NPDES TXR1538VJ · Clean Water Act
SAN GABRIEL PKWY, Leander, TX: NPDES TXR1538VJ discharge permit, effluent exceedances, inspections, penalties
SAN GABRIEL PKWY, Leander, Texas: General permit coverage TXR1538VJ, held by Environmental Allies, LLC; Construction stormwater; Effective; issued July 29, 2025, term to March 4, 2028; discharges to BRUSHY CREEK ABOVE SOUTH BRUSHY CREEK.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 14,875 were issued before TXR1538VJ. Environmental Allies, LLC holds 66 permits in Texas.
Other permits held by Environmental Allies, LLC
- ENVIRONMENTAL ALLIES - CONCRETE BATCH PLANT, Houston: TXR05GP09, issued 2024-12-13
- BAYSIDE TERRACE DRAINAGE IMPROVEMENTS, La Porte: TXR1502NU, issued 2023-07-28
- T101 - HC 220122 - GENERAL REPAIRS IN SOUTH HARRI, Katy: TXR1505OT, issued 2023-10-19
- CARPENTERS BAYOU TRAIL AND PEDESTIRAN BIKE BRIDGE, Houston: TXR1511RZ, issued 2024-08-30
- HCFCD 250370 MAJOR REPAIRS TO BRAYS BAYOU FOR THE, Houston: TXR1511XK, issued 2026-02-20
- HC 240076-EXTENSION OF MOUND ROAD FROM GREENHOUSE, Cypress: TXR1513QW, issued 2024-05-14
- NW HC MUD 24-PROPOSED ASHCREEK SIDEWALKS AND RAMPS, Houston: TXR1514YH, issued 2026-05-18
- TXDOT-CCSJ 0976-01-047 - HARRIS FM 865, Houston: TXR1515XO, issued 2026-03-06
- BEAR CREEK VILLAGE SUBDIVISION DRAINAGE IMPROVEMENTS, Houston: TXR1517MZ, issued 2023-05-31
- WIDENING & CONCRETE REHAB OF ANDERS LANE, Kemah: TXR1517QZ, issued 2024-05-27
Coverages issued nearest TXR1538VJ
- 2025-07-28: SUNSET AMPHITHEATER - COMMERCIAL, Mckinney: TXR1593VI, held by Crossland Construction Company INC.
- 2025-07-28: SUNSET AMPHITHEATER - OFFSITE - COMMERCIAL, Mckinney: TXR1594VI, held by Crossland Construction Company INC.
- 2025-07-28: BARTON CREEK RANCH RECREATION CENTER, Conroe: TXR1597VI, held by Millis Development And Construction, LLC
- 2025-07-28: MEADOWS PHASE 7, Mabank: TXR1598VI, held by Weaver Excavating & Septic LLC
- 2025-07-28: EAGLE CREEK PH 1 & PH 4, Denton: TXR1599VI, held by KB Home Lone Star Inc.
- 2025-07-29: LINE WA LOOP PHASE 2 LAYDOWN YARD, Mineral Wells: TXR1539VJ, held by Atmos Energy Corporation
- 2025-07-29: 2024-0105 PLAYA DRAIN SUP, El Paso: TXR1541VJ, held by City of El Paso
- 2025-07-29: BEACON POINT, Texas City: TXR1542VJ, held by Chesmar Homes, LLC
- 2025-07-29: BLUE HERON ESTATES, Mont Belvieu: TXR1543VJ, held by Chesmar Homes, LLC
- 2025-07-29: MATADOR TO MULETA TRANSMISSION LINE REBUILD, Matador: TXR1544VJ, held by AEP Texas Inc.
SAN GABRIEL PKWY among its neighbors
159 discharge permits are in the South Brushy Creek-Brushy Creek subwatershed (HUC 120702050401); TXR1538VJ is one. Its county: 965, 17 major; TXR1538VJ is minor permit.
Other permits in the South Brushy Creek-Brushy Creek subwatershed (HUC 120702050401)
- 0151-10-001 US 183A FROM RM 1431 TO AVERY RANCH BLVD, Cedar Park: TXR1512UW, minor, term to 2028-03-04
- 0151-10-001 US 183A FROM RM 1431 TO AVERY RANCH BLVD, Cedar Park: TXR1597UV, minor, term to 2028-03-04
- 1210 CYPRESS CREEK ROAD, Cedar Park: TXR1538VG, minor, term to 2028-03-04
- 1210 CYPRESS CREEK ROAD, Cedar Park: TXR1587VG, minor, term to 2028-03-04
- 1325 RETAIL CENTER, Cedar Park: TXR1556SV, minor, term to 2028-03-04
- ACCUSHARP DEVELOPMENT, Leander: TXR1581YQ, minor, term to 2028-03-04
- ARKA MONTESSORI SCHOOL, Leander: TXR1586WO, minor, term to 2028-03-04
- ARROW POINT, Cedar Park: TXR1508XR, minor, term to 2028-03-04
- ARROWPOINT LOTS 2 & 4, Cedar Park: TXR1566MA, minor, term to 2028-03-04
- AUSTIN LANDSCAPE SUPPLIES WHOLESALE, Georgetown: TXR15264O, minor, term to 2023-03-05
What stands out
- Its term runs 2 years and 219 days, July 29, 2025 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SAN GABRIEL PKWY |
|---|---|
| Permittee | Environmental Allies, LLC |
| NPDES ID | TXR1538VJ |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | July 29, 2025 |
| Expires | March 4, 2028 |
| Address | Leander, TX 78641 |
| Receiving water | BRUSHY CREEK ABOVE SOUTH BRUSHY CREEK |
| Subwatershed | South Brushy Creek-Brushy Creek (HUC 120702050401) |
NPDES TXR1538VJ: effluent limits and exceedances
SAN GABRIEL PKWY (NPDES TXR1538VJ): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1538VJ: no pollutant row on file.
NPDES TXR1538VJ: inspections, violations and enforcement
NPDES TXR1538VJ (SAN GABRIEL PKWY): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1538VJ
NPDES TXR1538VJ: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1538VJ
NPDES TXR1538VJ: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.