Velarion Records
Free: one email when NPDES TXR1540XZ changes. Unsubscribe any time.

NPDES TXR1540XZ · Clean Water Act

SUMMER SKY NORTH UNIT TWO PHASE I, Horizon City, TX: NPDES TXR1540XZ discharge permit, effluent exceedances, inspections, penalties

SUMMER SKY NORTH UNIT TWO PHASE I, Horizon City, Texas: General permit coverage TXR1540XZ, held by Edwards Homes of El Paso, LLC; Construction stormwater; Effective; issued April 20, 2026, term to March 4, 2028; discharges to RIO GRANDE.

Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 20,441 were issued before TXR1540XZ. Edwards Homes of El Paso, LLC holds 17 permits in Texas.

Other permits held by Edwards Homes of El Paso, LLC

Coverages issued nearest TXR1540XZ

SUMMER SKY NORTH UNIT TWO PHASE I among its neighbors

191 discharge permits are in the Franklin Drain-Rio Grande subwatershed (HUC 130401000203); TXR1540XZ is one. Its county: 532, 6 major; TXR1540XZ is minor permit.

Other permits in the Franklin Drain-Rio Grande subwatershed (HUC 130401000203)

What stands out

  • Its term runs 1 year and 319 days, April 20, 2026 to March 4, 2028.
  • No dated event in the 365 days to September 15, 2026.
  • It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.

Identity

FacilitySUMMER SKY NORTH UNIT TWO PHASE I
PermitteeEdwards Homes of El Paso, LLC
NPDES IDTXR1540XZ
StatusEffective
TypeGeneral permit coverage
ClassMinor
Facility typeNon-POTW
ProgramConstruction stormwater
IssuedApril 20, 2026
ExpiresMarch 4, 2028
AddressHorizon City, TX 79928
Receiving waterRIO GRANDE
SubwatershedFranklin Drain-Rio Grande (HUC 130401000203)

NPDES TXR1540XZ: effluent limits and exceedances

SUMMER SKY NORTH UNIT TWO PHASE I (NPDES TXR1540XZ): 0 pollutants on file, 0 limited; 0 with a violation of any kind, 0 with an exceedance.

NPDES TXR1540XZ: no pollutant row on file.

NPDES TXR1540XZ: inspections, violations and enforcement

NPDES TXR1540XZ (SUMMER SKY NORTH UNIT TWO PHASE I): no single-event violation, inspection, formal enforcement action and informal enforcement action on file.

Watch NPDES TXR1540XZ

NPDES TXR1540XZ: one email when its EPA record changes — $99/month.

Billing

Privacy

Permits near NPDES TXR1540XZ

NPDES TXR1540XZ: 0 pollutant rows, 0 dated events; ICIS-NPDES download, loaded September 15, 2026.