NPDES TXR1516PA · Clean Water Act
BARRETT STATION PHASE 1, Crosby, TX: NPDES TXR1516PA discharge permit, effluent exceedances, inspections, penalties
BARRETT STATION PHASE 1, Crosby, Texas: General permit coverage TXR1516PA, held by C.E. Barker,ltd.; Construction stormwater; Effective; issued November 13, 2023, term to March 4, 2028; discharges to RICKETT CREEK.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 4,745 were issued before TXR1516PA.
Coverages issued nearest TXR1516PA
- 2023-11-13: FRENSHIP ESTATES, Lubbock: TXR1501PA, held by Greystone Homes, LLC
- 2023-11-13: CAMPUS INDUSTRIAL PARK, Fort Worth: TXR1505PA, held by Tll Construction Group, LLC
- 2023-11-13: ARCADIA TRAILS PHASE 2 BP AND PAVING, Balch Springs: TXR1506PA, held by Glenn Thurman, Inc.
- 2023-11-13: SQUAW VALLEY MEADOWS, Glen Rose: TXR1512PA, held by Kickin' A Inc.
- 2023-11-13: KEYSTONE PLAZA, San Juan: TXR1515PA, held by Keystone Plaza
- 2023-11-13: HWY 90 & MONTGOMERY TRACT, San Antonio: TXR1518PA, held by V. K. Knowlton Construction and Utilities, Inc.
- 2023-11-13: HILLSIDE VILLAGE, Celina: TXR1519PA, held by Shaddock Homes, Ltd.
- 2023-11-13: EASTON PARK 1B LOT 4A-3 PARK, Austin: TXR1520PA, held by Adventures Outback L.P.
- 2023-11-13: SADDLE CREEK ADDITION, Waco: TXR1584OZ, held by Capital M Construction LLC
- 2023-11-13: HOU CSJ 252303-014, Santa Fe: TXR1585OZ, held by Texas Department of Transportation
BARRETT STATION PHASE 1 among its neighbors
108 discharge permits are in the Jackson Bayou-San Jacinto River subwatershed (HUC 120401040704); TXR1516PA is one. Its county: 4,455, 195 major; TXR1516PA is minor permit.
Other permits in the Jackson Bayou-San Jacinto River subwatershed (HUC 120401040704)
- ALTIVIA OXIDE CHEMICALS PLANT, Crosby: TX0095559, minor, term to 2023-09-18
- AMERICAN STEEL PIPE FABRICATION, Crosby: TXR05GM94, minor, term to 2026-08-13
- ASPHALT PACKAGE 2023 - 2 - 23103MF2WQ01, Crosby: TXR1582OF, minor, term to 2028-03-04
- ASPHALT PACKAGE 2023 - 2 - 23103MF2WQ01, Crosby: TXR1594OE, minor, term to 2028-03-04
- BARRET CROSSING SUBDIVISION, Crosby: TXR1536YS, minor, term to 2028-03-04
- BARRET STREET DEDICATION PAVING BRIDGE, Crosby: TXR1564NF, minor, term to 2028-03-04
- BARRETT CROSSING AT SWEETGRASS VILLAGE - HOME BUILDING, Crosby: TXR1549PO, minor, term to 2028-03-04
- BARRETT CROSSING LIFT STATION, Crobsy: TXR1567MG, minor, term to 2028-03-04
- BARRETT CROSSING STREET DEDICATION SEC 1, Crosby: TXR1582LZ, minor, term to 2028-03-04
- BARRETT STATION PHASE 1 - DREAMLAND PLACE, Barrett: TXR1573PK, minor, term to 2028-03-04
What stands out
- Its term runs 4 years and 112 days, November 13, 2023 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | BARRETT STATION PHASE 1 |
|---|---|
| Permittee | C.E. Barker,ltd. |
| NPDES ID | TXR1516PA |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 13, 2023 |
| Expires | March 4, 2028 |
| Address | Crosby, TX 77532 |
| Receiving water | RICKETT CREEK |
| Subwatershed | Jackson Bayou-San Jacinto River (HUC 120401040704) |
NPDES TXR1516PA: effluent limits and exceedances
BARRETT STATION PHASE 1 (NPDES TXR1516PA): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1516PA: no pollutant row on file.
NPDES TXR1516PA: inspections, violations and enforcement
NPDES TXR1516PA (BARRETT STATION PHASE 1): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1516PA
NPDES TXR1516PA: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1516PA
NPDES TXR1516PA: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.