: TXR15156X, held by Chapman Mcdonald Constructors LLC
- 2019-05-01: MANCHACA FAMILY APARTMENTS, Austin: TXR15162X, held by Xpert Design And Construction, LLC
- 2019-05-01: BRIDGELAND DEVELOPMENT, Cypress: TXR15163X, held by Bridgeland Development, LP
- 2019-05-01: UVALDE MEMORIAL HOSPITAL, Uvalde: TXR15165X, held by HOAR Construction, LLC
- 2019-05-01: HOWARD PEAK GREENWAY ROGERS RANCH SEGMENT, San Antonio: TXR15166X, held by Dutch Construction
- 2019-05-01: AISD - LEE ELEMENTARY SCHOOL CLASSROOM BUILDING, Austin: TXR15167X, held by Hcs Inc. Commercial General Contractor
DEL BELLO LAKES PHASE among its neighbors
288 discharge permits are in the Mustang Bayou subwatershed (HUC 120402040400); TXR15157X is one.
Other permits in the Mustang Bayou subwatershed (HUC 120402040400)
- 2006 MUSTANG CREEK DEVELOPMENT WWTP, Manvel: TXR1519OF, minor, term to 2028-03-04
- AAA STORAGE FM 521, Rosharon: TXR1522TW, minor, term to 2028-03-04
- AGUA ESTATES SUBDIVISION, Houston: TXR1585OK, minor, term to 2028-03-04
- ALAMO CONCRETE PRODUCTS, Iowa Colony: TXG113212, minor, term to 2026-11-06
- ALLDAY AUTO PARTS, Houston: TXR05GF67, minor, term to 2026-08-13
- ALLIED PETROCHEMICAL TEXAS, Alvin: TXR05FY24, minor, term to 2026-08-13
- ALVIN 1460 AC TRACT WWTP, Alvin: TX0147141
- ALVIN 350 WWTP, Alvin: TX0147761, minor, term to 2031-05-04
- ALVIN CHEMICAL, Alvin: TXRNECK50, minor, term to 2026-08-13
- ALVIN HIGH SCHOOL EXPANSION & RENOVATIONS, Alvin: TXR1554YD, minor, term to 2028-03-04
What stands out
- Its term runs 3 years and 307 days, May 1, 2019 to March 4, 2023; the term ended 1,291 days before EPA's file was loaded on September 15, 2026, and the file lists the permit as administratively continued.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | DEL BELLO LAKES PHASE |
|---|---|
| Permittee | Sonora SWQM Co. |
| NPDES ID | TXR15157X |
| Status | Administratively continued |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | May 1, 2019 |
| Expires | March 4, 2023 |
| Address | Manvel, TX 77578 |
| Receiving water | MUSTANG BAYOU |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Mustang Bayou (HUC 120402040400) |
NPDES TXR15157X: effluent limits and exceedances
DEL BELLO LAKES PHASE (NPDES TXR15157X): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR15157X: no pollutant row on file.
NPDES TXR15157X: inspections, violations and enforcement
NPDES TXR15157X (DEL BELLO LAKES PHASE): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR15157X
NPDES TXR15157X: one email when its EPA record changes — $99/month.
Permits near NPDES TXR15157X
NPDES TXR15157X: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.