NPDES TXR1527WO · Clean Water Act
TUSCANY HILLS SUBDIVISION PHASE I, Harlingen, TX: NPDES TXR1527WO discharge permit, effluent exceedances, inspections, penalties
TUSCANY HILLS SUBDIVISION PHASE I, Harlingen, Texas: General permit coverage TXR1527WO, held by Solid Development Inc.; Construction stormwater; Effective; issued November 24, 2025, term to March 4, 2028; discharges to CAMERON COUNTY DRAINAGE DISTRICT NO 5.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 17,233 were issued before TXR1527WO.
Coverages issued nearest TXR1527WO
- 2025-11-24: MUSTANG RIDGE LOGISTICS CENTER - PHASE 1, Mustang Ridge: TXR1520WO, held by Raymond Construction Co., Inc.
- 2025-11-24: CROSSROADS 287, Waxahachie: TXR1521WO, held by Birch Contracting, LLC
- 2025-11-24: ALIEF ISD LEROY CRUMP STADIUM, Houston: TXR1522WO, held by DivisionOne Construction LLC
- 2025-11-24: REDWOOD SQUARE SUBDIVISION, Hidalgo: TXR1523WO, held by Redwood Square Subdivision LLC
- 2025-11-24: HIGH MEADOW WEST - 25178 CHISOS BEND - HOME BUILDING, Montgomery: TXR1524WO, held by Oak Point Homes LLC
- 2025-11-24: PECAN BRANCH WWTP, Georgetown: TXR1528WO, held by Matous Construction II, LTD.
- 2025-11-24: MAJESTIC OAKS SUBDIVISION, Nacogdoches: TXR1529WO, held by WESLEY MARIO
- 2025-11-24: MCALLEN LATERAL DRAIN IMPROVEMENTS, Mcallen: TXR1531WO, held by E-Con Group LLC
- 2025-11-24: MUSTANG MEADOWS - HOME BUILDING, Waller: TXR1532WO, held by Bsr Properties LLC
- 2025-11-24: MCCARTY LANE TO STRAHAN TL OVERHAUL, San Marcos: TXR1533WO, held by Seed Build And Civil Construction, LLC
TUSCANY HILLS SUBDIVISION PHASE I among its neighbors
81 discharge permits are in the Line V Canal-Arroyo Colorado subwatershed (HUC 121102080700); TXR1527WO is one. Its county: 327, 11 major; TXR1527WO is minor permit.
Other permits in the Line V Canal-Arroyo Colorado subwatershed (HUC 121102080700)
- ALAMO CONCRETE PRODUCTS HARLINGEN PIPE PLANT 2600, Harlingen: TXR05FN09, minor, term to 2026-08-13
- ALAMO CONCRETE PRODUCTS PLANT 86, Harlingen: TXG110938, minor, term to 2021-11-07
- ALTAS PALMAS PHASE I, Harlingen: TXR1569WN, minor, term to 2028-03-04
- ARMED FORCES RESERVE TRAINING CENTER, Harlingen: TXRNEBT65, minor, term to 2026-08-13
- ARROYO BESS, Harlingen: TXR1547SH, minor, term to 2028-03-04
- BRAZIL ESTATES, Harlingen: TXR1501SK, minor, term to 2028-03-04
- CAMERON COUNTY DRAINAGE DISTRICT 5 MS4, Harlingen: TXR040243, minor, term to 2024-01-23
- CAMPEROS NO 1, San Benito: TXR1534RC, minor, term to 2028-03-04
- CARRIAGE HILLS SUBDIVISION, Abilene: TXR1545NK, minor, term to 2028-03-04
- CHICK-FIL-A - SAN BENITO TX 5787, San Benito: TXR1530TY, minor, term to 2028-03-04
What stands out
- Its term runs 2 years and 101 days, November 24, 2025 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | TUSCANY HILLS SUBDIVISION PHASE I |
|---|---|
| Permittee | Solid Development Inc. |
| NPDES ID | TXR1527WO |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | November 24, 2025 |
| Expires | March 4, 2028 |
| Address | Harlingen, TX 78550 |
| Receiving water | CAMERON COUNTY DRAINAGE DISTRICT NO 5 |
| Subwatershed | Line V Canal-Arroyo Colorado (HUC 121102080700) |
NPDES TXR1527WO: effluent limits and exceedances
TUSCANY HILLS SUBDIVISION PHASE I (NPDES TXR1527WO): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1527WO: no pollutant row on file.
NPDES TXR1527WO: inspections, violations and enforcement
NPDES TXR1527WO (TUSCANY HILLS SUBDIVISION PHASE I): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1527WO
NPDES TXR1527WO: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1527WO
NPDES TXR1527WO: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.