NPDES TXR1515YF · Clean Water Act
ANAQUA AT TRES LAGOS SUBDIVISION PH II, Mcallen, TX: NPDES TXR1515YF discharge permit, effluent exceedances, inspections, penalties
ANAQUA AT TRES LAGOS SUBDIVISION PH II, Mcallen, Texas: General permit coverage TXR1515YF, held by PEGA JPS UTILITIES, LLC; Construction stormwater; Effective; issued May 11, 2026, term to March 4, 2028; discharges to DRAINAGE DITCHES FLOWING INTO LOWER LAGUNA MADRE.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 20,976 were issued before TXR1515YF. PEGA JPS UTILITIES, LLC holds 10 permits in Texas.
Other permits held by PEGA JPS UTILITIES, LLC
- HARVEST COVE SUBDIVISION PH I, Mcallen: TXR1535PY, issued 2024-02-16
- EMRY APARTMENTS SUBDIVISION, Mcallen: TXR1541ZC, issued 2026-08-10
- WARE HOTEL GROUP SUBDIVISION, Mcallen: TXR1546XT, issued 2026-03-26
- SAKS INDUSTRIAL SUBDIVISION, Edinburg: TXR1550WE, issued 2025-10-20
- LAS BRISAS SUBDIVISION PH II, Mcallen: TXR1557YG, issued 2026-05-14
- VILLAS AT LAS LAGUNAS PH I SUBDIVISION, Brownsville: TXR1562WU, issued 2025-12-19
- SAPPHIRE AT LA SIENNA PH I SUBDIVISION, Edinburg: TXR1594TV, issued 2025-03-05
- SUMMERLIN SUBDIVISION LIFT STATION, Weslaco: TXR1596ZG, issued 2026-08-27
- MONTE CRISTO COMMERCIAL PLAZA, Edinburg: TXR1599ZF, issued 2026-08-25
Coverages issued nearest TXR1515YF
- 2026-05-11: HARRIS CO MUD 390 SHEILA JACKSON LEE ADMIN BLDG, Houston: TXR1508YF, held by Teal Construction Company
- 2026-05-11: MAVERICK FARMS PHS 1, Pilot Point: TXR1511YF, held by Atmos Energy Corporation
- 2026-05-11: LONE OAK PHS 2, Alvarado: TXR1512YF, held by Atmos Energy Corporation
- 2026-05-11: BECK AND MASTEN KIA PHASE 2, Tomball: TXR1513YF, held by Spd Construction, LLC
- 2026-05-11: GRIMES & EMILY PARK RENOVATIONS, La Porte: TXR1514YF, held by Stonewall Constructors
- 2026-05-11: CHAMBERS CREEK WATERSHED, Grandview: TXR1516YF, held by Bms Contracting, LLC
- 2026-05-11: MESQUITE TRAILS SUBDIVISION, Brownsville: TXR1517YF, held by Fluxcap LLC
- 2026-05-11: ADDITIONS TO TECH SERVE, Tyler: TXR1518YF, held by Paragon Construction And Associates, LLC
- 2026-05-11: OAK HILLS MONTGOMERY NORTH SEC 1, Montgomery: TXR1520YF, held by Texas Kb Utilities, LLC
- 2026-05-11: COBBLESTONE SECTION 4, Texas City: TXR1521YF, held by CrosTex Construction, Inc.
ANAQUA AT TRES LAGOS SUBDIVISION PH II among its neighbors
56 discharge permits are in the Lake Edinburn-Edinburg North Main Canal subwatershed (HUC 121102080200); TXR1515YF is one. Its county: 439, 16 major; TXR1515YF is minor permit.
Other permits in the Lake Edinburn-Edinburg North Main Canal subwatershed (HUC 121102080200)
- 107 TRAILER PARK, Alton: TXR1570WP, minor, term to 2028-03-04
- 7.5 ACRES ON 6112 N MOORFIELD RD, Alton: TXR1546XX, minor, term to 2028-03-04
- ALTON SCRAP METAL, Alton: TXR05FM68, minor, term to 2026-08-13
- BARISTA SS, Mccook: TXR1536RT, minor, term to 2028-03-04
- BH READY MIX, Mission: TXG113868, minor, term to 2026-11-06
- BROWNWOOD PHASE 3 SUBDIVISION, Edinburg: TXR1513OA, minor, term to 2028-03-04
- BRYAN PARK SUBDIVISION, Alton: TXR1544WM, minor, term to 2028-03-04
- CALPINE HIDALGO ENERGY CENTER, Edinburg: TX0119423, major, term to 2020-07-01
- CARDINAL LANDING SUBDIVISION, Alton: TXR1578VR, minor, term to 2028-03-04
- CRM MISSION HOLDINGS, Mission: TXR05FG91, minor, term to 2026-08-13
What stands out
- Its term runs 1 year and 298 days, May 11, 2026 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | ANAQUA AT TRES LAGOS SUBDIVISION PH II |
|---|---|
| Permittee | PEGA JPS UTILITIES, LLC |
| NPDES ID | TXR1515YF |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | May 11, 2026 |
| Expires | March 4, 2028 |
| Address | Mcallen, TX 78504 |
| Receiving water | DRAINAGE DITCHES FLOWING INTO LOWER LAGUNA MADRE |
| Subwatershed | Lake Edinburn-Edinburg North Main Canal (HUC 121102080200) |
NPDES TXR1515YF: effluent limits and exceedances
ANAQUA AT TRES LAGOS SUBDIVISION PH II (NPDES TXR1515YF): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1515YF: no pollutant row on file.
NPDES TXR1515YF: inspections, violations and enforcement
NPDES TXR1515YF (ANAQUA AT TRES LAGOS SUBDIVISION PH II): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1515YF
NPDES TXR1515YF: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1515YF
NPDES TXR1515YF: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.