Clean Water Act discharge permit · NPDES TXR1541UT
PHASE 2 CONSTRUCTION DART COTTON BELT REGIONAL TRAIL, Addison, TX: NPDES TXR1541UT discharge permit, effluent exceedances, inspections, penalties
- EffectivePermit status
- MinorDischarger class
- 0Pollutants under a numeric limit
- 0Pollutants with an effluent exceedance
- 0Inspections on file
- 0Formal enforcement actions
PHASE 2 CONSTRUCTION DART COTTON BELT REGIONAL TRAIL, held by Archer Western Contractors, LLC, holds NPDES permit TXR1541UT, which discharges to White Rock Crk. EPA’s file records it issued May 29, 2025 and expiring March 4, 2028. The status and dates are as EPA’s permit file stood when Velarion loaded it (October 14, 2026); EPA’s free Detailed Facility Report on ECHO carries the permit’s current standing.
What the register holds for PHASE 2 CONSTRUCTION DART COTTON BELT REGIONAL TRAIL: its NPDES ID, its permit type and status, its dates, its address in Addison, Texas, its receiving water. EPA’s effluent violation file and its single-event violation file hold no violation for NPDES TXR1541UT.
What stands out
- Its term runs 2 years and 280 days, May 29, 2025 to March 4, 2028.
- No dated event in the 365 days to October 14, 2026.
- It is one of 39,714 discharge permits on the register in Texas; 23,986 of them (60%) are in its program, Construction stormwater, and it is a minor discharger.
Identity
| Facility as filed | PHASE 2 CONSTRUCTION DART COTTON BELT REGIONAL TRAIL |
|---|---|
| Permittee as filed | Archer Western Contractors, LLC |
| NPDES ID | TXR1541UT |
| Permit status | Effective |
| Permit type | Coverage under a general permit |
| Discharger class | Minor discharger |
| Facility type | Not a publicly owned treatment works |
| Program | Construction stormwater |
| Issued | May 29, 2025 |
| Expiration date | March 4, 2028 |
| Address | Addison, TX 75001 |
| Receiving water | WHITE ROCK CRK |
| Subwatershed | Farmers Branch-Elm Fork Trinity River (HUC 120301031005) |
| SIC | 1629 – Heavy Construction |
Cited to the EPA ICIS-NPDES permit file (ECHO download) and EPA’s NAICS/SIC and component files, the same download.
Effluent limits and exceedances
- 0Pollutants on file
- 0Under a numeric limit
- 0With a violation of any kind
- 0With an effluent exceedance
EPA’s limits and effluent violation files hold no pollutant row for NPDES TXR1541UT.
Cited to the EPA ICIS-NPDES limits and effluent violations files (ECHO download); up to 60 rows shown, most exceedances first.
Inspections, violations and enforcement
- 0Single-event violations
EPA’s single-event violation file, as loaded, holds no violation for NPDES TXR1541UT.
Inspections
EPA’s inspection file holds no inspection for NPDES TXR1541UT.
Formal enforcement and penalties
0 formal actions, 0 of them with a penalty assessed. Federal and state penalties are separate figures from separate authorities and are shown as each was filed, never added together.
Informal enforcement
EPA’s informal enforcement file holds no action for NPDES TXR1541UT.
Cited to the EPA ICIS-NPDES violation, inspection and enforcement files (ECHO download); up to 50 rows of each shown, newest first.
Watch this permit
One permit holder, $99/month. Watch the register for one permit holder and the places and receiving waters tied to its permits. Choose “One permit holder” and enter this permit’s NPDES ID, TXR1541UT.
Start the watch
- One permit holder — $99/month
- One watershed — $2,990/year
- One state — $4,990/year
- The whole register — $18,000/year
How we handle your data → Privacy
EPA publishes a free Detailed Facility Report for every permit on ECHO: its compliance status quarter by quarter, its inspections, and its enforcement actions and penalties. EPA also sends free notices of new inspections and enforcement actions through ECHO Notify; enter NPDES ID TXR1541UT there.
PHASE 2 CONSTRUCTION DART COTTON BELT REGIONAL TRAIL, Addison, Texas: Coverage under a general permit TXR1541UT, held by Archer Western Contractors, LLC; Construction stormwater; Effective; issued May 29, 2025, term to March 4, 2028; discharges to WHITE ROCK CRK.
