NPDES TXR1540MA · Clean Water Act
X-BOW SYSTEMS LULING OPERATIONS, Luling, TX: NPDES TXR1540MA discharge permit, effluent exceedances, inspections, penalties
X-BOW SYSTEMS LULING OPERATIONS, Luling, Texas: General permit coverage TXR1540MA, held by X-Bow Launch Systems Inc.; Construction stormwater; Effective; issued March 7, 2023, term to March 4, 2028; discharges to SALT BRANCH.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 960 were issued before TXR1540MA. X-Bow Launch Systems Inc. holds 2 permits in Texas.
Other permits held by X-Bow Launch Systems Inc.
- X-BOW SYSTEMS LULING OPERATIONS, Luling: TXR05FW22, issued 2022-10-25
Coverages issued nearest TXR1540MA
- 2023-03-07: AMES BOULEVARD PHASE 2, Iowa Colony: TXR1535MA, held by Northtex Construction, LLC
- 2023-03-07: CORRIDOR H - SAM BASS ROAD, Round Rock: TXR1536MA, held by Cash Construction Company, Inc.
- 2023-03-07: GCPL AC MITIGATION PROJECT, Jones: TXR1537MA, held by The Dow Chemical Company
- 2023-03-07: SUNDANCE ESTATES, Lubbock: TXR1538MA, held by Lubbock Lifetime Homes, LLC
- 2023-03-07: GILBERT VILLAS ADDITION BATCH PLANT AND PAVING, Grand Prairie: TXR1539MA, held by Glenn Thurman, Inc.
- 2023-03-07: WYLIE WYE CONSTRUCTION PROJECT, Wylie: TXR1542MA, held by The Kansas City Southern Railway Company
- 2023-03-07: BAIRD BLVD PH 1, Iowa Colony: TXR1546MA, held by Northtex Construction, LLC
- 2023-03-07: ST FAUSTINA CATHOLIC CHURCH, Fulshear: TXR1549MA, held by Mills Equipment, LLC
- 2023-03-07: BEAR CREEK RANCH, Aledo: TXR1550MA, held by John Askew Company
- 2023-03-07: STONECREEK ESTATES SECTION 13, Rosenberg: TXR1551MA, held by DeCrosta Construction, LLC
X-BOW SYSTEMS LULING OPERATIONS among its neighbors
7 discharge permits are in the Seals Creek-San Marcos River subwatershed (HUC 121002030502); TXR1540MA is one.
Other permits in the Seals Creek-San Marcos River subwatershed (HUC 121002030502)
- LULING ISD SHANKLIN ES GERDES JHS LULING PRIM, Luling: TXR1545BV, minor, term to 2023-03-04
- LULING SOUTH WWTP, Luling: TX0022772, minor, term to 2023-08-14
- LULING SPORT, Luling: TXR1559LZ, minor, term to 2028-03-04
- RELIABLE FORMULATIONS, Luling: TXR05GZ57, minor, term to 2026-08-13
- SH 80 F 2B24 283 CSJ 0287-03-036, Gonzales: TXR1569SQ, minor, term to 2028-03-04
- SH 80 F 2B24 283 CSJ 0287-03-036, Gonzales: TXR1597SQ, minor, term to 2028-03-04
What stands out
- Its term runs 4 years and 363 days, March 7, 2023 to March 4, 2028.
- No dated event in the 365 days to September 15, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility | X-BOW SYSTEMS LULING OPERATIONS |
|---|---|
| Permittee | X-Bow Launch Systems Inc. |
| NPDES ID | TXR1540MA |
| Status | Effective |
| Type | General permit coverage |
| Class | Minor |
| Facility type | Non-POTW |
| Program | Construction stormwater |
| Issued | March 7, 2023 |
| Expires | March 4, 2028 |
| Address | Luling, TX 78648 |
| Receiving water | SALT BRANCH |
| Subwatershed | Seals Creek-San Marcos River (HUC 121002030502) |
NPDES TXR1540MA: effluent limits and exceedances
X-BOW SYSTEMS LULING OPERATIONS (NPDES TXR1540MA): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.
NPDES TXR1540MA: no pollutant row on file.
NPDES TXR1540MA: inspections, violations and enforcement
NPDES TXR1540MA (X-BOW SYSTEMS LULING OPERATIONS): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.
Watch NPDES TXR1540MA
NPDES TXR1540MA: one email when its EPA record changes — $99/month.
Permits near NPDES TXR1540MA
NPDES TXR1540MA: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.