NPDES TXR1539XU · Clean Water Act
SAN MARCOS SUBSTATION S179 ADDITION, San Marcos, TX: NPDES TXR1539XU discharge permit, effluent exceedances, inspections, penalties
SAN MARCOS SUBSTATION S179 ADDITION, San Marcos, Texas: General permit coverage TXR1539XU, held by Saber Power Services, LLC; Construction stormwater; Effective; issued March 31, 2026, term to March 4, 2028; discharges to SAN MARCOS RIVER.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 19,985 were issued before TXR1539XU. Saber Power Services, LLC holds 27 permits in Texas.
Other permits held by Saber Power Services, LLC
- EAST WEST 120MW BESS & 13834.5KV SUBSTATION, Mountain Home: TXR1501VY, issued 2025-09-23
- OVERLAND SUBSTATION S812 ADDITION, Fort Stockton: TXR1503XK, issued 2026-02-19
- SAN MARCOS SUBSTATION, San Marcos: TXR1508SL, issued 2024-10-15
- BAKERFIELD SYNCHRONOUS CONDENSER, Fort Stockton: TXR1514WJ, issued 2025-11-05
- PASTOR SUBSTATION S805 ADDITON, Paint Rock: TXR1519XD, issued 2026-01-28
- JOHN DUMAS SUBSTATION ADDITION, Maxwell: TXR1520NY, issued 2023-08-10
- ROCK ROSE BESS, Needville: TXR1521WT, issued 2025-12-15
- COUNTY LINE SUBSTATION, Cedar Creek: TXR1523YE, issued 2026-05-07
- HIGHLINE SUBSTATION, Cedar Creek: TXR1530XS, issued 2026-03-23
- MULSHOE 345 KV SUBSTATION, Gail: TXR1531YP, issued 2026-06-18
Coverages issued nearest TXR1539XU
- 2026-03-30: CSJ 0921-02-322, Pentias: TXR1534XU, held by HIDALGO COUNTY PRECINCT 3
- 2026-03-30: ROCK CREEK PHASE 2, Fort Worth: TXR1535XU, held by DUKE INC., GENERAL CONTRACTORS
- 2026-03-30: BLUEBONNET CROSSING, Waco: TXR1536XU, held by Southrock, LLC
- 2026-03-30: WEST BASTROP VILLAGE - POND PARK 1-3 - ADELTON AMENITY, Bastrop: TXR1537XU, held by Adventures Outback L.P.
- 2026-03-31: UNIVERSITY OF HOUSTON HSC SCIENCE FIRE SPRINKLER UPGRADE, Houston: TXR1538XU, held by J.T. Vaughn Construction, LLC
- 2026-03-31: DEL WEBB BRIDGELAND, Cypress: TXR1540XU, held by Pulte Homes of Texas, L.P.
- 2026-03-31: INDIAN CREEK COMMUNITY, Brownwood: TXR1541XU, held by Trafalgar Homes Of Texas, LLC
- 2026-03-31: ENCHANTED OAKS ESTATES, Terrell: TXR1542XU, held by Nortex RediMix, LLC
- 2026-03-31: THE SALVATION ARMY STEMMONS CAMPUS, Dallas: TXR1545XU, held by Atmos Energy Corporation
- 2026-03-31: JUNG TRACT UNIT 2, San Antonio: TXR1546XU, held by City Public Service Energy
SAN MARCOS SUBSTATION S179 ADDITION among its neighbors
28 discharge permits are in the Purgatory Creek-San Marcos River subwatershed (HUC 121002030302); TXR1539XU is one. Its county: 410, 3 major; TXR1539XU is minor permit.
Other permits in the Purgatory Creek-San Marcos River subwatershed (HUC 121002030302)
- 222 WEST HOLLAND STREET, San Marcos: TXR1546RD, minor, term to 2028-03-04
- CITY OF SAN MARCOS, San Marcos: TXR05FR83, minor, term to 2026-08-13
- CITY OF SAN MARCOS MS4, San Marcos: TXR040485, minor, term to 2024-01-23
- CITY OF SAN MARCOS WASTEWATER TREATMENT FACILITY, San Marcos: TXR05FA0J, minor, term to 2026-02-28
- DEL SAN XAVIER, San Marcos: TXR1555GL, minor, term to 2023-03-04
- KISSING TREE PHASE 8B, San Marcos: TXR1565UN, minor, term to 2028-03-04
- KISSING TREE PHASE 8C, San Marcos: TXR1577XY, minor, term to 2028-03-04
- KISSING TREE TRUNK HILL WATER FACILITY, San Marcos: TXR1547QN, minor, term to 2028-03-04
- LA CIMA, San Marcos: TXR1507NY, minor, term to 2028-03-04
- LA CIMA, San Marcos: TXR1587SW, minor, term to 2028-03-04
What stands out
- Its term runs 1 year and 339 days, March 31, 2026 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | SAN MARCOS SUBSTATION S179 ADDITION |
|---|---|
| Permittee | Saber Power Services, LLC |
| NPDES ID | TXR1539XU |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 31, 2026 |
| Expires | March 4, 2028 |
| Address | San Marcos, TX 78666 |
| Receiving water | SAN MARCOS RIVER |
| Receiving water impaired | 303(D) Listed |
| Subwatershed | Purgatory Creek-San Marcos River (HUC 121002030302) |
NPDES TXR1539XU: effluent limits and exceedances
SAN MARCOS SUBSTATION S179 ADDITION (NPDES TXR1539XU): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1539XU: no pollutant row on file.
NPDES TXR1539XU: inspections, violations and enforcement
NPDES TXR1539XU (SAN MARCOS SUBSTATION S179 ADDITION): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1539XU
NPDES TXR1539XU: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1539XU
NPDES TXR1539XU: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.