NPDES TXR1528OC · Clean Water Act
COTALAND PHASE 1, Austin, TX: NPDES TXR1528OC discharge permit, effluent exceedances, inspections, penalties
COTALAND PHASE 1, Austin, Texas: General permit coverage TXR1528OC, held by Diamond One Construction Inc.; Construction stormwater; Effective; issued August 22, 2023, term to March 4, 2028; discharges to DRY CREEK.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 3,547 were issued before TXR1528OC.
Coverages issued nearest TXR1528OC
- 2023-08-22: EASTERN WELLS, Jarrell: TXR1519OC, held by Continental Homes Of Texas, L.P.
- 2023-08-22: SOUTHWEST ARANSAS COUNTY, Aransas Pass: TXR1522OC, held by Lcr Total Transport LLC
- 2023-08-22: ARANSAS COUNTY HOLIDAY BEACH, Rockport: TXR1523OC, held by Lcr Total Transport LLC
- 2023-08-22: CHC PROSPER, Prosper: TXR1525OC, held by Fast-Trak Construction, Inc.
- 2023-08-22: THE RIDGE AT TUSCOLA, Tuscola: TXR1526OC, held by Hunter Chase Construction, LLC
- 2023-08-22: NAISMITH SUBSTATION CONSTRUCTION PROJECT, Gregory: TXR1529OC, held by AEP Texas Inc.
- 2023-08-22: RED ROCK TO LOCKHART TO LULING, Red Rock: TXR1532OC, held by Ec Source Services, LLC
- 2023-08-22: HICKORY RIDGE WWTP, Elmendorf: TXR1533OC, held by Chapman Bros. Inc.
- 2023-08-22: HIGHLAND LAKES, Mckinney: TXR1534OC, held by Taylor Morrison of Texas, Inc.
- 2023-08-22: LAKESIDE BAYOU, Texas City: TXR1536OC, held by Lakeside Bayou, LLC
COTALAND PHASE 1 among its neighbors
76 discharge permits are in the Red Gully Creek-Dry Creek subwatershed (HUC 120903010109); TXR1528OC is one. Its county: 1,099, 15 major; TXR1528OC is minor permit.
Other permits in the Red Gully Creek-Dry Creek subwatershed (HUC 120903010109)
- AERE APARTMENTS AT EASTON PARK, Austin: TXR1571YF, minor, term to 2028-03-04
- AIRFIELD 130, Del Valle: TXR1540OT, minor, term to 2028-03-04
- AMERICAN MINERAL, Del Valle: TXR05GT02, minor, term to 2026-08-13
- AUSTIN SURF CLUB, Del Valle: TXR1533SC, minor, term to 2028-03-04
- BASTROP ELEMENTARY SCHOOL 10, Cedar Creek: TXR1562XT, minor, term to 2028-03-04
- BASTROP ENERGY CENTER, Cedar Creek: TXR1509XE, minor, term to 2028-03-04
- BGICO LLC, Buda: TX0146277, minor, term to 2031-01-29
- CAPITAL CONCRETE PRODUCTS, Del Valle: TXR05FN13, minor, term to 2026-08-13
- CEDAR CREEK WWTP, Bastrop: TX0144207, minor, term to 2031-05-13
- COLTON TO ELROY T658 TRANSMISSION LINE OVERHAUL, Austin: TXR1557XK, minor, term to 2028-03-04
What stands out
- Its term runs 4 years and 195 days, August 22, 2023 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | COTALAND PHASE 1 |
|---|---|
| Permittee | Diamond One Construction Inc. |
| NPDES ID | TXR1528OC |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | August 22, 2023 |
| Expires | March 4, 2028 |
| Address | Austin, TX 78617 |
| Receiving water | DRY CREEK |
| Subwatershed | Red Gully Creek-Dry Creek (HUC 120903010109) |
NPDES TXR1528OC: effluent limits and exceedances
COTALAND PHASE 1 (NPDES TXR1528OC): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1528OC: no pollutant row on file.
NPDES TXR1528OC: inspections, violations and enforcement
NPDES TXR1528OC (COTALAND PHASE 1): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1528OC
NPDES TXR1528OC: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1528OC
NPDES TXR1528OC: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.