NPDES TXR1525TH · Clean Water Act
ENTRADA PHASE 3, Westlake, TX: NPDES TXR1525TH discharge permit, effluent exceedances, inspections, penalties
ENTRADA PHASE 3, Westlake, Texas: General permit coverage TXR1525TH, held by Evp Phase Iii, LLC; Construction stormwater; Effective; issued January 15, 2025, term to March 4, 2028; discharges to KIRKWOOD BRANCH.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 11,017 were issued before TXR1525TH.
Coverages issued nearest TXR1525TH
- 2025-01-15: ORLANDO RESIDENCE, Bullard: TXR1518TH, held by Mccoy Custom Homes
- 2025-01-15: TXDOT FTW JOHNSON CSJ 118102045, Joshua: TXR1519TH, held by Ed Bell Construction Company
- 2025-01-15: RED OAK CREEK RELIEF INTERCEPTOR SEGMENT RO-3, Ovilla: TXR1520TH, held by BRCT LLC
- 2025-01-15: COLINA RANCH - UNIT 1 EMBANKMENT, New Braunfels: TXR1521TH, held by SACC, Inc.
- 2025-01-15: NORTH GARLAND SYSTEM GROUND STORAGE TANK, Garland: TXR1524TH, held by Felix Construction Company
- 2025-01-15: TOY BOX STORAGE, Hockley: TXR1526TH, held by KEETON CONTRACT SERVICES, INC.
- 2025-01-15: PREFERRED MATERIALS DEVELOPMENT, Howe: TXR1527TH, held by Preferred Materials, LLC
- 2025-01-15: HOU CSJ 0912-72-541, Webster: TXR1528TH, held by SER Construction Partners, LLC
- 2025-01-15: HARRIS HEALTH HOLLY HALL OPERATIONS CENTER, Houston: TXR1530TH, held by Skanska USA Building Inc.
- 2025-01-15: WESTRIDGE PH 2 & AMENITY CENTER, Princeton: TXR1531TH, held by Brightland Homes, Ltd.
ENTRADA PHASE 3 among its neighbors
71 discharge permits are in the Marshall Branch-Grapevine Lake subwatershed (HUC 120301040305); TXR1525TH is one. Its county: 1,661, 7 major; TXR1525TH is minor permit.
Other permits in the Marshall Branch-Grapevine Lake subwatershed (HUC 120301040305)
- 0081-03-048 DCAO, Roanoak: TXR1556CH, minor, term to 2023-03-04
- 104 LA RAMBLA, Southlake: TXR1547YT, minor, term to 2028-03-04
- 1821 JUBILEE LANE, Southlake: TXR1565YY, minor, term to 2028-03-04
- 1901 LA MAISON PLACE FLOWER MOUND TX, Flower Mound: TXR1510VN, minor, term to 2028-03-04
- 208 LA RAMBLA CT OUT OF CARILLON PARC, Southlake: TXR1552WI, minor, term to 2028-03-04
- 212 MURANO PLACE, Southlake: TXR1550WI, minor, term to 2028-03-04
- 4408 OVERLOOK RIDGE FLOWER MOUND TX, Flower Mound: TXR1523TU, minor, term to 2028-03-04
- 4509 SADDLEBACK LANE, Southlake: TXR1538NR, minor, term to 2028-03-04
- 4605 SADDLEBACK LN, Southlake: TXR1588SZ, minor, term to 2028-03-04
- ALLIANCE GATEWAY 34, Fort Worth: TXR1545VG, minor, term to 2028-03-04
What stands out
- Its term runs 3 years and 49 days, January 15, 2025 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | ENTRADA PHASE 3 |
|---|---|
| Permittee | Evp Phase Iii, LLC |
| NPDES ID | TXR1525TH |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | January 15, 2025 |
| Expires | March 4, 2028 |
| Address | Westlake, TX 76262 |
| Receiving water | KIRKWOOD BRANCH |
| Subwatershed | Marshall Branch-Grapevine Lake (HUC 120301040305) |
NPDES TXR1525TH: effluent limits and exceedances
ENTRADA PHASE 3 (NPDES TXR1525TH): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1525TH: no pollutant row on file.
NPDES TXR1525TH: inspections, violations and enforcement
NPDES TXR1525TH (ENTRADA PHASE 3): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1525TH
NPDES TXR1525TH: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1525TH
NPDES TXR1525TH: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.