Texas holds 23,986 Construction stormwater coverages of this permit type in EPA’s file; 13,665 were issued before TXR1541UT. Archer Western Contractors, LLC holds 3 permits in Texas.
Other permits held by Archer Western Contractors, LLC
- PARKING LOT 6E & YARD 41, Dallas: TXR1508UI, issued 2025-04-17
- DFWIA INTERNATIONAL PARKWAY BRIDGES AND HIGH MAST PHASE 2, Dallas: TXR1555PT, issued 2024-01-31
Coverages issued nearest TXR1541UT
- 2025-05-29: STONEHAWK ROSEHILL, Garland: TXR1534UT, held by Stonehawk Woodford Gc, LLC
- 2025-05-29: ENCLAVE AT EASTON PARK APARTMENTS, Austin: TXR1535UT, held by Enclave Easton Park, LP
- 2025-05-29: SOUTH AIRFIELD BATCH PLANT, Euless: TXR1536UT, held by Cowtown Redi Mix, Inc.
- 2025-05-29: BOBCAT TRUCKING - HMP, New Braunfels: TXR1537UT, held by Bobcat Services, Inc.
- 2025-05-29: EDEN RANCH, Arlington: TXR1539UT, held by Conatser Construction Tx, LP
- 2025-05-29: LOT 3 BLOCK 3 PINNACLE INDUSTRIAL CENTER UNIT 14, Laredo: TXR1542UT, held by 3E Civil Construction
- 2025-05-29: BRAYS BAYOU GREENWAYS TRAIL SEGMENTS, Houston: TXR1544UT, held by Queen Constructors, LLC
- 2025-05-29: GREENS PRAIRIE RESERVE 404, College Station: TXR1545UT, held by Cedar Beam Homes
- 2025-05-29: TXDOT PHR CSJ 0255-07-140, Edinburg: TXR1546UT, held by Texas Department of Transportation
- 2025-05-29: MUSTANG PARK MULTI-GENERATIONAL RECREATION AND AQUATICS CENT, Irving: TXR1547UT, held by Steele & Freeman, Inc.
PHASE 2 CONSTRUCTION DART COTTON BELT REGIONAL TRAIL among its neighbors
86 discharge permits are in the Farmers Branch-Elm Fork Trinity River subwatershed (HUC 120301031005); TXR1541UT is one. Its county: 1,595, 15 major; TXR1541UT is minor permit.
Other permits in the Farmers Branch-Elm Fork Trinity River subwatershed (HUC 120301031005)
- 10848 LUNA ROAD, Dallas: TXR05FH39, minor, term to 2026-08-13
- 11221 TANTOR RD, Dallas: TXR05GA23, minor, term to 2026-08-13
- 1840 RYAN ROAD, Dallas: TXR05EX77, minor, term to 2026-08-13
- 1990 WITTINGTON PLACE, Farmers Branch: TXR1506XU, minor, term to 2028-03-04
- 1990 WITTINGTON PLACE, Farmers Branch: TXR1559XT, minor, term to 2028-03-04
- 3C ENVIORNMENTAL SOLUTIONS, Carrollton: TXRNECK84, minor, term to 2026-08-13
- 635 EXCHANGE, Dallas: TXR1597UG, minor, term to 2028-03-04
- ADDISON RESERVE TOWNHOMES ADDISON TX, Addison: TXR1544MF, minor, term to 2028-03-04
- AER MANUFACTURING 3405 WILEY POST, Carrollton: TXR05EY59, minor, term to 2026-08-13
- AER MANUFACTURING 3405 WILEY POST, Carrollton: TXR1509VL, minor, term to 2028-03-04
Nearby on the register
- Discharge permits in Addison
- Every permit record in Addison, A to Z
- Discharge permits in Texas
- Every permit record in Texas, A to Z
Figures from EPA’s ICIS-NPDES download, loaded October 14, 2026.
What this page shows
PHASE 2 CONSTRUCTION DART COTTON BELT REGIONAL TRAIL is one of 640 storm water construction permits on EPA's NPDES register in Dallas County. It is also part of the 86 NPDES permits in the Farmers Branch-Elm Fork Trinity River subwatershed (HUC 120301031005). Among the 638 storm water construction permits in Dallas County, 53.3% have an earlier issue date than this permit, while 0.0% of the 640 permits in the county have a violation on file.