NPDES TXR1518SB · Clean Water Act
INDIGO ULTIMATE DETENTION, Richmond, TX: NPDES TXR1518SB discharge permit, effluent exceedances, inspections, penalties
INDIGO ULTIMATE DETENTION, Richmond, Texas: General permit coverage TXR1518SB, held by SERCO Construction Group, Ltd.; Construction stormwater; Effective; issued September 9, 2024, term to March 4, 2028; discharges to 1245C.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 8,994 were issued before TXR1518SB. SERCO Construction Group, Ltd. holds 10 permits in Texas.
Other permits held by SERCO Construction Group, Ltd.
- 230042 DRAINAGE IMPROVEMENTS IN THE CEDAR BAYOU, Baytown: TXR1502NG, issued 2023-06-15
- KLEB WOODS STORMWATER DETENTION BASIN PHASE 2, Tomball: TXR1506NG, issued 2023-06-15
- DRAINAGE IMPROVEMENTS IN PATTON VILLAGE, Patton Village: TXR1515PN, issued 2024-01-10
- RABBS BAYOU DETENTION POND FOR CITY OF ROSENBERG, Rosenberg: TXR1519VU, issued 2025-09-08
- BIG SANDY CREEK WATER RETARDING STRUCTURE NO43, Rhome: TXR1538UM, issued 2025-05-05
- CEDAR BAYOU PARK EAST AND WEST SUBDIVISION, Baytown: TXR1565NW, issued 2023-08-04
- JOB NO 220148 ADDICKS WATERSHED REPAIR PACKAGE 1, Cypress: TXR1590NF, issued 2023-06-15
- BCMUD NO 57 MERIDIANA SECTION 82 DETENTION RESERV, Manvel: TXR1593SS, issued 2024-11-14
- DITCH B & B1 IMPROVEMENTS FOR FBCLID2, Sugarland: TXR1595NF, issued 2023-06-15
Coverages issued nearest TXR1518SB
- 2024-09-09: TXDOT BWD 0480-07-014, Richland Springs: TXR1507SB, held by Texas Department of Transportation
- 2024-09-09: FM 1093, Richmond: TXR1508SB, held by Thakkar Development Company LLC
- 2024-09-09: SYNOVA SECTION ONE, Crosby: TXR1509SB, held by Fellers & Clark, LP
- 2024-09-09: RINCON INDUSTRIAL PARK, Corpus Christi: TXR1510SB, held by Port Of Corpus Christi Authority Of Nueces County
- 2024-09-09: ALAMAR, San Antonio: TXR1517SB, held by Alamar Sa, LLC
- 2024-09-09: SILVERTHORNE PHASE II, Conroe: TXR1520SB, held by Clearx, LLC
- 2024-09-09: STARK FARMS PHASE 3, Denton: TXR1521SB, held by Beazer Homes Texas, L.P.
- 2024-09-09: THE GROVES OFFICE CONDOS, Atascocita: TXR1522SB, held by Total Site, Inc.
- 2024-09-09: WALSH RANCH PHASES 5A 5B 5C 5D 6A AND 6B, Fort Worth: TXR1524SB, held by Quail Valley Land Company, LLC
- 2024-09-09: WANDERING CREEK AT BROOKHOLLOW, Prosper: TXR1527SB, held by Toll Bros., Inc.
INDIGO ULTIMATE DETENTION among its neighbors
111 discharge permits are in the Rabbs Bayou-Brazos River subwatershed (HUC 120701040402); TXR1518SB is one. Its county: 1,100, 41 major; TXR1518SB is minor permit.
Other permits in the Rabbs Bayou-Brazos River subwatershed (HUC 120701040402)
- ABHIAN PROPERTIES, Sugar Land: TXR15502Y, minor, term to 2023-03-04
- BRAZOS REGIONAL TREATMENT FACILITIES MG & D, Richmond: TXR1593WM, minor, term to 2028-03-04
- BRAZOS RIVER BANK STABILIZATION PROJECT, Sugarland: TXR1559OU, minor, term to 2028-03-04
- BRYAN ROAD MANAGEMENT, Richmond: TXR1534YZ, minor, term to 2028-03-04
- BULLHEAD SLOUGH IMPROVEMENTS AT US 90A AND SH 99, Sugarland: TXR1567YO, minor, term to 2028-03-04
- CHECKOUT 85, Richmond: TXR1572WY, minor, term to 2028-03-04
- CIRCLE OAK, Richmond: TXR1538XV, minor, term to 2028-03-04
- CIRCLE OAK PH 3 DETENTION DRAINAGE & MITIGATION IMPROVEMEN, Richmond: TXR1593YV, minor, term to 2028-03-04
- CIRCLE OAK SUBDIVISION, Richmond: TXR1551QG, minor, term to 2028-03-04
- CITY OF RICHMOND MS4, Richmond: TXR040589, minor, term to 2024-01-23
What stands out
- Its term runs 3 years and 177 days, September 9, 2024 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | INDIGO ULTIMATE DETENTION |
|---|---|
| Permittee | SERCO Construction Group, Ltd. |
| NPDES ID | TXR1518SB |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | September 9, 2024 |
| Expires | March 4, 2028 |
| Address | Richmond, TX 77406 |
| Receiving water | 1245C |
| Subwatershed | Rabbs Bayou-Brazos River (HUC 120701040402) |
NPDES TXR1518SB: effluent limits and exceedances
INDIGO ULTIMATE DETENTION (NPDES TXR1518SB): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1518SB: no pollutant row on file.
NPDES TXR1518SB: inspections, violations and enforcement
NPDES TXR1518SB (INDIGO ULTIMATE DETENTION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1518SB
NPDES TXR1518SB: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1518SB
NPDES TXR1518SB: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.